Title: STRATEGIC%20PLAN
1STRATEGIC PLAN PRESENTATION TO THE PARLIAMENTARY
PORTFOLIO COMMITTEE ON TRANSPORT 14 March
2007 by ZAKES MYEZA Chief Executive Officer
2INDEX
- Vision, Mission, Values and SACAA Act
- Operational Environment
- SACAA Profile
- Purpose of Strategic Document
- Situational Analysis
- Set Priorities
- Five (5) Strategic Objectives
- Key Analysis Current Situation
- Strategy Planning Process
3INDEX Cont..
- Implementation of Strategy
- Strategy Roll out
- Financial Implications
- Conclusion
4VISION
- REGULATORY EXCELLENCE IN AVIATION SAFETY AND
SECURITY
5MISSION
THE SACAA IS A PLAYER IN THE INTERNATIONAL ARENA
THAT SEEKS TO PROMOTE AND MAINTAIN A SAFE AND
SECURE CIVIL AVIATION ENVIRONMENT IN SOUTH
AFRICA, BY REGULATING AND OVERSEEING THE FUNCTION
OF THE INDUSTRY IN AN EFFICIENT, COST EFFECTIVE,
SUSTAINABLE AND CUSTOMER FRIENDLY MANNER
6SACAA VALUES
- COMMITMENT
- RESPONSIBILITY
- ACCOUNTABILITY
- CONSISTENCY
- KNOWLEDGE-SHARING
- INTEGRITY AND
- TRANSPARENCY
7OBJECTIVES OF SACAA
- The SACAA was established on 01 October 1998
under - South African Civil Aviation Act No 40 as a stand
alone civil - aviation authority. Its objectives are as
follows - To control and regulate civil aviation in the
Republic, and - To oversee the functioning and development of the
civil aviation industry, and, in particular, to
control, regulate and promote civil aviation
safety and security.
8SACAA PROFILE RACIAL COMPOSITION
9SACAA PROFILE Cont GENDER COMPOSITION
10PURPOSE OF STRATEGIC DOCUMENT
- The purpose of the strategic document is to
- Define the process involved in strategy
formulation - Document the short-term strategy for ICAO
readiness by June 2007 - Document other short to medium term strategies
by prioritising outcomes, and stratifying them
in the expected years - Use the document for performance agreements
with stake holders - Use the document for divisional score cards and
in turn individual scorecards that are linked to
the Performance Management System.
11SITUATIONAL ANALYSIS SACAA LEGACY
- The CEO appointed March 2006 conducted a
situational analysis/ review of SACAAs business
environment. The findings identified the
organisation as a dysfunctional one and was
manifested by the following - Conflict of interest, e.g. Execs and Senior
Managers are also Union members - Incoherent and misaligned structure leading to
structural conflicts and process disconnects. - Culture of non-performance.
- Low employee morale and no confidence in top
management. - Poor systems and processes
- Poor industry view of organization's competence.
12SITUATIONAL ANALYSIS - SACAA LEGACY Cont..
- Negative findings in 1999 audit and 2001
follow-up by the International Civil Aviation
Organization (ICAO). - Many of these findings were not corrected in the
six (6) years since the audit - This was reconfirmed by United States Federal
Aviation Authority technical review
conducted in June 2006. - In September 2006 an immediate survival strategy
was developed and continues to be in place
focusing mainly on strategic objective one. - (Emphasis will be on human resource
requirements, strategic objective 5, as this is
the ultimate risk in ICAO compliance)
13SET PRIORITIES
- Following the remedial actions submitted to, and
approved by - the Board in 2006, the following actions were
prioritised. - To pass the July 2007 ICAO audit
- Build technical and managerial staff and skills
levels - Implement the performance management system and
set meaningful targets - (The Board formulated five (5) strategic
objectives to address short-term and long-term
strategic goals)
14STRATEGIC OBJECTIVES
- Below is a summary of five objectives of the
SACAA that were - approved by the Board
- 1. Set civil aviation safety and security
standards and regulate industry compliance in
accordance with International Civil Aviation
Organisation (ICAO) standards and global best
practices. - 2. Facilitate aviation industry functioning,
development and growth by participating in joint
fora, making safety and security recommendations
and promoting safety and security through
campaigns and information dissemination - 3. Build effective organization systems and
processes in order to ensure financial stability,
good corporate governance and performance
excellence that meet or exceed stakeholder
expectations.
15STRATEGIC OBJECTIVES Cont..
- 4. Ensure growing customer satisfaction by
creating a knowledge-based and customer-focused
organization - 5. Attract, develop and retain skilled human
capital.
16KEY ANALYSIS
- Having gone through the background of the
organisation, it is - important to note the current situation of the
SACAA by taking - you through the findings of a recent Strengths,
Weaknesses, - Opportunities, and Threats (SWOT) analysis.
-
17KEY ANALYSIS - STRENGTHS
- The following were strengths identified in the
SWOT analysis - The SACAA was recognised as an international
player of note in Africa. - A Chief Executive Officer had been appointed by
the Board and given a mandate and resources to
turn the organisation around - Department of Transport (DoT) support for
positive change. - ISO accredited status.
- Some committed staff members needing leadership
and motivation.
18KEY ANALYSIS - WEAKNESS
- The following are weaknesses identified in the
SWOT - analysis
- Unresolved negative audit findings identified
in the ICAO Audit in 1999 and 2001. - Insufficient technical skills
- Top management skills gap
- Poor systems of control
- Lack of customer focus
- Lack of some key staff
- Lack of SACAAs credibility in the industry.
19KEY ANALYSIS OPPORTUNITIES
- The following opportunities were identified in
the SWOT analysis - International respect and recognition. (ICAO
compliance is a global status for SACAA). - Status as Africas gateway, with significant
economic spin-offs for South Africa. - Remarkable influence on the development of
policies and standards affecting the civil
aviation industry in SADC and Africa in general. - Becoming a benchmark for efficiency in the
regulation of civil aviation.
20KEY ANALYSIS - THREATS
- The following threats were identified in the SWOT
analysis - Failure to pass the ICAO audit could lead to
dire consequences. - Failure to pass the International Aviation
Safety Assessment (IASA) audit - Industrial unrest due to the implementation of
a Performance Management System (change
resistance) - Negative influences on some staff by previous
management to prevent exposure of past
mismanagement. - Loss of existing critical skills
21STRATEGY PLANNING PROCESS- CONTENT
- The following strategic section is made up of
the sub-topics - tabulated below.
- Strategy development and roll out process
- Strategy objectives and implementation
- Conclusion
-
22STRATEGY PLANNING PROCESS CONTENT Cont
- The following are two major divisions of the
strategy development - process
- Strategy Development Process
- The first slide will tabulate the meticulous
strategy development process demonstrating the
all inclusive approach. - Strategy Roll Out
- The Second slide tabulates the roll out of the
strategy i.e the implementation or use of the
strategy. In this case the end result is the
completion of employee scorecards laying a good
foundation for performance management. - A good strategy not implemented, is of no
use. -
23STRATEGIC PLANNING PROCESS
DOT Performance Agreement
Board Strategic Objectives
Key Accountability Matrix
Management Strategic Planning Workshop
Development of Strategic Framework
Board Strategic Planning Workshop
Development of SACAA Strategic Plan
ICAO Critical Elements
SACAA Strategic Plan Roll-out
Identified Core Business
24STRATEGY ROLL-OUT MAP
25STRATEGIC OBJECTIVESAND IMPLEMENTATION
26STRATEGIC OBJECTIVES IMPLEMENTATION
- The following slides will address implementation
on the five - strategic objectives by categorising them under
the following - Outcomes per year of focus
- The desired outcomes are listed per strategic
objective with the percentage of focus in each
year. - Critical Success Factors
- Critical success factors to enable outcomes are
noted under each strategic objective. - Action Plan
- Action plans to achieve the stated outcomes are
tabulated under each strategic objective
27STRATEGIC OBJECTIVES IMPLEMENTATION
- Instrument of Control
- Each strategic objective has tools to view or
ensure progress - on the stated outcomes.
- The following three instruments of control will
be used on the - five strategic objectives accordingly
- Project Plans
- Performance Scorecards
- Executive Management Feedback
28STRATEGIC OBJECTIVE 1
- Set civil aviation safety and security standards
and regulate - Industry compliance in accordance with
International Civil - Aviation Organisation (ICAO) standards and global
best - practices.
29OBJECTIVE 1 - OUTCOMES
OUTCOMES Yr 1 Yr 2 Yr 3
Understandable and comprehensive legislation to effectively oversee the industry and meet requirements of (ICAO) 90 10
Civil Aviation Regulations and Technical standards to be fully implemented and updated simultaneously with ICAO pronouncements. 100
Meet oversight requirements by implementing a functional organisational structure that will provide effective oversight and the resolution of findings and perform in depth audits. 100
Technical personnel appropriately trained to maintain and enhance their competence at the desired level. 90 10
A comprehensive technical library that is easily accessible and is consistent with best practice. 70 20 10
Civil Aviation Regulations (CAR's) and Civil Aviation Technical Standards (CATS) personnel are all appropriately licensed and all licences and certificates are issued in time in a computerised environment. 100
Proactive system to proactively perform audits and inspections in accordance with CARs, CATS ICAO requirements resulting in a reduction of accidents/incidents/occurrences 70 20 10
Enhanced safety levels that facilitate a paradigm shift in industry mentality to voluntary compliance rather than punitive. 60 20 20
30OBJECTIVE 1 CSF
- Critical Success Factors
- The following are critical success factors in
meeting the above - objective and realising the desired outcomes
- Enforcement capability through adequate and
trained staff - Timeous promulgation of Acts
- Thorough consultation with industry during the
Act amendment - Effective administrative processes and systems
to be put in place -
31OBJECTIVE 1 ACTION PLAN
- Action Plan
- The following action plans will ensure the
achievement of the - stated objective.
- Establish electronic links with ICAO to obtain
alerts to the Standards and Recommended
Practices (SARPS) - Facilitate the combination of the CEO and
Commissioner for Civil Aviation (CCA) positions
into one - Redesign the organisational structure to
support effective oversight and resolution
findings - Develop and implement a comprehensive skills
plan programme. - Establish a comprehensive technical library
- Develop an integrated surveillance system
32STRATEGIC OBJECTIVE 2
- Facilitate aviation industry functioning,
development and - growth by participating in joint fora, making
safety and - security recommendations and promoting safety and
- security through campaigns and information
dissemination.
33OBJECTIVE 2 - OUTCOMES
OUTCOMES Yr 1 Yr 2 Yr 3
A developed industry with more aviation institutions whilst improving safety and security infrastructure. 20 50 30
More HDIs in technical positions 80 10 10
BEE partnerships established and the aviation charter implemented. 100
Increased industry and public awareness in matters of safety and strategic partners identified. 100
Increased support of the DOT programs. 100
Increased involvement in SADC and African and Indian Ocean Islands aviation development. 15 75 10
34OBJECTIVE 2 CSF
- Critical Success Factors
- The following are critical success factors in
meeting the objective - and realising the desired outcomes
- A regional and global focus to
facilitate/support growth of local aviation
industry. - Clear guidance, complete practical
regulations, and faster legislative processes. - Use of experts to ensure rule-making
implications are fully recognised. - Accurate statistics and accessibility to
information.
35OBJECTIVE 2 CSF Cont..
- Industry liaison, workshops and awareness
- Support from tertiary institutions.
- DOT plans and programmes communicated in advance
for proper resource allocation and time for
planning purposes. - Harmonisation of regulations and systems through
SADC - Promotion of BEE Partnerships.
36OBJECTIVE 2 ACTION PLAN
- Action Plan
- The following action plans will ensure the
achievement of the - Stated objective.
- Establishment of detailed operator guidelines
- Develop a comprehensive talent management plan
that addresses HDI requirements. - Establish policies and procedures to promote
BEE partnerships - Develop a communication and awareness programme
that includes institutions of higher learning. - Include the attendance of DOT as a generic KPA
on the performance scorecard. - Institute exchange programmes with SADC and
other international aviation authorities.
37STRATEGIC OBJECTIVE 3
- Build effective organization systems and
processes in order - to ensure financial stability, good corporate
governance and - performance excellence that meet or exceed
stakeholder - expectations.
38OBJECTIVE 3 - OUTCOMES
OUTCOMES Yr 1 Yr 2 Yr 3
Best practice in corporate governance in use. 100
A comprehensive risk management plan in use. 100
An accessible and secure information management system with reduced reliance on a manual record system with the aim of moving to a paperless system. 100
An integrated decision support system that enables access of key information and global statistics by management as well as support system for effective decision making. 80 20
A sustainable income stream commensurate with the challenges of ICAO, improved financial control and adherence to the PFMA. 100
Improved organizational performance and a flexible organisation structure to achieve strategic goals. 90 10
ISO compliance. 100
39OBJECTIVE 3 CSF
- Critical Success Factors
- The following are critical success factors in
meeting the objective - and realising the desired outcomes
- Initiate project to move to a paperless
environment. - Improvement of budgetary controls.
- A solid project plan to improve systems and
processes.
40OBJECTIVE 3 ACTION PLAN
- Action Plan
- The following action plans will ensure the
achievement of the - stated objective
- Development and implementation of an accessible
and secure information management system that
will lead to reduced reliance on a manual record
system. - Implement software for statistical input
analysis - Obtain approval from DOT and cabinet for the
increase of rates of various income streams.
41OBJECTIVE 3 ACTION PLAN Cont..
- Implement the performance management system
- Distribute PFMA to management and obtain
acknowledgement - of receipt.
- Develop and implement an enterprise wide risk
management plan. - Conduct ISO audits to ensure compliance.
42STRATEGIC OBJECTIVE 4
- Ensure growing customer satisfaction by creating
a - knowledge based and customer focused organization
43OBJECTIVE 4 - OUTCOMES
OUTCOMES Yr 1 Yr 2 Yr 3
The use of a secure, comprehensive, accurate and relevant information system providing industry knowledge base, allowing online access to customers. 50 50
Improved and standardized inspector skills and guidance material contributing to improved service levels and guidance to the industry. 70 30
Adherence to the customer service charter 100
An effective customer communication strategy implemented. 100
Primary source / hub of industry information and knowledge resource 30 70
44OBJECTIVE 4 CSF
- Critical Success Factors
- The following are critical success factors in
meeting the above - objective and realising the desired outcomes
- Customer oriented culture developed.
- Fully developed guidance material.
45OBJECTIVE 4 ACTION PLAN
- Action Plan
- The following action plans will ensure the
achievement of the - stated objective.
- Establish an online industry information hub
- Enhance and standardise inspectors guidance
material - Conduct customer surveys and service audits
- Implementation of an effective customer
communication strategy
46STRATEGIC OBJECTIVE 5
- Attract, develop and retain skilled human
capital.
47OBJECTIVE 5 - OUTCOMES
OUTCOMES Yr 1 Yr 2 Yr 3
A cost effective tool providing accurate, reliable employee information to the Company to facilitate timeous, strategic business decisions 45 45 10
An overarching HR Strategy which is aligned to the overall business strategy and strategic business objectives 70 30
A transformed organization that embraces diverse individual capabilities and affords equal opportunities for meaningful participation. 50 40 10
An HR business approach that will deliver value adding strategic partnerships and HR best practices. 100
Aligned and standardized HR processes, policies, practices and procedures. 80 20
Management of Human Capital through integrated and aligned HR process (that forms part of employee life cycle) to meet future business needs 45 45 10
Efficient day-to-day processing of transactions and delivery within the HR Department 50 50
Sound cooperative relationships between the leadership and employees established and maintained. 70 30
48OBJECTIVE 5 CSF
- Critical Success Factors
- The following are critical success factors in
meeting the objective - and realising the desired outcomes
- HR credibility within the business
- Developed policy and procedural frameworks
- HR record systems developed
- Informed and skilled HR staff
- Talent management system implemented
- Formulation of partnership structures and their
function working agreed upon between employee
representatives and the leadership
49OBJECTIVE 5 ACTION PLAN
- Action Plan
- The following action plans will ensure the
achievement of the - stated objective.
- Audit the Human Resources Systems and
processes - Implement a Human Resources Information
Management System - Development of an effective Human Resources
Strategy - Facilitate organisational transformation and
change management policy
50OBJECTIVE 5 ACTION PLAN Cont..
- Facilitate organisational transformation and a
change management policy - Establish procedures and policies to facilitate a
Human Resources Business Partner mindset - Establish a HR Governance Framework through
Policies and Procedures - Institute control mechanisms to ensure effective
transactional delivery - Perform employee / position cross matching.
51STRATEGY ROLL - OUT
- The completion of the strategic document mean the
following - actions will be taken
- DOT performance agreement can now be finalised
- SA CAA Organisational Scorecard based on
expected outcomes may be completed (Key
Accountability Matrix of the organisation
already completed) - Divisional scorecards based on the
accountability matrix can be completed. - All staff performance scorecards based on
their divisional ones can be completed.
52 FINANCIAL IMPLICATIONS
53FINANCIAL IMPLICATIONS CLASS A1 PROJECT
- The pending International Civil Aviation
Organisation (ICAO) - audit in July 2007 resulted in the following
- A review of the organisation done in 2006
highlighted long outstanding unresolved findings
that address the 8 ICAO critical elements. - Class A1 project being implemented after Board
approval in - September 2006 to ensure a clean audit by ICAO.
- R56m budget approved for the Class A1 Project
that takes place in the 2006/ 7 and 2007/ 8
financial years.
54FINANCIAL IMPLICATIONS CLASS A1 PROJECT
- The Class A1 project funds were to be used for
addressing the - legacy of the dysfunctional SA CAA by
- Training of existing technical personnel to bring
them to an - acceptable level of competence.
- Recruitment of locals and expatriate technical
skills in order to be compliant by set date. - Procuring assistance from the ICAO to ensure
readiness for June 2007 audit. - Improving of processes and systems in order to
implement best practice. - Sub-contracting critical elements in the project
plan in order to ensure delivery by set date. - Class A1 project being implemented after Board
approval in September 2006 to ensure a clean
audit by ICAO. - R56m budget approved for the Class A1 Project
that takes place in the 2006/7 and 2007/8
Financial years
55FINANCIAL IMPACT 2007/ 8
The following 2007/ 8 figures are inclusive of
the A1 project. R Revenue 197,812,355
Expenses 243,064,658 Deficit
(45,252,303) Capital Expenditure
16,557,000 (There is cash available to finance
the deficit)
56FINANCIAL IMPACT 2007/ 8
The Class A1 project causes the following
deficits 1. In 2006/ 7 a R1,5m surplus was
budgeted, however, a revised budget/forecast
shows a deficit of R11,5m as a result of the A1
Project spreading over two financial years. 2.
In 2007/ 8 a deficit of R45,2m is budgeted
otherwise this would have been a break even
budget. It should be noted that the the R45,2m
deficit is an accounting deficit as there are
cash reserves to finance the above amount.
Therefore this is not a request for funding.
57CORPORATE GOVERNANCE
In line with corporate governance the following
processes will follow in order to approve the
budget deficit for 2007/8. 1. An exemption
has been applied for in terms of section 53 (3)
of the Public Finance Management Act that states
that public institutions can not budget for a
loss unless prior approval is granted by National
Treasury. 2. The SACAA Board approval has
been put in motion and the date of the
deliberation on the above matter is set for the
15th of March 2007.
58CONCLUSION
Finally, the SA CAA demonstrated inclusivity,
transparency, and analytical prowess in its
development of this strategy. The SA CAA believes
that its business strategy is not only
relevant to the challenges facing the
organisation but also progressive and in line
with the aims and objectives of the new South
Africa. The portfolio committee is accordingly
requested to take note of, and endorse the SA
CAAs Strategic Plan for the period 2007 to 2010.
59 THANK YOU!!