Handling of FMPMTs at the MPE - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Handling of FMPMTs at the MPE

Description:

verify that all pins are properly connected to the flying leads. verify that flying leads and bonds are intact using a magnifying glass ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 8
Provided by: extraterre
Category:

less

Transcript and Presenter's Notes

Title: Handling of FMPMTs at the MPE


1
Handling of FM-PMTs at the MPE
  • All aspects of the MPE PMT incoming inspecting
    concerning
  • the recently at DJO observed problem of
    falling-off flying leads
  • visual inspection
  • verify that all pins are properly connected to
    the flying leads
  • verify that flying leads and bonds are intact
    using a magnifying glass
  • some PMTs with missing or additional flying leads
    were found
  • mechanical stress during electrical test
  • mounting of PMT into the electrical measurement
    setup
  • see following picture gallery
  • never a flying lead came off during this
    procedure

2
FM-PMT inside plastic cover
3
removing the PMT plastic cover
4
threading the PMT flying leads
  • The PMT flying leads are thread into the mounting
    helper disk
  • Difficult procedure
  • during this procedure larger mechanical stress
    could not be avoided
  • BUT never a flying lead came off (valid for all
    240 FM PMTS)

5
threading the PMT flying leads
  • Success All flying leads are threaded into the
    mounting disk

6
PMT holding device with VD
VD
Connectors for flying leads
7
Inserting a PMT into the holding device
Mounting helper disk
  • Inserting the PMT into the holding device from
    the side using the PMT mounting helper disk
Write a Comment
User Comments (0)
About PowerShow.com