King Fahd University of Petroleum and Minerals - PowerPoint PPT Presentation

About This Presentation
Title:

King Fahd University of Petroleum and Minerals

Description:

... even inside, and planning to enjoy their vacation, and this is their first one. ... Generate Ideas: Here below are alternative ideas proposed to be studied ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 25
Provided by: facultyK
Category:

less

Transcript and Presenter's Notes

Title: King Fahd University of Petroleum and Minerals


1
King Fahd University of Petroleum and Minerals
  • Department of Construction Engineering and
    Management
  • Value Engineering
  • CEM512
  • Term Project
  • VE in Family Trip
  • Supervised by Dr. Sadi Assaf
  • Prepared by Fahad Al-Azzaz

2
Content
  1. Introduction
  2. VE Job Plan
  3. QA

3
1- Introduction
  • The idea of this VE term project is a common
    issue faced on yearly by family members here in
    KSA families been working the whole year, and a
    month or two before this leave they start
    thinking where to go this year. Family members
    are 4 persons.
  • Our project here in is to find the VE for the
    best family trip package for a Saudi family
    never traveled outside the kingdom or even
    inside, and planning to enjoy their vacation,
    and this is their first one.
  • cont.

4
Cont.
  • Note
  • Facts were collected from the market.
  • Its a simple example, as such idea is a common
    practice, and it can be seen that the traveling
    agencies are competing hardly to get more
    travelers promoting their items using
    alternative attractive promotions and offers.
  • This VE is applicable to Eastern Province Area
    market.

5
2- VE Job Plan
  • 2.1- Information Phase
  • 2.2- Functional Phase
  • 2.3- Creative Phase
  • 2.4- Evaluation Phase
  • 2.5- Development Phase
  • 2.6- Audit Phase

6
2.1- Information Phase
  • Project Information and Familys Item Criteria
  • As mentioned before, the project or the task of
    the VE is to select the best traveling package to
    be purchased for the familys annual leave. As
    such selection should make sure it achieves the
    least traveling cost and covering its purpose /
    desired function perfectly.
  • The main proposal was to have a 2 weeks trip to
    Abha in Saudi Arabia. Since the family never been
    outside the Eastern Province.
  • cont.

7
Cont.
  • The familys criteria for the package is
  • a- The package shouldnt exceeds the assigned
    budget (SR 25,000).
  • b- The package to be 2 weeks.
  • c- Flight duration is not more than 4 hours(/-
    20 minutes).
  • d- Family Entertainment.
  • e- Historical places to be visited.
  • f- Natural Scene.
  • e- Weather should be nice enough.
  • cont.

8
Cont.
  • consultation concerning the package from
  • 1- Friends traveling with their families for the
    last five years.
  • 2- Traveling agencies.
  • Cont.

9
Cont.
  • Performance Criteria
  • Objective or Required Criteria
  • 1- To meet the criteria listed under project
    criteria and mainly that related to budget,
    entertainment, flight duration.
  • 2- Reasonable weather and natural scene that
    make the trip enjoyable.
  • Goals, Desired Criteria or Features
  • 1- relaxation.
  • 2- reasonable expenditure.
  • cont.

10
Cont.
Price Item
3000 Tickets
9800 Accommodation
7000 Daily Expenses
19800 Total
  • Original Proposal Cost Data
  • the cost for a two weeks trip with all
    expenditures turned to be SR 19,800.

11
2.2- Functional Phase
  • Functional Worksheet



  • cont.

Why? Function How?
Package meet the Budget To serve the desired function /enjoy annual leave To have the proper decision
W/ Low flight duration Meet the proper criteria Meeting the set out criteria of the project
W/ Low Expenditures Shopping Entertainment Meeting the set out criteria of the project
12
Cont.
  • Identify Item Function
  • What does it do?
  • verb noun
  • Enjoy Vacation
  • Visit historical Places
  • Entertain Family
  • what must it do?
  • verb noun
  • Enjoy Vacation
  • Visit historical Places
  • Entertain Family

13
2.3- Creative Phase
  • Generate Ideas
  • Here below are alternative ideas proposed to be
    studied and evaluated to choose the best
    alternative
  • 1- Dubai-UAE
  • 2- Beirut-Lebanon
  • 3- Cairo-Egypt
  • 4- Ankara-Turkey
  • 5- Salalah-Oman
  • cont.

14
Cont.
No. Car Brand Name / Particular Cost / Package Other Expenditures Total
01 Dubai-UAE SR3,600 17,200 SR20,800
02 Beirut-Lebanon SR6,000 19,000 SR25,000
03 Cairo-Egypt SR6,000 12,875 SR18,875
04 Ankara-Turkey SR8,800 14,450 SR23,250
05 Salalah-Oman SR4,000 13,125 SR17,125
06 Abha-KSA SR3,000 16,800 SR19,800
Cont.
15
2.4- Evaluation Phase
  • Feasibility Ranking
  • Expenditure
  • Flight Duration
  • Entertainment
  • Weather
  • Historical Places
  • Natural Scene

  • Total Rank
  • Abha 3 3 8 6
    10 9 39 5
  • Dubai 3 4 4 9
    8 7 35 5
  • Beirut 8 9 8 7 6
    5 43 4
  • Cairo 7 10 6 10
    7 9 49 1
  • Ankara 9 10 8 7
    5 9 48 2
  • Salalah 9 8 10 5
    8 7 47 3
  • Cont.

16
Idea Comparison
Idea Advantages Disadvantages
Dubai Short flight duration, family entertainment No historical places to visit
Beirut Medium flight duration, family entertainment, historical places, nice weather Daily expenses
Cairo Medium flight duration, family entertainment, historical places Weather is hot
Ankara Family entertainment, historical places, nice weather Long flight duration
Salalah historical places, nice weather, Short flight duration Entertainment
.
17
Cont.
  • Determining Weights for Evaluation
  • Goals, Desired Criteria, Functions and Features
  • Raw Score Assigned Weight
  • A- Expenditures 8 10
  • B- Flight Duration 6 8
  • C- Entertainment 5 4
  • D- Weather 3 3
  • E- Historical Places 2 2
  • F- Natural Scene 1 1
  • Scoring Matrix
  • B C D E F
  • A A/B A/C A-3 A-1 A-2
  • B B-1 B/D B-2 B-1
  • C C/D C-3 C-1
  • D D/E D/F E E-1
  • How Important

18
Cont.
  • Evaluation Matrix
  • Natural Scenes
  • Historical Places
  • Weather
  • Entertainment
  • Flight Duration
  • Expenditure

  • Total Rank
  • Abha 2 5 2 4
    1 3 85 5
  • Dubai 2 5 4 1
    1 1 82 6
  • Beirut 3 4 5 5
    4 4 109 3
  • Cairo 4 4 4 3
    5 3 110 2
  • Ankara 5 2 5 5
    5 4 115 1
  • Salalah 3 3 2 4
    4 5 87 4

10 8 4 3 2 1
19
Cont.
  • Savings
  • on this study it shows that there was no saving,
    but the main faunction has been satisfied and
    maximized with an additional amount of money
  • Item Initial Cost
  • 1- Abha SR19,800
  • 2- Ankara SR23,250
  • Addition in initial cost SR3,450
  • 17 Addition
  • Life Cycle Cost Results
  • Expenditures were assumed to be considered as
    life cycle cost in this trip
  • Idea Expenditures
  • 1- Abha SR16,800
  • 2- Ankara SR14,450
  • Saving in Life Cost Cycle
    SR2,350 13.98reduction
  • cont.

20
2.5- Development Phase
  • Value Study Summary (Ranked-1 Proposal)
  • The ranked 1 proposal has alternative benefits
    superior on the others which lead to the choosing
    of this proposal and such profits are as follows
  • 1- Entertainment is more.
  • 2- Expenditure is decreasing, so in case the
    family want to extend the vacation it will not
    cost more money.
  • 3- Historical Places visited are old and
    multi-cultural.
  • 4- Natural Scenes are better than those in Abha.
  • For that, the proposed ranked-1 idea will meet
    the project criteria although extra money to be
    added but the main function were maximized.
  • cont.

21
Cont.
  • Implementation Phase
  • Alternative questions to be implemented to
    ensure VE implementation properly. These
    questions are as follows
  • 1- How should it be implemented?
  • The proposed case to be presented to the family
    members for their review and approval.
  • 2- What should be changed and in what sequence?
  • The proposed idea after being presented and
    explained in comparison to other ideas and on
    the basis of actual facts and gathered
    information from friends, the package should be
    changed to Ankara and made all required
    reservations




  • cont.

22
Cont.
  • 3- Who should do it?
  • The traveling agency should change package to
    Ankara.
  • 4- How long should it take to implement the
    proposal?
  • it is only one day visit to the agency office.
  • 5- Any deadline required
  • as earlier as possible since seats are
    available.

23
2.6- Audit Phase
  • The audit phase will be taking place within the
    family members to go ahead and purchase the
    package and a final project report to be
    submitted to the father.

24
Thank youQA
Write a Comment
User Comments (0)
About PowerShow.com