1
INFILTRATION ALTERNATIVES
  • Issaquah Highlands
  • Prepared by the City of Issaquah Major
    Development Review Team
  • June 2004

2
Issaquah Highlands Stormwater Alternatives
  • 3 distinct alternatives that may be separated and
    combined into numerous variations
  • Developed from the White Paper conclusions
    recommendations and Comments/Questions submitted
    as part of the process
  • All alternatives meet EIS/Development Agreement
    expectations/provisions
  • Alternatives for Microsoft are not included in
    Alternatives 1, 2 3 as their facilities will
    remain private (see discussion in last slide)

3
INFILTRATION ALTERNATIVES
ALTERNATIVE 1
ALTERNATIVE 2
ALTERNATIVE 3
AGRESSIVE REPAIR TO SLIDE AREA (20 CFS)
SAME AS ALT 1
NOMINAL REPAIR TO SLIDE AREA (4 CFS)
ADD EARLY WARNING SYSTEMS TO SLOPES
ADD DETENTION BASED ON 6 cfs CAPACITY IN
LOWER REID
ADD DETENTION BASED ON EXPANDED CAPACITY IN
LOWER REID
ADD 3 cfs CAPACITY IN LOWER REID (9 cfs total)
RE-TEST AND RE-VEST INFILTRATION RATES
ADD SMALL OUTLETS (DISPERSED INFILTRATION) EAST
OF BPA
SAME AS ALT 1
SAME AS ALT 1
CONTINUE WORKING W/ MICROSOFT (see Microsoft
slide)
SAME AS ALT 1
UTILIZE HILLTOP INFILTRATION SYSTEMS
PLACE HILLTOP SYSTEMS ON STANDBY (NOT MICROSOFT)
4
ALTERNATIVE 1
Additional detention (location undetermined) to
support 9 cfs L. Reid infiltration)
Install safety controls at L. Reid
Add capacity at L. Reid (9 cfs total)
Add GW monitors
Repair slide area for 4 cfs capacity (2 cfs
more than background)
Place hilltop infiltration systems on standby
5
ALTERNATIVE 2
Drill new Monitoring wells perform more
exploration
Test and re-vest infiltration rates (32 cfs
target)
Repair slide area for 20 cfs capacity (18 cfs
more than background and 12 cfs less than pipe)
Install Early Warning Devices
6
ALTERNATIVE 3
Build dispersed Infiltration East of BPA (3 cfs
target)
Additional detention (location undetermined) to
support 6 cfs _at_ L. Reid
Install safety Controls _at_ L. Reid
Place hilltop infiltration systems on standby
Repair slide area for 4 cfs capacity (2 cfs
more than background)
7
Comparison
Alternative
?1
?
?
? Probable but not guaranteed ?1 easterly
infiltration may result in slope stability issues
8
Summary
9
Microsoft
  • Microsoft has expressed a preference for
    continuing the vesting process for hilltop
    infiltration. As their facilities will remain
    privately owned and maintained, the Citys
    concerns are primarily focused on environmental
    issues.
  • Should it be determined that hilltop infiltration
    from the Microsoft pond at a rate necessary to
    accommodate all of their expected runoff would
    result in compromising slope stability, the
    following alternatives may be feasible and will
    be explored
  • stop testing for added infiltration and build
    detention necessary for 2 cfs rate (determined to
    be stable)
  • join the public system (upper Reid, flow
    splitter, etc.)
  • build Valley infiltration system (similar to
    Lower Reid)
  • use small scale infiltrators at each building
  • reclassify the panhandle (not the DNR site) and
    make a direct stream release w/o infiltration
    (subject to LIVA recharge need)