Title: THE I-75 DAYTON RECONSTRUCTION


1
THE I-75 DAYTON RECONSTRUCTION
2
I-75 RECONSTRUCTION
  • THREE MAJOR PROJECTS TO
  • RECONSTRUCT I-75 BETWEEN SR 4
  • AND US 35
  • ADD 1 LANE EACH DIRECTION
  • REDUCE NB 90 DEGREE CURVE
  • REDUCE NO. OF RAMPS
  • PHASE 1A SPRING 2007 FALL 2009
  • PHASE 1B SPRING 2008 FALL 2009
  • PHASE 2 SPRING 2011 FALL 2013

3
SR 4
1A
I-75 IN DOWNTOWN DAYTON PHASES 1A, 1B, 2
2
1B
US 35
4
SYSTEM CONFIGURATION
  • 2 DYNAMIC MESSAGE SIGNS
  • 7 CCTV CAMERAS / VEHICLE
  • DETECTION STATIONS
  • 4 HIGHWAY ADVISORY RADIOS
  • 2 CCTV INSTALLED ON ROOF OF
  • MONTGOMERY COUNTY BUILDING

5
FEATURES
  • MOST DEVICES INSTALLED ON
  • TEMPORARY BASIS
  • WIRELESS COMMUNICATIONS FOR
  • ALL DEVICES
  • ONLY DMS WILL BE PERMANENT
  • WEEKDAY/DAYTIME CONTROL FROM
  • D7 OFFICE IN VANDALIA
  • NIGHTTIME/WEEKEND CONTROL
  • FROM ARTIMIS

6
TRAFFIC MANAGEMENT CENTER
7
CCTV LOCATIONS
8
CAMERAS ON ROOF OF THE MONTGOMERY COUNTY BUILDING
9
DYNAMIC MESSAGESIGNS
10
HAR LOCATIONS
11
TRAVEL TIME WILL BE ACQUIRED FOR AN 8-MILE
SECTION ENCOMPASSING THE WORK ZONES OF ALL 3
CONSTRUCTION PHASES CALCULATION BASED UPON
EITHER LICENSE PLATE READERS OR CELLULAR PHONE
TRACKING
12
(No Transcript)
13
OPPORTUNITIES TO LEVERAGE INFRASTRUCTURE
14
  • IN SUMMARY
  • EARLY DEPLOYMENT OF PORTION
  • OF REGIONAL FMS
  • MAINTENANCE OF TRAFFIC
  • LEVERAGE INFRASTRUCTURE
  • FROM PLANNED ROADWAY PROJECTS