MAIN PASS 252A CRANE INCIDENT

Description:

Crane operator had very limited view of boom at coolers. ... Spotter to be positioned below coolers with radio communication when accessing ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 11
Provided by: sepcocon
Category:
Tags: 252a | crane | incident | main | pass | coolers

less

Transcript and Presenter's Notes

Title: MAIN PASS 252A CRANE INCIDENT


1
MAIN PASS 252A CRANE INCIDENT
  • September 9th, 2007

2
Leading up to the Incident
  • Construction crew was on site preparing for
    planned shut in of facility.
  • Operations asked to borrow constructions Shell
    approved crane operator.
  • Job was permitted and JSEA was attached.
  • Operations personnel and the crane operator
    reviewed the JSEA prior to beginning work.

3
The Tasks
  • Pull the tubing bundle from the
  • WHRU Heat Exchanger
  • Inspect
  • Reinstall

4
WHRU HEAT EXCHANGERLocated on Deck 1 Blind
lift for Crane Operator35 below crane cab
elevation
WHRU Heat Exchanger End of
exchanger where bundle was pulled.
5
Crane Position
Crane was boomed down at this Radius in order to
reach WHRU Tubing Bundle.
6
Close Up View of Cooler
Line depicts boom position as in Previous slide.
7
Overview of Facts
  • Crane was positioned by radio directions from
    personnel at WHRU exchanger. (unable to see boom)
  • Crane operator had very limited view of boom at
    coolers.
  • Bundle was guided out and load was taken by
    crane.
  • Bundle was inspected and reinstalled.
  • Upon laying boom back in the rest crane operator
    immediately noticed bent section and reported it
    to the facility PIC.

8
Incident Investigation
  • Permit and JSEA written and approved for job,
    JSEA should have been more detailed for crane
    operations.
  • Hazard of cooler proximity to boom has existed
    since the C-900 Compressor Package was installed
    and never properly addressed.
  • Additional personnel should have been assigned to
    the task during crane operations.

9
Damage to Boom
10
Safety Measures Enacted as a result of this
Incident
  • Spotter to be positioned below coolers with radio
    communication when accessing South West side of
    Deck 1 or heliport.
  • JSEAs will include detailed steps when crane
    lifts are made in close proximity to Living
    Quarters and Compressor Coolers.
  • Shell Crane Group and Civil to investigate the
    option of relocating the crane for safer
    operations.
  • Looking at additional physical barriers that can
    be installed at coolers and or boom for further
    protection.