Decision%20Support%20System: - PowerPoint PPT Presentation

About This Presentation
Title:

Decision%20Support%20System:

Description:

Properly applied, data mining can reveal hidden relationships and information ... G. M. Marakas, 2003, 'Modern Data Warehousing, Mining, and Visualization' ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 9
Provided by: davidab
Category:

less

Transcript and Presenter's Notes

Title: Decision%20Support%20System:


1
Chapter 8 Models and Decision Support
  • Decision Support System
  • DSS is an interactive IT system that creates new
    information on demand to help you make
    nonstructural decisions.

2
  • Components of Decision Support System (p.295)

3
  • Why do we use models? (p.290)
  • Understand process
  • Optimization
  • Prediction
  • Simulation
  • Problems when using models
  • Complexity of model
  • Cost of model
  • Error of model

4
  • Popular Decision Support Models
  • Prediction regression model, other statistical
    model.
  • What-If analysis simulation
  • Optimization models Optimization models seek the
    best solution where decision need to be made in a
    constrained or limited resource environment. An
    optimization model has its objective function,
    decision variables and constraints.
  • Heuristic methods A heuristic is a practical
    and quick method based on intuitive and plausible
    arguments that likely to (but not guaranteed to)
    lead to a solution that is approximately optimal
    or near optimal.
  • K. G. Murty, 1995, Operations Research.

5
  • Why many managers still seem to prefer heuristic
    method?
  • There are no optimization algorithms to find the
    optimum solutions to many large scale problems in
    real business world within acceptable computer
    time.
  • Because of errors in the data, an optimal
    solution can only be a good solution for the real
    problem and serves the same purpose as a good but
    simple heuristic.

6
  • Example Optimum solution and a good solution by
    heuristic. Capacity is 35 hours.
  • Optimum solution projects 2, 5, and 7. Profit
    351.
  • Greedy heuristic projects 7, 5, and 1. Profit
    348.

Project Hours Profit Profit/Hour
1 3 21 7
2 4 24 6
3 3 12 4
4 21 168 8
5 15 135 9
6 13 26 1
7 16 192 12
8 20 200 10
9 40 800 Eliminate
7
  • Data Mining
  • A collection of data analysis techniques for
    extremely large dataset.
  • Properly applied, data mining can reveal hidden
    relationships and information buried within the
    data warehouse..
  • G. M. Marakas, 2003, Modern Data Warehousing,
    Mining, and Visualization.

8
  • The purpose to use EIS
  • Display transaction data in a form of overall
    picture.
  • Provide easy access to corporate data for
    executives.
  • Advantages of EIS
  • Top executive can retrieve data without waiting
    for report.
  • Data of all functional areas are retrieved from
    the same system a better big picture.
  • Drill down to get more detailed data.
  • Comparison of time series and cross-sectional
    data.
  • The data is nonintrusive (a copy of the
    transaction data).
Write a Comment
User Comments (0)
About PowerShow.com