Enterprise Project Management Methodology Training - PowerPoint PPT Presentation

1 / 80
About This Presentation
Title:

Enterprise Project Management Methodology Training

Description:

Be specific about how a lesson might apply to your project. ... Copy and past the list of deliverables into the Work Plan and build tasks around ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 81
Provided by: rmo78
Category:

less

Transcript and Presenter's Notes

Title: Enterprise Project Management Methodology Training


1
Enterprise Project Management Methodology Training
  • Initiation Phase

2
Governance Structure, Team Roles and
Responsibilities
Definition
Governance is the organization of
responsibilities and decision-making
capabilities that apply to a project. It is
also referred to as an organizational chart.
Importance
Key Tasks
Deliverables
It identifies the teams, who will make key
decisions on the project as well as those who
will actually implement the project.
Best Practices
It consists of oversight committees, steering
committees, business analysts, technical
resources, outreach coordinators, trainers and
other personnel, as appropriate.
3
Why is Establishing a Governance Structure
Important?
Definition
People need to know what they are responsible
for
  • It provides a foundation for organizing,
    consistent planning and executing of projects
    tasks are clearly identified for each team so
    that work is not duplicated and there is a clear
    chain of command

Importance
Key Tasks
Deliverables
Best Practices
Projects will run into obstacles
  • It is important to have a group of decision
    makers that can resolve issues in a timely manner
    and will not hinder the project scope,
    implementation timeline or cost.

Stakeholder buy-in will lead to project success
  • It provides structure, accountability and
    involvement, so stakeholders are more likely to
    champion the project.

4
Governance Structure, Team Roles and
Responsibilities
Definition
  • Determine if there is a start up project
    governance structure in place.
  • Check with your agency PMO, or adapt any
    workgroups or committees that may have been
    established in the strategy Phase.

Importance
Key Tasks
Deliverables
Best Practices
5
Project Governance Structure Example
6
Governance Structure, Team Roles and
Responsibilities
  • Identify which key teams are appropriate within
    your governance structure

Definition
Importance
Key Tasks
Deliverables
Best Practices
7
Governance Structure, Team Roles and
Responsibilities
Definition
  • If an existing structure does not exist, key team
    members will need to work with appropriate
    executive leadership to define a governance
    structure for the project.
  • Structurally, establish how the different teams
    will relate to each other and to the project
    manager, which will help assign roles later.
  • Once a structure has been identified, define what
    type of work will be done by each team on the
    governance structure.

Importance
Key Tasks
Deliverables
Best Practices
8
Governance Structure, Team Roles and
Responsibilities
Definition
  • Next, identify key roles for each team member on
    the project be sure to also develop
    responsibilities for each role on the project.

Importance
Key Tasks
Deliverables
Best Practices
Executive Sponsors
Business Analysts
Stakeholders
Technical Analysts
Trainers
Project Manager
Team Leads
Communications Specialists
9
Governance Structure, Team Roles and
Responsibilities
Definition
  • Once the governance structure is complete,
    populate key leadership positions with personnel.
  • Initially, you will need to identify the
    personnel who will help you complete all tasks
    within the Initiation Phase.
  • Consider involving people from among your
    informal network of contacts, with whom you have
    worked with before successfully.

Importance
Key Tasks
Deliverables
Best Practices
10
Governance Structure, Team Roles and
Responsibilities
Definition
Importance
Key Tasks
Deliverables
Best Practices
11
Governance Structure, Team Roles and
Responsibilities
Definition
  • When identifying the roles and responsibilities
    for your project, consider
  • Who will handle security issues including access
    to the system and potential malicious attacks?
  • Place personnel who may become obstacles to the
    project on teams where their input can be
    addressed.

Importance
Key Tasks
Deliverables
Best Practices
12
Governance Structure, Team Roles and
Responsibilities
Definition
  • Consider developing a RACI Matrix
  • It identifies those teams, roles or individuals
    which are Responsible, Accountable, Consulted and
    Informed on various aspects of a project.

Importance
Key Tasks
Deliverables
Best Practices
Key Roles
Key Tasks
13
Discussion/Questions
14
Develop Project Charter
Definition
The project charter is a formal document that
defines and describes the project at a high
level. It covers business drivers, critical
success factors, goals, objectives and guiding
principles.
Importance
Key Tasks
Deliverables
The project charter formalizes the existence of
a project and demonstrates management support
for the project.
Best Practices
The document functions as the formal agreement
for the project and is signed by the appropriate
parties. Changes to the charter result in the
creation of a new project.
15
Why is Developing a Project Charter Important?
To make sure everyone is on the same page
Definition
  • It is important to make sure that all executive
    stakeholders are on the same page with regard to
    what is expected. If not, it can cause
    unnecessary time and cost to be spent in the
    wrong areas.

Importance
Key Tasks
Deliverables
To communicate to appropriate personnel
Best Practices
  • Once the charter is established, it can serve as
    a communication tool to make sure all team
    members have the same strategic direction in
    mind.

To gauge changes to the project scope
  • All changes to scope should be in line with the
    project charter if not, the change request
    should be denied or the project charter should be
    modified.

16
Develop Project Charter
Definition
  • Elements of the Charter
  • Project Background and Description
  • Business Need/Opportunity (also referred to as
    the Problem Statement)
  • Business Drivers
  • Business imperatives which require this
    initiative to move forward
  • For each business driver, document a critical
    success factor that must be accomplished to
    support the business driver
  • Benefits the initiative will achieve
  • High Level Goals and Objectives
  • Assumptions and Constraints

Importance
Key Tasks
Deliverables
Best Practices
17
Develop Project Charter
Definition
Importance
Key Tasks
Deliverables
Best Practices
18
View Project Charter Template
Click Here
OA/OIT websitehttp//www.oit.state.pa.us
19
View Project Charter Example
Click Here
OA/OIT websitehttp//www.oit.state.pa.us
20
Develop Project Charter
Definition
  • Make sure the right people are involved in
    developing and signing off on the project charter
  • Focus on getting consensus and buy-in up front
    if enough time is NOT spent getting stakeholders
    on the same page, it could impact the project
    timeline and cost
  • Dont breeze through this exercise allot
    sufficient time to document and gain sign off on
    the project charter because it will become the
    project bible
  • Number goals and objectives, so each goal can be
    associated with one or more objectives, and both
    can be related to individual issues, changes,
    risks and requirements.

Importance
Key Tasks
Deliverables
Best Practices
21
Discussion/Questions
22
Review Lessons Learned from Previous Projects
Definition
The term lessons learned is used to refer to
those items which project managers would like to
have known prior to starting the project.
Importance
Key Tasks
Deliverables
Lessons learned are typically gathered during a
meeting where all team members are given the
opportunity to contribute. Items identified
during the meeting are documented.
Best Practices
Once documented, these lessons learned can be
shared with other projects/ agencies to impart
advice or things to avoid.
23
Why is Facilitating Lessons Learned Activities
Important?
Definition
To continue learning and improving IT project
management
Importance
  • Lessons learned can help you improve what you
    just produced in your project and perform better
    on future projects by reviewing your experience
    and learning from it

Key Tasks
Deliverables
Best Practices
To focus on performance standards and quality
  • Gathering lessons learned is a useful process for
    focusing on performance standards and enabling
    participants to discover what happened and why it
    happened

24
Review Lessons Learned from Previous Projects
Definition
  • Identify personnel who will be involved.
  • Identify source of information and select
    appropriate lessons.
  • Discuss the lessons with others in your team.
  • Identify mitigation measures for lessons that
    apply to your project.

Importance
Key Tasks
Deliverables
Best Practices
25
Review Lessons Learned from Previous Projects
Definition
Importance
Key Tasks
Deliverables
Best Practices
26
Review Lessons Learned from Previous Projects
Definition
  • Make the lessons learned session an all inclusive
    activity involving all members of the project.
  • Be specific about how a lesson might apply to
    your project.
  • Be specific about how to mitigate a risk or adopt
    a best practice
  • Include mitigation or adoption measures in other
    appropriate project activities.

Importance
Key Tasks
Deliverables
Best Practices
27
Discussion/Questions
28
Determine Project Scale(Effort and Complexity)
Definition
This activity includes assessing the complexity
and level of effort required for the project in
order to determine which deliverables should be
produced.
Importance
Key Tasks
Deliverables
Best Practices
In order to make sure the appropriate
deliverables are identified, work with executive
leadership when identifying what should be
produced.
29
Why is Determining Project Scale Important?
Definition
Assess which deliverables should be produced
Importance
  • This activity will focus the project team on
    developing a series of deliverables this set of
    deliverables will help define the scope and the
    project work plan.

Key Tasks
Deliverables
Gain agreement on the outcomes of the project
Best Practices
  • This activity will help make sure that everyone
    agrees on what the outcomes of the project will
    be.

Focus time on areas which are known pain points
  • If the agency has experienced problems with a
    particular aspect of an IT project (change
    control, requirements management, etc), that
    should serve as a trigger to have that plan
    developed and executed.

30
Determine Project Scale(Effort and Complexity)
Definition
  • Assess the projects complexity and size using the
    table below
  • Refer to the deliverables matrix to identify
    which deliverables should be implemented for your
    project.

Importance
Key Tasks
Deliverables
Best Practices
31
Determine Project Scale(Effort and Complexity)
  • Measures of complexity
  • Number of organizational units or agencies
  • Number of business processes
  • Number of systems
  • Number of sources of data
  • Number of functions
  • Number of sources of funding
  • Number of elements of architecture
  • Measures of effort
  • Number of hours
  • Number of staff
  • Number of dollars
  • Number of requirements
  • Number of tasks
  • Number of phases

Definition
Importance
Key Tasks
Deliverables
Best Practices
32
View Project Scale Template
Click Here
OA/OIT websitehttp//www.oit.state.pa.us
33
Determine Project Scale(Effort and Complexity)
Definition
Importance
Key Tasks
Deliverables
Best Practices
34
Determine Project Scale(Effort and Complexity)
Definition
  • Consider developing plans which have been pain
    points for your agency
  • Revisit the deliverables matrix frequently to see
    if there are additional deliverables which your
    project will benefit from
  • If so, use the change management plan to consider
    them
  • Update other plans (work plan, issues, change,
    risk, etc.)

Importance
Key Tasks
Deliverables
Best Practices
35
Learning Activity SERTS Example
  • After review of the SERTS Project Charter, use
    the Project Scale Complexity tool to determine
    the level of effort and complexity necessary for
    the project.

36
Discussion/Questions
37
Develop Project Scope
Definition
The project scope states what will and will not
be included as part of the project.
Importance
Key Tasks
Deliverables
  • Scope provides a common understanding
  • of the project for all stakeholders by
  • defining the projects overall boundaries.

Best Practices
Scope can be defined in terms of
impacted organizations, processes, systems,
data, functionality and the like.
38
Why is Determining Project Scope Important?
Definition
Proper scope definition is critical to a
project's success
  • It establishes the boundaries on what the project
    will and will not accomplish. The scope statement
    eliminates any confusion or ambiguity that might
    still exist.

Importance
Key Tasks
Deliverables
Poorly defined scope leads to scope creep
Best Practices
  • Scope creep changes inevitably lead to increased
    work effort, which in turn causes project delays,
    cost overruns, poor team morale and/or customer
    dissatisfaction.

Clearly defined scope will lead to realistic
expectations
  • A clear statement of scope is the foundation for
    defining a change management strategy.

39
Develop Project Scope
  • Document the Scope Statement which can include
  • Project outcome and success criteria
  • Expected services in order to achieve the project
    outcome
  • Functionality and Data
  • Technical Structure
  • Phases (what will be implemented first?)
  • Document the high level requirements of the
    proposed solution.

Definition
Importance
Key Tasks
Deliverables
Best Practices
40
Develop Project Scope
Definition
  • Define the deliverables that were identified in
    the Scaling activity.
  • Copy and past the list of deliverables into the
    Work Plan and build tasks around them.
  • Determine if this project will impact any
    organizational units or any systems.
  • Develop a high level timeline for when major
    phases of the project will occur.

Importance
Key Tasks
Deliverables
Best Practices
41
Develop Project Scope
Definition
Importance
Key Tasks
Deliverables
Best Practices
42
View Project Scope Template
Click Here
OA/OIT websitehttp//www.oit.state.pa.us
43
View Project Scope Example
Click Here
OA/OIT websitehttp//www.oit.state.pa.us
44
Develop Project Scope
  • Make sure the right people are involved in
    defining the project scope.
  • For resource and time issues, consider defining
    the scope for each release or phase of the
    application.
  • Consider having outside entities review the scope
    document in order to have a fresh perspective.

Definition
Importance
Key Tasks
Deliverables
Best Practices
45
Discussion/Questions
46
Conduct Resources Assessment
Definition
The staffing plan defines the required resources
needed to deliver the desired project
deliverables.
Importance
Key Tasks
Deliverables
It involves the selection and assignment of a
complete solution and a complete team.
Best Practices
The staffing plan must provide the appropriate
skill sets to manage the project and to perform
the tasks that produce the specified project
deliverables.
47
Why is Conducting a ResourcesAssessment
Important?
Definition
Reserving needed resources early in the project
Importance
  • Selecting needed resources early on in the
    project will prevent them from being consumed by
    other work.

Key Tasks
Deliverables
Identifying gaps early on in the project
Best Practices
  • After a resource assessment is made, a gap
    analysis can be done to see what resource holes
    need to be filled this may include contracting
    out for services.

Accomplishing the project as efficiently as
possible
  • Management decisions relating to project
    resources and scope are usually are the most
    important factors in ensuring a project's
    success.

48
Conduct Resources Assessment
  • Determine what is in the potentially available
    resource pool.
  • This can be existing staff, potential new staff,
    existing contracted staff, existing
    applications/solutions, hardware and software
    resources.
  • Assess each resource in terms of their skill set,
    years of experience, strengths and development
    needs.
  • Identify any resource gaps
  • This includes identifying where the available
    resource pool will not be able to fulfill certain
    responsibilities of the project

Definition
Importance
Key Tasks
Deliverables
Best Practices
49
Conduct Resources Assessment
  • 4. Develop recommendations to overcome these
    gaps. This includes
  • Leverage resources part time which are currently
    on other assignments
  • Assess the likelihood that additional resources
    can be procured through a vendor
  • Repeat this process for material resources
  • Hardware
  • Software
  • Facilities (e.g. training and meeting rooms,
    cubicles)

Definition
Importance
Key Tasks
Deliverables
Best Practices
50
Conduct Resources Assessment
Definition
Importance
Key Tasks
Deliverables
Best Practices
51
View Resource Assessment Template
Click Here
OA/OIT websitehttp//www.oit.state.pa.us
52
Conduct Resources Assessment
  • Conduct a realistic assessment of the skill set
    and development needs within the available
    resource pool
  • Try to develop an accurate estimate of the number
    of business analysts (program personnel) who will
    be needed to gather requirements, conduct user
    acceptance testing and assist with training and
    implementation
  • If resource availability is an issue, set a
    mechanism to only involve critical resources when
    absolutely necessary

Definition
Importance
Key Tasks
Deliverables
Best Practices
53
Learning Activity Scenario
  • You have gained sign off on the project charter
    and scope documents but have learned that several
    executives in key leadership positions are
    uncomfortable with the information as written and
    think the project will fail. They have not
    formally spoken with you about this but you have
    heard through the rumor mill that this is
    occurring. What do you do?

54
Discussion/Questions
55
Revisit Existing Solutions and Standards
It important for agencies to revisit the due
diligence on existing solutions and standards
they conducted during the Strategy Phase since
time has elapsed between then and the initiation
of the project.
Definition
Importance
Key Tasks
Deliverables
This assessment includes having agencies speak
with OA/OIT and other agencies on what new
options may exist within the Commonwealth to meet
their needs and what new rules may govern their
work.
Best Practices
The focus is on identifying solutions which have
a lower total cost of ownership over the long
term.
56
Why is Revisiting Existing Solutions and
Standards Important?
Definition
To keep up with new developments in IT
Importance
  • Technology changes fast and new solutions may
    exist that may better meet your needs.

Key Tasks
Deliverables
To keep up with new developments in policies
Best Practices
  • Policies change with new leadership and new
    thinking about automating work. Be sure your
    solution still complies with enterprise and
    agency standards.

To keep up with new developments in funding
  • Every new state and federal budget year impacts
    IT spending. Will your project now receive the
    funding you expected?

57
Revisit Existing Solutions and Standards
  • The agency should contact its appropriate federal
    agency and state cohort agencies to see what
    exists in areas like
  • Business functions
  • Solution architecture
  • Performance
  • Reusability
  • Scalability
  • The agency should also contact the agencys CoP
    Planner and CoP Services Coordinator in the OA
    Office for Information Technology to see what new
    solutions and standards exist.
  • Complete the questionnaire template on solutions.

Definition
Importance
Key Tasks
Deliverables
Best Practices
58
Revisit Existing Solutions and Standards
  • Review applicable policies at the enterprise and
    agency levels.
  • Write a report to organize your research and
    present to leadership for review.
  • This includes identifying where the available
    resource pool will not be able to fulfill certain
    responsibilities of the project

Definition
Importance
Key Tasks
Deliverables
Best Practices
59
Revisit Existing Solutions and Standards
Definition
Importance
Key Tasks
Deliverables
Best Practices
Business Process Integration Template
60
View Business Process Integration Template
Click Here
OA/OIT websitehttp//www.oit.state.pa.us
61
Revisit Existing Solutions and Standards
  • Determine if the funding that is being used for
    your project has restrictions on leveraging an
    existing solution or working with another agency
  • Check again at the federal level to see if there
    are existing initiatives focused on the business
    problem you are trying to solve.

Definition
Importance
Key Tasks
Deliverables
Best Practices
62
Revisit Existing Solutions and Standards
  • Revisit the national groups or consortiums of
    states which you can use to identify contacts.
  • Revisit the following websites for more
    information
  • www.govtech.net
  • www.governing.com
  • www.nascio.com

Definition
Importance
Key Tasks
Deliverables
Best Practices
63
Discussion/Questions
64
Develop Procurement Strategy
Definition
A procurement strategy is focused on identifying
a procurement vehicle(s) that best meets project
needs
Importance
Key Tasks
Deliverables
It requires input from the Department of General
Services, the agency which manages all
procurement in the Commonwealth
Best Practices
65
Why is Procurement Strategy Important?
Definition
To make sure that the procurement vehicle is
adequate
Importance
  • Agencies need to define a procurement vehicle
    that can support short term and long term needs

Key Tasks
Deliverables
To make sure all parties agree with the mechanism
to procure
Best Practices
  • Defining a procurement strategy can help bring to
    light issues regarding any procurement
    assumptions made. In this regard, it serves a
    communications vehicle.

To identify whether the mechanism can support
project needs
  • Sometimes supplementary procurement vehicles are
    required to truly fulfill project needs it is
    critical to identify this up front.

66
Develop Procurement Strategy
  • Determine what it is you want to procure.
    Specifically what services (deliverables),
    hardware, software or equipment will be required.
  • Review information on the DGS website
    (www.dgs.state.pa.us) regarding what type of
    procurement will best meet your needs
  • Meet with DGS to discuss procurement options
    available to you and what DGS role will be in the
    procurement

Definition
Importance
Key Tasks
Deliverables
Best Practices
67
Develop Procurement Strategy
  • 4. Sample procurement vehicles include
  • RFP request for proposal
  • RFQ request for quote
  • ITB invitation to bid
  • Sole Source
  • Emergency
  • ASAP software reseller for pre-approved
    software
  • ePlus hardware reseller for pre-approved
    hardware
  • ITQ invitation to qualify for IT and training
    services
  • Staff Augmentation CAI contracted to provide
    consultants
  • When developing the strategy, make sure it will
    meet both short term and long term needs
  • This includes identifying where the available
    resource pool will not be able to fulfill certain
    responsibilities of the project

Definition
Importance
Key Tasks
Deliverables
Best Practices
68
Develop Procurement Strategy
Definition
The deliverable will depend on the procurement
vehicle selected
Importance
Key Tasks
Deliverables
Best Practices
69
Discussion/Questions
70
Develop Document Management Plan
Definition
The purpose of the document management plan is
to manage repositories of project documents and
historical information
Importance
Key Tasks
Deliverables
It helps insure a consistent style and approach
to creation, update and format of documents
Best Practices
71
Why is a Document Management Plan Important?
Definition
To stay organized
Importance
Key Tasks
To provide access to key documents to those who
need it
Deliverables
Best Practices
To insure maintenance staff have system
documentation
To archive files for future research and use
72
Develop Document Management Plan
  • Define the roles and responsibilities related to
    document management.
  • Define the standards for document preparation and
    review.
  • Define the methods for document change control
    and version control.
  • Define the approach to document storage, backup
    and retention.
  • Choose and train team members on any software
    tool.
  • Consider using folders in a shared drive.
  • Consider using a team collaboration web site.

Definition
Importance
Key Tasks
Deliverables
Best Practices
73
Develop Document Management Plan
  • Type of project documents
  • Administrative documentation (licenses,
    warranties, leases, etc.)
  • Analyses and recommendations
  • Contract management documentation
  • Correspondence and communications
  • Email
  • Plans and processes
  • Presentations
  • Reference materials
  • Status reports
  • Working papers

Definition
Importance
Key Tasks
Deliverables
Best Practices
74
Develop Document Management Plan
Definition
Importance
Key Tasks
Deliverables
Best Practices
Document Management Plan Template
75
View Document Management Plan Template
Click Here
OA/OIT websitehttp//www.oit.state.pa.us
76
View Document Management Plan Example
Click Here
OA/OIT websitehttp//www.oit.state.pa.us
77
View Document ManagementTeam Collaboration Site
Click Here
OA/OIT websitehttp//www.oit.state.pa.us
78
Develop Document Management Plan
  • Be sure to receive and track vendor and project
    deliverables.
  • Make project deliverables, like the project
    charter, work schedule and planning documents,
    available to team members and stakeholders.
  • Provide access to files or folders according to
    the needs of individual users or groups of users
    not everyone will need to see everything.
  • Enable team members to store or upload documents
    to your shared drive or web site.

Definition
Importance
Key Tasks
Deliverables
Best Practices
79
Develop Document Management Plan
  • Check with OIT or the Historical and Museum
    Commissions Record Center to learn about
    archiving documents and records retention before
    you get too far into the project.
  • A project web site allows opportunities to for
    team members and stakeholders to collaborate and
    work together better.
  • Adhere to your naming convention and folder
    structure, so you can stay organized and find the
    right documents when you need them.

Definition
Importance
Key Tasks
Deliverables
Best Practices
80
Discussion/Questions