Title: PHAROS PHased Arrays for Reflector Observing Systems


1
PHAROSPHased Arrays for Reflector Observing
Systems
2
Dissemination
  • Successful Faraday testing

3
RECAP PHAROS System Parameters
  • Frequency range 4 - 8 GHz (optimal for 4.0 - 7.0
    GHz)
  • Number of antenna elements 364
  • Number of beams 4, with 13 elements per beam
  • Polarisation single
  • Tsys lt 20 K

4
Cryostat enclosure
5
Antenna array
6
(No Transcript)
7
Beam-former
beam- former
power splitters
LNAs
  • Design in progress
  • Digital control tested at temps lt 70K

8
Cryostat
  • Change to plexi glass Window

9
Control and calibration
10
Advanced technology MMIC run
  • 70nm GaAs mHEMT run executed
  • Performance similar to difficult to access US
    foundries
  • Samples received, testing in progress

11
Summary progress
  • Antenna array To be assembled and tested May
  • MMICs Available
  • Cryostat Ordered, tests finished in June
  • Beamformer prototyping completed, final design
    needed
  • Control and Calibration principle design done,
    hardware protos required

12
Summary progress, constraints
  • UMAN restarted
  • Design, production and test completed in Nov.
    2007
  • Final integration and test Dec. 2007
  • Antenna pattern measurement and calibration
    Jan/Feb 2008
  • Test on Lovell March 2008

13
Summary progress, euros
  • MECSA no budget constraints
  • ASTRON man hour constraint extension contract
    J Simons required, not budgeted 25k
    other management and system design
    extended with 1 year 25k
  • INAF no budget constraints
  • UBIR no budget constraints
  • TCfA no budget constraints
  • UMAN tbd

14
PHAROS testing
  • European and Australian telescopes..
  • 1) Lovell (25m dish for Holography on
    astronomical source) 2) Parks ?

15
High lights
  • Successful performance PHAROS/ASTRON team at 3rd
    International Focal Plane Array workshop Sydney
  • PHAROS only FPA project that aims for low Tsys
  • First demonstrator MIRI lt 100K
  • First demonstrator APERTIF lt 100K

16
Conclusion
  • Good progress most packages
  • Overall delay of one year not budgetary neutral