Title: PHAROS PHased Arrays for Reflector Observing Systems


1
PHAROSPHased Arrays for Reflector Observing
Systems
2
System
Cryostat enclosure
3
System
  • 4 close overlapping beams
  • Focus on 6.7 GHz
  • Instantaneous bandwidth determined by telescope
    back-end (200-500MHz)

4
Antenna array
  • Antenna array evaluated with radome
  • Full S-par data measured

5
Beamformer
  • Cryogenic test of first phase/amplitude control
    modules
  • Control works
  • LNA modules to be assembled

6
Cryostat
7
Advanced technology MMIC run
  • 70nm GaAs OMMIC mHEMT run executed (250GHz fT)
  • Performance similar to difficult to access InP
    US foundries
  • CSIRO 1-50GHz LNAs
  • MECSA 40GHz, 100GHz LNA
  • ASTRON 0.2-2GHz LNA

8
PHAROS testing
  • 1) Lovell (25m dish for Holography on
    astronomical source)

9
Summary progress
  • Antenna array Available, shipped
  • MMICs Available
  • Cryostat Available, ready to be shipped
  • Beamformer Prototyping completed, final
    design completed, production ongoing
  • Control Calibration Principle design done,
    control hardware on prototype o.k., more work
    needed

10
UMAN Beamformer schedule
11
Summary progress, constraints
  • Design, production and test completed in 1st Dec
    2009
  • Final integration and test end Dec 2008
  • Measurement and calibration Feb 2009
  • Test on Lovell April 2009

12
Summary progress, euros
  • MECSA no budget constraints, finished
  • ASTRON difficulty maintaining system evaluation
    work in 2009
  • INAF no budget constraints, (nearly) finished
  • UBIR no budget constraints, finished
  • TCfA Issue to continue after 1st Sept
  • UMAN no budget constraints

13
Faraday evaluation
  • Full analyses report under review

14
APERTIF
  • Based on Faraday / PHAROS knowledge
  • Digital Focal Plane Array on Westerbork

15
Conclusion
  • No engineering roadblock
  • Schedule issues to be discussed