Rehabilitation and Improvement of the Sava River Waterway - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Rehabilitation and Improvement of the Sava River Waterway

Description:

Rehabilitation and Improvement of the Sava River Waterway ... Nautica Vukovar transshipment and storage of liquid cargo, bunkering station ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 22
Provided by: IvaOl
Category:

less

Transcript and Presenter's Notes

Title: Rehabilitation and Improvement of the Sava River Waterway


1
Rehabilitation and Improvement of the Sava River
Waterway
  • Upgrading the Sava basin in to the international
  • navigation class IV
  • Project beneficiaries
  • Ministry of the Sea, Transport and
    Infrastructure
  • Agency for Inland Waterway
  • Shipping companies

2
Croatian inland waterway network
3
Activities
  • Construction of groynes to concentrate the river
    flow, causing higher flow velocities in the
    central part of the river. Higher erosion rates
    will then cause a deepening of the river
  • Construction of bank protections to avoid erosion
    caused by new groynes and to protect eroding
    banks. Due to the water level decrease the Sava
    is carving itself deeper in the landscape, as a
    result steep, vulnerable banks occur,
  • Construction of sills on the bottom of the river
    to increase the water level
  • Rehabilitation of existing groynes and bank
    protections. The majority of the rehabilitation
    works are related to the existing bank protection
    works. The stability of the existing bank
    protections is threatened because of the
    continuous water level decrease.
  • Dredging to increase the water depth.

4
Project status
  • Completed project documentation preliminary
    design, feasibility study, EIA
  • Main design in 2012, funded by EU (IPA TOP
    2007-2009)
  • Estimated start of works in 2013 (application for
    EU funding)
  • Estimated cost of works 50.000.000

5
Port of Vukovar
  • Location
  • Capacity and traffic
  • Development project New Port East

6

Location of Port of Vukovar in wider region
  • The only Croatian inland port on Danube river
  • Guaranteed navigability and accessibility 365
    days a year
  • Connected to road corridor VII. and near road
    corridor V.c

7
Port Authority Vukovar
  • Public institution managing port of Vukovar area
  • Established in 2001.
  • Founder Republic of Croatia

8
Port Authority competence
  • Design of proposals of inland ports development
    plans
  • Implementation of plans
  • Administrative work on issuing concessions for
    port operators
  • Republic of Croatia land property management
    within port area
  • Providing continuous port traffic

9
Present port operators
  • Luka Vukovar transshipment and storage of
    general and bulk cargo
  • Nautica Vukovar transshipment and storage of
    liquid cargo, bunkering station
  • Vupik-rijecni pretovar Vukovar transshipment
    and storage of grain
  • Terminal Dunav - transshipment and storage of
    liquid cargo

10
Development plans
  • Port of Vukovar Master plan finished in 2004.
  • Feasibility study draft finished in 2006.
  • New Port East project IPA programme 2007 - 2009

11
New Port East
  • Bulk Cargo Terminal
  • General Cargo Terminal
  • Multipurpose Terminal
  • Vessel waste disposal station
  • Administrative centre
  • Estimated worth 22 mil. EUR

12
Project goals
  • Accomplishing high quality of port services and
    achieving competitiveness of Vukovar port in the
    international market
  • Providing normal and undisturbed work and
    sustainable development of Vukovar port

13
Project beneficiares
  • Port Authority Vukovar
  • Luka Vukovar d.o.o.
  • Other concessionares in Vukovar port

14
  • New Port East

15
(No Transcript)
16
  • The port of Osijek is situated on the right bank
    of the river Drava at rkm 14
  • The vicinity of the important traffic corridors
    (V.C. corridor in north-south direction and X.
    corridor in east-west direction), makes the Port
    of Osijek the place where the contact of all
    traffic types is possible, making them a complete
    functional traffic unity in the system of
    intermodal transportation
  • The port area (land and water part) stretches on
    the surface of 150 hectares

17
Projects
  • Construction of Bulk cargo terminal
  • Construction of South quay

18
  • Construction of Bulk cargo terminal will include
  • construction of dock for transhipment of bulk
    cargo in length of 260m
  • transhipment facility consisting of underground
    storage area with operational volume of 60 m³,
    underground belt conveyer and coastal belt
    conveyer
  • installation of portal crane
  • crane rails in length of 100m
  • extension of transhipment rail road in length of
    500m
  • necessary infrastructure required for operation
    of terminal (water supply, storm water drainage,
    sewage and wastewater treatment, electricity
    supply, lighting, etc )
  • towboat (370kW power engine and 30m length ) for
    needs of manoeuvring within port basin and
    bringing in and out of cargo ships and barges
  • Final long term target is enabling acceptance and
    storage of bulk cargo and increasing reloading
    capacity up to 2,5 mil tons per year.
  • The total value of the project is 19.000.000 EUR.

19
  • Construction of South quay will include
  • - 100m construction new verticale quay wall
    downstream from existing wall
  • - 230m reconstruction existing inclined in
    half-inclined quay wall to connection with bulk
    cargo terminal
  • - 500m construction new quay wall upstream from
    existing wall
  • - 100m reconstruction existing vertical quay wall

20
Planned features in Port area of Osijek
21
Hartelijk dank voor uw aandacht !
Thank you very much for your attention !
Hvala na pozornosti !
Write a Comment
User Comments (0)
About PowerShow.com