Georgia Statewide Student Information System Project Update

Description:

'Design Data Model, GTID & ETL' Mon 11/1/04. Thu 7/15/04. 76d ... Architectural Design Document. IV&V vendor selection. North Highland ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 17
Provided by: allan61
Category:

less

Transcript and Presenter's Notes

Title: Georgia Statewide Student Information System Project Update


1
Georgia Statewide Student Information System
Project Update
  • Dave Sanek
  • Technical Project Manager

2
High Level Project Schedule
3
Current Project Activity
  • Completed initial 30 day assessment
  • Requirement Validation Document
  • Detailed project plan
  • Architectural Design Document
  • IVV vendor selection
  • North Highland
  • Continued data analysis and mapping discussions
    with eScholar
  • Continued to clarify/confirm GTID requirements
  • eScholar presented a demo of the product
  • Order hardware for the dev and test environments
  • Expected delivery October 15
  • IVV Kickoff meeting

4
Change Orders
  • Change Order 001
  • GDOE requested that BearingPoint replace the
    proposed GTID solution with the eScholar Uniq-ID
    product.
  • Change Order 002
  • GDOE requested that BearingPoint acquire COGNOS
    software by August 31, 2004 in order to take
    advantage of COGNOS offer to provide additional
    software licenses and product

5
Issues Risks
  • The project, per se, has no listed issues at this
    time
  • There are environmental concerns that could
    adversely impact the project
  • Changing of current SIS products in the districts
  • Identification and timely resolution of policy
    issues
  • Failure to resolve policy issues could impact
    delivery date and cost
  • Possible Legislative changes

6
Data
  • Currently working with eScholar to map data
    elements to the Templates
  • 61 templates
  • Comparing eScholar, data collection, NCES, PBDMI
    and Data Sub-Committee data recommendations
  • Some data elements are mandatory for eScholar
    data warehouse data integrity
  • On-going changes in the data-need landscape will
    dictate data inclusions that historically have
    not been included in the data collection process,
    for example
  • Office of Civil Rights needs
  • Special Ed

7
Sample Template
8
Sample Template Load Sequence
  • District
  • Period
  • Location
  • Enrollment Codes
  • Student
  • Student Enrollment

9
Planned Activities
  • Final eScholar mapping
  • GTID match data finalization
  • Stand up and install of Dev and Test environment
    hardware
  • Detailed architecture plan
  • ETL meeting with Dr. Woodard, TPM
  • Establish Rational environment
  • Preliminary logical model walk through

10
Things to remember
  • This project is not about creating a reporting
    repository
  • The proposed solution is a decision support
    system
  • Will stimulate thought and questions
  • Will permit its users to answer What if. . .
    scenarios
  • Will create an overall picture of the States
    educational environment using data in a way never
    before accomplished
  • Will continually change

11
ARM Payments
12
ARM Payment Status
  • Total Grant Amount 28,923,921.00
  • Paid to Date 27,290,177.70
  • Remaining Balance 1,633,743.30

13
(No Transcript)
14
Interagency Data Integration
  • Georgia Student Finance Commission
  • Board of Regents
  • Department of Adult and Technical Education
  • Department of Motor Vehicle
  • Department of Human Resources

15
Policy
  • Enrollment Rule

16
Next Meeting
  • Tuesday, October 26, 2004
  • Classic Center, Athens, Georgia
  • 900 AM
  • Tentative Agenda
  • Georgia Student Finance Commission Web
    Application Demonstration
  • Project Update