Title: William Browder


1
WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS
Railway Perspective
  • William Browder
  • Director of Operations,
  • Association of American Railroads

2
OVERVIEW
Weather Information Needs / Requirements Results
  • PRECIPITATION
  • TEMPERATURES
  • VISIBILITY
  • WINDS

3
WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS
Precipitation
  • Frozen Precipitation - General
  • Condition Action Lead-time
  • Frozen Precipitation Maintain safe Operator's
    transportation. Discretion
  • Freezing Rain/Icing Clear tracks and 2-hrs
    power rails/wires.
  • Inclement weather Rail schedules 1-2
    hrs leading to early altered. Add release
    of commuters passenger cars.
  • Snowfall/Drifting snow Mobilize staff. 24 hrs
    (optimum) Icing/Freezing Rain Stage
    equipment. 8-hrs (minimum)
  • Accumulation and lead-time affect the decision
    process

4
WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS
Precipitation
  • Frozen Precipitation - Specific
  • Condition (Preparation) Action Lead-time
  • Snowfall 0-2" Mobilize staff. Stage 24-hrs
    equipment. 8-hrs min.
  • Snowfall 2-6" Initiate appropriate
    action 12-hrs plan.
  • Snowfall 6-8" Initiate appropriate
    action 12-hrs plan.
  • Snowfall gt 8" Initiate appropriate
    action 12-hrs plan.
  • Accumulation and lead-time affect the decision
    process

5
WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS
Precipitation
  • Frozen Precipitation - Specific
  • Condition (Execution) Action Lead-time
  • Snowfall 0-2" Mobilize staff. Stage 24-hrs
    equipment. Maintain Ops. 8-hrs min.
  • Snowfall 2-6" Maintain Ops. Rail Real-time.
    restrictions optional.
  • Snowfall 6-8" Maintain Ops. Service Real-time.
    delayed or altered.
  • Snowfall gt 8" Reduced operations.
    Real-time. Suspend operations.
  • Accumulation and lead-time affect the decision
    process

6
WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS
Precipitation
  • Liquid Precipitation - General
  • Condition Action Lead-time
  • Heavy precipitation Speed reductions.
    Operator's Discretion
  • Heavy precipitation Maintenance checks
    for Operator's roadbed washout. Discretion
  • Flooding Protect trains. Warn
    Minimal engineers. Adjust schedules,
    re-route traffic, or cancel routes as
    necessary.

7
WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS
Precipitation
  • Liquid Precipitation - Specific
  • Condition Action Lead-time
  • Flooding Alter or delay rail schedule, 1-hr
    as necessary. Check pumps in flood
    prone areas.
  • Flooding Inspect bridges, trestles,
    1-hr tunnels, and other structures for
    operational integrity.

8
WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS
Thunderstorms / Lightning
  • General
  • Condition Action Lead-time
  • Severe Thunderstorm Delay routes, adjust
    Operator's schedules as necessary. Discretio
    n
  • Lightning Cease refueling operations. Operator's
    Cease switching operations. Discretion Curt
    ail rail car inspections.

9
WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS
Temperatures
  • Air Temperature
  • Condition Action Lead-time
  • lt 32 deg F Monitor personnel and
    6-12hrs equipment stress, crew comfort
    and safety.
  • gt 85 deg F Catenary problems Operators
    in older railway Discretion installations-
    -reduce speed.
  • gt 85 deg F Monitor personnel and
    6-12hrs equipment stress, crew comfort
    and safety.
  • gt 90 deg F Track inspections. Slow
    or Real-time suspend operations.

10
WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS
Temperatures
  • Railway Temperature
  • Condition Action Lead-time
  • lt 32 deg F Track inspections.
    Slow Real-time or suspend operations.
  • 32 - 85 deg F No maintenance action. N/A
  • gt 85 deg F Monitor personnel and
    Real-time equipment.
  • gt 90 deg F Track Inspections. Slow
    or Real-time suspend operations.
  • Extreme temperature gradients over time is
    critical to rail expansion and contraction.

11
WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS
Visibility
  • Type of obscuration to vision (fog, smoke, haze,
    glare) is not important.
  • Condition Action Lead-time
  • lt3 mile Rail speed reductions. Operator's (d
    epends on speed and Discretion length of
    train).

12
WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS
Winds
  • General
  • Condition Action Lead-time
  • Blown debris Clear routes. Delay
    Operator's operations. Discretion
  • 60-65 mph, crosswinds Rail service delays,
    as Operator's necessary. Suspend Discretion
    operations, as necessary.
  • Sustained strong wind is more of a factor than
    gusts.