Description:

first sidetrack with RSS: section 7260 to 10050, 2790 ft, 95,5 hrs at 29.2 ft /hr ... Section was sidetracked with another RSS and got stuck and had to side track ... – PowerPoint PPT presentation

Number of Views:63
Avg rating:3.0/5.0
Slides: 37
Provided by: Luxsat
Category:

less

Transcript and Presenter's Notes

Title: The Wildcat ADS Presentation August 1, 2005


1
The Wildcat ADSPresentationAugust 1, 2005
2
The Wildcat ADS
  • The only multi-parameter Automatic Drilling
    System
  • with Delta-P function

3
Uncertainty Removed!
  • Drilling performance requires consistent and
    precise delivery of WOB to drill efficiently and
    economically
  • Drilling engineers spend hours designing well
    plans hardware for optimum performance.
    However, controlling the brakes the means of
    delivering the WOB - does not get enough
    attention. It is in the hands of the human
    driller and DD. Uncertainty prevails!
  • With the Wildcat ADS you will replace
    uncertainty with the assurance that your
    parameters are being accurately delivered, hour
    after hour, including shift changes!

4
Our Mission
  • To provide a
  • precision surface technology
  • that would execute
  • Programmed Drilling Parameters
  • Accurately Consistently

5
What distinguishes The Wildcat?
  • Precise WOB transfer is done using Pump
    Differential Pressure, and/or Weight only, in
    addition to ROP Limiter, i.e.,
  • A multi-parameter System

6
The Patent!
  • The Wildcat ADS system is the only patented
    multi-parameter
  • method of actuating the rig braking system

7
Functionality
  • From surface to T.D, the Wildcat ADS can perform
    almost any function
  • required by the driller, Using three controllers
    individually or in any combination
  • WOB, Delta-P, ROP

8
WOB Controller
  • Straight Hole Rotary Drilling
  • RSS
  • Rock bit and PDC Bit Applications
  • precision feed / WOB sensitivity is
    customized to Bit Type, BHA and rig equipment

9
Delta-P Controller(pump differential Pressure)
  • Downhole Motors and turbines
  • Straight hole Drlg
  • Directional Drlg
  • Horizontal Drlg
  • Identifying Geologic Marker

10
ROPController
  • Reaming consistent, safe, faster reaming rate
  • Controlled Drilling useful for maintenance of mud
    Rheology, etc.
  • Hole Opening
  • Coring
  • Drilling on cement float equipment

11
Other Applications
  • Logging with LWD/MWD using ROP Controller
  • Milling liners etc. using ROP Controller
    precise WOB capability

12
The ADS System Description
13
The Control Panel
14
The Wildcat is Simple!
  • Simple to Install in one hour
  • Simple to Learn in few hours
  • Simple to Maintain in minutes
  • Simple to Operate go manual instantly
  • Simple to Un-install in minutes

15
Case Histories from ADMA
16
Case Histories from ADMA
17
Case Histories from ADMA
Weatherford Milling Operator noted "The
Automated Drilling System provided a steady
transmission of weight to the mills in a
precision manner, thus contributing greatly to
the success of the milling operation. The
historical ROP record (19.5 ft/hr) achieved in
milling this 7"liner was unprecedented".
18
Case Histories from APACHE-EGYPT
  • TEST DRILLING REPORT
  • DATE 24 July 2005
  • RIG EDC 50
  • WELL EB 37
  • It was agreed to make test drilling by using
    Wildcat Automated Drilling System in comparison
    to manual drilling, joint by joint of drill pipe.
    A total of three joints with WADS and three
    joints manually, with same drilling parameters.
  • Test started at depth 4504 feet and completed at
    depth 4690 feet in a formation of Shale with
    SILTSTONE.
  • TOTAL FEET DRILLED
    MANUALLY 93 feet
  • WITH ADS - 93 feet
  • TOTAL TIME SPENT TO DRILL MANUALLY 2.40
    hrs
  • WITH ADS 1.68 hrs
  • AVERAGE R.O.P. BY DRILLING MANUALLY 38.75
    ft/hr
  • WITH ADS 55.36 ft/hr
  • INCREASING IN R.O.P. OBSERVED 55. 36 38.75
    1.43 43
  • FOR DETAILS SEE ATTACHMENT ( TABLE ) on the next
    slide.

19
Case Histories from APACHE-EGYPT
20
Case HistoryKHALDA Oil Company - EGYPT Rig
EDC-51 Date 10-August-2005 Well CASR-17
Witnessed By Company Man (Khalda)
Mr. Ibrahim A. El Hakim Wildcat EOC Services
Manager Mr. Yuriy P. Korobnichenko
21
Case HistoryKHALDA Oil Company - EGYPT Rig
EDC-8 Date 12-August-2005 Well Ozoric-5
Witnessed By Company Man (Khalda)
Mr. Mahmoud El Sayed Wildcat EOC Services
Manager Mr. Yuriy P. Korobnichenko
22
Case HistoryKHALDA Oil Company - EGYPT Rig
EDC-42 Date 02,06-August-2005 Well D-2C
23
Case Histories from APACHE-EGYPT
24
Case Histories from ADCO
25
ChevronTexacoRecommendation
  • The use of an automatic driller (with Delta-P)
    in applications that require holding constant WOB
    or differential pressure is highly recommended.
    Extended bit and drilling equipment life has been
    realized when this tool is in place.

26
Case Histories from ARAMCO
27
Case Histories from ARAMCO
28
Case Histories from ARAMCO
29
Case Histories from ARAMCO
30
Case Histories from OXY Oman
31
Case Histories from Noble, Qatar
  • When the drilling contractors get contract
    drilling jobs, and are paid on a turn key, they
    call us for a Wildcat!
  • Noble, who had their own ADS system, has ordered
    the Wildcat for barge Jimmy Pucket - Qatar - for
    a full year and then requested another Wildcat
    for a new contract!
  • All QP Contractors on turnkey jobs have called us
    for the same Santa Fe, Diamond Drilling and
    Noble..

32
1. If you want to
  • Evaluate Directional drilling results more
    reliably
  • Improve ROP - sometimes substantially
  • Evaluate bits, extend bit life, and reduce bit
    trips
  • Extend Mud Motor life and reduce stalling
  • Reduce Torque and Drag

33
2. If you want to
  • Obtain gauged holes and faster trips
  • Run casing with more certainty
  • Trust drilling parameters reported on the DDR
  • You will need
  • the Wildcat on your rig!

34
The Wildcat enables Operators and Contractors to
work together on a common ObjectivetoDrill the
LimitBeat the Curve
35
Service Package
  • The Wildcat ADS comes with a full service package
    and a guarantee of satisfaction
  • Workshop Operators
  • Based in Abu Dhabi

36
Finally!
  • Please think of the Wildcat as your watchful eye
    downhole, ensuring that your parameters are
    diligently delivered as programmed.
  • 700 Wildcats are serving now most major oil
    companies. Hope to be also in service on all your
    rigs.
  • Always at Your Service!
Write a Comment