Title: Sauda Hydro Power Project


1
Sauda Hydro Power Project
2
Reinsvatnet
Slettedalselva
Istjønna
Holmavatnet
Dalvatnet
Lingvang/Tengesdal
Storlivatnet
Maldal/Tengesdal
Sauda III
Sønnå
3
Tunnelsystem Sønnå
Dalvatnet
Skarvåna
Liabekken
Raundalen
Sønnåhamn
Raundalsbekken
Breidkvamselva
Kr. stasj.
Sagelva
Maldal
Risvatnet
Lingvang (Grunnavatnet)
4
Access Sønnå HPP
5
Headrace tunnel Maldal/Sagelva
6
Head race Lingvang/Tengesdal
7
Sønnå Kraftstasjon
8
Tailrace Sønnå HPP
9
Dalvatn tunnelsystem
10
Dalvatn HPP layout
11
Construction schedule
  • Length of construction period from notice to
    commence to water on unit 1 Sønnå H is estimated
    to be 2 years and 9 months. Succeeding this is a
    period with testing the installation, gates etc..
    Unit 2 follows approx. 1 month later.
  • Sønnå L will be finished approx 1 month after
    Sønnå H unit 2.
  • Dalvatn power station is planned to be on line
    before Sønnå H and L comes on line.
  • The various transfere / headrace tunnels are
    planned to be finished as early as possible
    taking into consideration the limitation on
    transport etc.