2005 Plan: Winter Pilot Study - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

2005 Plan: Winter Pilot Study

Description:

Report will be incorporated into the 2005 Annual Monitoring Results ... 55,000. Sacramento River BG20. w. Dumbarton Bridge BA30. Yerba Buena Island BC10. w. w ... – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 2
Provided by: sfei
Category:
Tags: buena | pilot | plan | study | winter

less

Transcript and Presenter's Notes

Title: 2005 Plan: Winter Pilot Study


1
2005 Plan Winter Pilot Study
  • Study reduced to water sampling at 3 historical
    RMP sites used by the Water Board for NPDES
    permitting.
  • Sampling to occur in February
  • Full Suite of RMP water parameters to be measured
  • Report will be incorporated into the 2005 Annual
    Monitoring Results
  • Data will be made available on the website after
    final QA/QC
  • Sub-contract cost est. 55,000

Sacramento River BG20
w
Yerba Buena Island BC10
w
Dumbarton Bridge BA30
w
Write a Comment
User Comments (0)
About PowerShow.com