Title: 19.1.2006, GSI DarmstadtMartin Winkler, GSI
1DIRACsecondary Beams
Annual report on Large-area beam tracking
detectors for fast extracted beams Task 8
NUSTAR 3
Participants Comenius University, Bratislava
(leading) GSI, Darmstadt Task leader
Brano Sitar (CUB)
2Main activities and results of NUSTAR 3 in 2005
-
- Design, production and testing of a low
pressure gas system - Design and production of a prototyp of a
proportional beam - chamber BC with delay line
- Design and production of new electronics for
the BC chambers
- In time with Implementation plan of Task 8 -
NUSTAR 3
3Low pressure gas system
- Gas system was built and tested (at the FRS)
- Tests showed high precision and reliability
Front panel of the control system
Scheme of low pressure gas system
4New generation of a Time Proportional Chamber
(TPC) for ion tracking
- TPC with new designed C-pad read out was designed
- New TPC is providing two point on the track in
each dimension - High precision integrated delay lines were used
TPC Field cage with 12 x 24 cm sensitive area
Calibration tool for TPC
TPC View
5BC for Beam Pofile Measurement
- Multiwire Proportional (Ionization) Chamber
- Low pressure 0 1 bar
- Low amount of material
- in the beam area
- Delay line read-out
Beam chamber on the test stand
6New integrated electronics for TPC and BC chambers
- New integrated electronics was designed and
produced - New electronics for readout of 128 channels of BC
chambers was obtained
Integrated electronic module
Readout for 128 channels of the BC chambers
Test bench for delay lines
7Work Plan and Financial Status
- Personal spent CUB 20 MM out of 90 MM
(no EU request) - GSI 4
MM out of 6 MM (no EU request) - Capital investment CUB 10 k out of 66 k
- GSI no contribution, no EU request
- 1 coordination meeting
- In time with Implementation plan of Task 8 -
NUSTAR 3
- Delivery and Test Experiment with BC prototype
in 2006 foreseen