GLD Calorimetry - PowerPoint PPT Presentation

About This Presentation
Title:

GLD Calorimetry

Description:

Being designed by M. Tanaka at KEK. Mon power in Japan. Japanese staffs. KEK (J. ... T. Takeshita for M. Tanaka: Electronics for scintillator-based calorimeter ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 17
Provided by: kawagoek
Category:

less

Transcript and Presenter's Notes

Title: GLD Calorimetry


1
GLD Calorimetry
  • 2005/Mar/03
  • K. Kawagoe / Kobe-U

2
Introduction
  • Current design
  • To be optimized for Particle Flow Algorithm (PFA)
    aiming at 30/sqrt(E) resolution for jets
  • ECAL W/Scinti with SiPM analog readout
  • HCAL Pb(Fe)/Scinti with SiPM (semi-) digital
    readout
  • Other options ?
  • SiW ?? (no manpower)

3
The GLD model under consideration
GLD (world-wide)
GLC design (ACFA)
m
m
SC-coil
SC-coil
HCAL (Pb(Fe)/scinti or digital)
Pb/scinti HCAL
W/Scinti ECAL
Pb/Scinti ECAL
TPC (Jet chamber as option)
Jet chamber
Si intermedi.-Trk
Si intermedi.-Trk
SiVTX pixel (cold version)
SiVTX pixel
4
Comparison of size of EM CAL surface
GLD
  • Area of EM CAL (Barrel Endcap)
  • SiD 40 m2 / layer
  • TESLA 80 m2 / layer
  • GLD 100 m2 / layer
  • (GLC 130 m2 /layer)

2.1m
5
Layout of scintillator layers
  • We have an experience of
  • Strip-array ECAL (20cm x 1cm)
  • Small tile ECAL (4cm x 4cm)
  • Ghost clusters from strip-array layers would be
    easily removed with additional small-tile layers
    (effective cell size 1cm x 1cm).
  • This idea SHOULD be well confirmed by full
    simulation studies.
  • If NOT, we would need ECAL with smaller tiles
    (2cm x 2cm or less ?)
  • Strip Tile CAL can be achieved with SiPM
    readout (directly attached to WLS fibers) .

6
Common layout for ECAL and HCAL
7
Number of readout channels
  • With 20cm x 1cm strips and 4cm x 4cm tiles
  • ECAL prototype
  • 650 analog readout channels
  • Calorimetry for the real detector
  • ECAL 2.0M analog readout channels.
  • HCAL 5.5M (semi-)digital readout channels
  • A big challenge !!
  • Number of channels could easily change the order
    depending on the strip/tile size.

8
RD issues
  • Design optimization (scintillator shape and size)
  • to remove ghost clusters
  • to match tracks and clusters
  • for particle flow algorithm
  • Photo-sensors (SiPM)
  • Readout electronics
  • Gain monitoring system
  • Mechanical structure

9
Possible schedule (as of Sep. 2004, very very
preliminary)
  • 2004-2005
  • Design optimization
  • RD of SiPM (DPPD)
  • RD of readout electronics
  • 2005-2006
  • Construction of an ECAL test module
  • Tests with cosmic-rays
  • 2006-2008
  • Test beam studies of the ECAL test module
    standalone
  • Test beam studies in combination with CALICE HCAL

10
Simulation studies
  • Jupiter simulation
  • Weekly acfa-sim-j TV meeting
  • CAL and MUD structures are implemented.
  • Ready for physics studies ?
  • Study of particle flow algorithm (S. Yamamoto)
  • G4 Simulation with simple structure
  • Energy resolution by M.C. Chuan (Tohoku)
  • Strip-array ECAL (Tsukuba)
  • DigiCAL simulation (Shinshu)
  • Clustering/particle flow algorithm (Kobe)

11
Hardware studies
  • Scintillator strips/tiles
  • Being studied in Niigata
  • SiPM
  • Being developed in Hamamatsu
  • Being tested in Niigata and Kobe
  • Readout electronics
  • Being designed by M. Tanaka at KEK

12
Mon power in Japan
  • Japanese staffs
  • KEK (J. Kanzaki)
  • Kobe U. (K. Kawagoe)
  • Konan U. (F. Kajino)
  • Niigata U. (H. Miyata)
  • Shinshu U. (T. Takeshita)
  • Tsukuba U. (S. Kim, H. Matsunaga)
  • No core staffs at KEK
  • Problem in keeping activity
  • Problem in getting budget from KEK

13
Budget crisis in FY2005
  • No money for CAL RD via KEK ILC group
  • Because we have no core staffs at KEK
  • Japan-US program failed for CAL RD
  • (Partly) because we have no core staffs at KEK
  • We currently have
  • Kakenhi (Takeshita, 20042005)
  • KEK Collaborative development research
    (Takeshita, 20042005)
  • Japan-Germany joint project (CALTPC, travel
    money, 20052006)
  • We are applying / going to apply
  • Several Kakenhi proposals
  • Japan-Russia joint project (with JINR)
  • Japan-Korea joint project ??

14
International collaborations
  • Korea
  • Kyungpook National U. (K. Cho, D.H. Kim, Y.D. Oh,
    J.S. Suh)
  • Seoul National U. (S. Kim )
  • SungKunKwan U. (I. Yu)
  • Monthly Japan-Korea TV meeting (2005 Feb )
  • Japan-Korea CAL meeting in Daegu (2005 July)
  • They are going to make their own EM prototype
  • W-plates, Scintillator, SiPM, electronics
  • CAL simulation with Mokka
  • Russia
  • JINR (P. Evtukhovitch, et al.)
  • Peter will visit Japan for 2 months in 2005.
  • ISTC3000 failed. Planning to apply a new proposal
    to ISTC.
  • Applying to the new Japan-Russia joint project
    (JSPS)
  • Good relation with CALICE
  • Communication with Analog HCAL group at DESY
  • Tsukuba DC for SiW ECAL beamtest at DESY (2005
    Feb , a half year)
  • Japan-Germany joint project approved (20052006,
    CAL TPC)
  • Japan-France joint project ?

15
CAL-related talks at LCWS05
  • From Japan
  • H. Miyata RD of calorimeter using striplet/cube
    scintillators with SiPM
  • T. Takeshita Progress of photosensors for
    scintillator
  • H. Matsunaga Simulation study of
    scintillator-based calorimeter
  • N. Nakajima Correlation matrix method for
    Pb/Scinti sampling calorimeter
  • T. Takeshita for M. Tanaka Electronics for
    scintillator-based calorimeter (title to be
    confirmed)
  • From Korea
  • D.H. Kim The status of the scintillator-based
    calorimetry RD activities in Korea
  • S. Nam CERN beam test of Silicon-Tungsten
    calorimeter test module

16
Summary
  • Our default calorimeter design
  • ECAL WScintiSiPM, analog readout
  • HCAL Pb(Fe)ScintiSiPM, (semi-)digital readout
  • RD issues
  • Design optimization
  • Scinti./SiPM
  • Readout electronics
  • Gain monitoring
  • Mechanical structure
  • Schedule
  • Test beam for ECAL prototype in 2006 ?
  • International collaborations growing
  • Lack of
  • Core staffs at KEK
  • Budget for prototype/test beam
Write a Comment
User Comments (0)
About PowerShow.com