Watershed Delineation - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Watershed Delineation

Description:

Let's use Spatial Analyst | Raster Calculator ... AREA: SUM. GRASSACRE: SUM. Name of new shape: Caney_huc_10.shp (underline, instead of hyphen) ... – PowerPoint PPT presentation

Number of Views:80
Avg rating:3.0/5.0
Slides: 16
Provided by: pete7
Category:

less

Transcript and Presenter's Notes

Title: Watershed Delineation


1
Watershed Delineation
  • 9-12-07

2
Caney Fork Watershed
  • 05130108 HUC8 Cat Number
  • Copy folder from classfiles\GEOG4650-Li\Data\caney
    -dem to your own folder. You will start working
    on the layer from your own folder. Be careful
    when you copy folder from one place to another.
    DO NOT MOVE, use COPY.
  • Start a new ArcMap project or use the existing
    project and add a new Dataframe to the TOC.
  • While adding 05130108 to your project, you will
    be asked to perform Create pyramid for
    05130108, simply click Yes then, sit and
    wait..Z Z Z Z Z Z Z Z Z

3
05130108
  • Is the layer projected?
  • If not, what is the datum used for the layer?
    (from Properties / Sources)
  • How to project DEM from DD to ?
  • Lets look at the elevation data we found that
    the elevation ranges from 13522 to 67699.
  • It seems to be a ????? Unit
  • From Properties / Sources.. We found that the
    Pixel Type is unsigned integer
  • So, you need to change it back to ?????
  • Lets use Spatial Analyst Raster Calculator
  • And you may get a Calculation, right-click on
    the Calculation Data Make Permanent

4
Project DEM
  • ArcToolBox
  • Data Management Tools
  • Projections and Transformations
  • Raster
  • Project Raster (Remember to create a new folder
    to hold the projected DEM)

Create a new dataframe and move the projected DEM
to the new dataframe
5
Nonprojected vs Projected
  • Nonprojected vs projected

6
Watershed Delineation
  • Use ArcToolBox
  • Spatial Analyst Tools
  • Hydrology
  • Fill (Why?) and this process will take forever
    to complete (at least on my computer), then
  • Flow Direction and Flow Accumulation

7
Flow Accumulation
8
Caney-HUC-12
  • Add Caney-HUC-12.shp to the current dataframe.
    (make sure the fill pattern is set at transparent
    so your flow accumulation layer can be seen under
    HUC layer).
  • We will dissolve features (HUC-12) into HUC-10
    based on criteria from the table.
  • Lets open up the attribute table and decide what
    attributes to be remained on the new attribute
    table.

9
Dissolve Features
  • ArcToolBox
  • Data Management Tools
  • Generalization
  • Dissolve
  • Keep these
  • Area
  • Name 10
  • Grassacre
  • HUC_10
  • HUC_8
  • HUC_6
  • HUC_4
  • HUC_2
  • Statistics Fields
  • AREA SUM
  • GRASSACRE SUM
  • Name of new shape
  • Caney_huc_10.shp
  • (underline, instead of hyphen)

10
HUC-10
  • There are 9 HUC-10 watersheds in the Caney.

11
Create Pour Points
  • PourPoint.shp (UTM1983)
  • Find 9 points at the outlets of each HUC-10
    watersheds and create them.
  • Use spatial join to join attributes from
    Caney_huc_10.shp to PourPoint.shp

12
Spatial Join Table formed
  • Tables attribute joined from other layer based
    on spatial relationship.

13
Spatial Analysis Tool
  • Hydrology Watershed

Problem ????? DEM or Fill Sink process is not
detailed enough..
14
Create 3D Model
  • Start ArcScene from ArcGIS
  • Add Caney-dem-de to the project
  • Set Base Height from the layers properties.
  • You may have to exaggerate 20 times for your Z
    scale.

15
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com