DØ International Finance CommitteeScrutiny Panel
  • John Womersley
  • Fermi National Accelerator Laboratory, Batavia,
    Illinois
  • 3 April 2003

2
Scrutiny Panel
  • Is in place
  • Peter Ratoff (UK)
  • Jean Karyotakis (France)
  • Klaus Ehret (Germany)
  • John Cooper (FNAL-PPD)
  • Steve Wolbers (FNAL-CD)
  • John Womersley (DØ)
  • Discussions by e-mail
  • Telephone meetings on January 7 and February 4

3
January 7 meeting
  • Cost of maintenance of the central (d0mino) SGI
    machine
  • All agree the cost is high CD are pushing DØ to
    migrate away from this machine in order to reduce
    maintenance costs. Scrutiny panel would like to
    see such a plan if the common fund is expected to
    contribute to the maintenance costs in the short
    term.
  •  Why do tape costs double between FY02 and FY03?
  • This was a conservative estimate. Steve Wolbers
    presented a new estimate of 250-300k taking
    account of new tape technology
  • Consider excluding computing professionals who
    cover desktop support for PPD physicists
  • Agreed that such support should be excluded from
    the common fund.
  • Consider excluding certain detector support tasks
    if they are Fermilab institutional commitments to
    certain subsystems. PPD electrical and
    mechanical support costs seem high
  • The scrutiny panel believes that the common fund
    should cover costs associated with the
    experimental hall, infrastructure, cryogens,
    and magnets. It should not cover the costs of
    maintaining Fermilab-built detector subsystems.
    We will need a breakdown of electrical and
    mechanical technician costs along these lines.
  • Similarly, consider online computing in PPD as an
    institutional commitment?
  • The scrutiny panel felt that online and slow
    controls were a legitimate component of the
    common fund (example of BaBar).

Note some members of the panel felt this is
too restrictive an interpretation
4
February 4 meeting
  • Continued discussion of Fermilab technician
    manpower, after receiving breakdown of tasks
    performed.
  • The scrutiny panel agrees that all these
    activities are needed for the   operation of the
    experiment.
  • But, if we were to follow the example of BaBar
  • we would not include any of the Fermilab-staff
    electrical or mechanical technicians in the OCF
  • we would include all the online support staff
  • the IFC should be the body that decides if D0
    wants to follow (in such detail) the example of
    BaBar

5
If we do proceed this way
6
Common Fund per physicist
If we do proceed this way
  • Need an updated census of DØ collaborators, but
  • 674 on masthead
  • 167 students (not all on masthead)
  • Approximately 550 Ph.D. collaborators
  • 3M per year 5,450 per Ph.D. per year
  • I have been telling people to use 5000 as an
    approximate number in talking to their agencies