Simon Fraser University Facilities Management - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Simon Fraser University Facilities Management

Description:

All Asbestos NOPA's are to be copied to SFU OH&S Department fax # 604 291 5678 ... Asbestos. Biological. Radiation. Magnetic fields. Stack emissions. Confined ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 19
Provided by: leefle
Category:

less

Transcript and Presenter's Notes

Title: Simon Fraser University Facilities Management


1
Simon Fraser UniversityFacilities Management
  • Contractor Site Safety Orientation

2
SFU Safety Policy
  • The safety of all members of the university
    community as well as visitors to campus is a
    major concern of the university. It is therefore,
    the policy of the university to
  • Protect the safety of all faculty, staff,
    students visitors (contractors sub
    contractors) against unsafe conditions and
    occupational hazards
  • Formulate and carry out continuing effective
    safety programs appropriate to university
    operations
  • Give priority to a safe work environment in the
    planning, direction and implementation of
    university activities and
  • Comply with relevant statutes, regulations and
    standards of regulatory authorities representing
    occupational health and safety.

3
Contractor Categories
  • Prime Contractor
  • Continuing Service Contractor
  • Project Contractor

4
Prime Contractors
  • Fully enclosed site
  • Contractually site owners
  • Safety within the site is their responsibility
  • Perimeter must be maintained
  • Interface with university services must be
    coordinated with SFU

5
Continuing Service Contractors
  • Work and work risks remain the same
  • Yearly Orientation required
  • SFU Safety policy updates distributed as required
  • SFU delegates the safety responsibility but
    accountability remains with SFU
  • SFU Safety advisors will monitor work
    periodically

6
Project Contractors
  • Project orientation for each project
  • Responsible for sub contractors under their
    direction
  • Yearly orientation required
  • SFU Safety policy updates distributed as required
  • SFU delegates the safety responsibility but
    accountability remains with SFU
  • SFU Safety advisors will monitor work
    periodically

7
University Expectations
  • Contractor must have a written safety program
  • Worksafe compliant (WCB)
  • Workers must be trained in the assigned duties
  • Workers must be familiar with regulations
    pertaining to the work being undertaken
  • Professionalism / harassment
  • Community Sensitive
  • Unsafe work practices are Unacceptable and may
    result in the termination of the contract

8
What Every Contractor Needs to Know
  • Security is the first contact for emergencies
    604 291 4500 or SFU direct dial 4500
  • First aid
  • Spill reporting
  • Fire
  • Not 911 we have single address
  • Security will meet and organize emergency
    response personnel as they arrive.

9
Worksafe Matters (WCB)
  • Where the Contractor is required to Notify the
    WCB the SFU Project Manager is to be copied
  • All Asbestos NOPAs are to be copied to SFU OHS
    Department fax 604 291 5678
  • Any Written communication from the WCB is to be
    copied to the SFU Project Manager
  • This may include certification by a P.ENG,
    written orders, variance order, etc.

10
Safety Issues Protocols
  • Site hazards
  • Asbestos
  • Biological
  • Radiation
  • Magnetic fields
  • Stack emissions
  • Confined spaces
  • Fall protection
  • Pest control
  • Air intake locations
  • Underground utilities
  • Call before you dig
  • Who Both the Project Manager 1 800 474 6886
  • Protocols
  • Traffic Disruptions 1 week notice
  • Parking requirements
  • Weight restricted vehicles
  • Smoking designated areas only
  • WHMIS
  • Electrical lock out/permits
  • Working near energized conductors
  • Confined space entry
  • Cutting coring

11
Electrical Department
  • Authorization is required for the following
  • Access to the electrical rooms
  • Power connections to the University's electrical
    system
  • temporary power connection
  • working on energized panels and circuits

12
Labels on Campus
  • Biological

13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
When in Doubt Please Ask !
  • Who to ask?
  • Your Project Manger Get his card !
  • Security 604 291 3100 (non emergency)
  • OHS 604 291 3867
  • Contractors please supply your emergency contact
    information to your Project Manager
  • Communications are essential

18
Thank you for your time
  • Have a Safe Project
Write a Comment
User Comments (0)
About PowerShow.com