B. O. S. - PowerPoint PPT Presentation

1 / 29
About This Presentation
Title:

B. O. S.

Description:

BOS is a practical and simple approach to coordinating key business and ... the equipment may need to be refurbished, updated or even replaced to be capable ... – PowerPoint PPT presentation

Number of Views:96
Avg rating:3.0/5.0
Slides: 30
Provided by: Phoe78
Category:

less

Transcript and Presenter's Notes

Title: B. O. S.


1
B. O. S.
  • Business Operating System

2
B.O.S. DEFINITION
  • BOS is a practical and simple approach to
    coordinating key business and operating
    objectives with real projects and activities.
  • BOS also provides a practical and simple approach
    to collectively use the tools we have discussed.

3
B. O. S. CHART
  • Is a one page chart showing data trends
    identifying key factors, tracking projects and
    monitoring improvements.

4
WHY USE THE B. O. S. CHART TOOL?
  • B. O. S. charting is a standard tool used to
    support visual control
  • One page summary which facilitates management at
    a glance.
  • Ensures real activities are occurring to improve
    the areas identified as important to the company
  • Is an excellent communications tool
  • to employees
  • to management

5
BOS CHART FORMAT
6
BOS Key Measurable PPM - Steel Can Assembly Cell
Ref
Description
Resp.
End Date
1
Redesign finished goods packaging
AM
7/18/95
Procure new component parts
2
JK
6/30/96
containers
3
Improve weld in process weld
SL
7/24/95
monitoring system
4
Replace current controller on paint
GA
9/20/95
system
Ref
Description
Jan
Mar
May
Jul
Sept
Damaged
1
51
48
45
39
5
Assembly
2
20
20
18
20
19
Cracked Casing
3
Broken Weld
19
17
21
18
1
4
Paint Blister
14
19
18
10
14
7
BOS IMPLEMENTATION
  • Identify key measureables
  • Brainstorm
  • Analyze data
  • Pareto analysis works well
  • List Improvement activities
  • Fishbone diagrams
  • Track improvement activities
  • Unique measures

8
Fishbone Diagrams
  • Lists the possible causes of a problem by
    considering the following areas
  • Man
  • Methods
  • Materials
  • Machines
  • Environment

9
Fishbone Diagrams
  • Continue to ask the Question Why until there is a
    consensus that the root cause has been uncovered

5 Why's
Problem
Why
Why
Why
Why
Why
Root Cause
10
Fishbone Diagram
Operator
Machine
Broken tool
Training
Calibration
l
Fatigued

Damaged Assembly

Out of spec
Ergonomics
Environment
Wrong
Material
Methods
11
Countermeasures
  • Actions taken to ensure that root causes do not
    resurface at a later date.
  • Examples of countermeasures are
  • Error proofing
  • Gauging and Fixturing
  • Supplier Certification

12
Error Proofing
  • Restricts the ability to incorrectly assemble a
    product
  • Forms of error proofing in our products are
  • Tabs
  • Notches
  • Unsymmetrical Features

13
Gauging and Fixturing
  • Used when it is determined that an operation may
    introduce excessive variation to the final
    product
  • Common examples are
  • Weld Fixtures
  • Final assembly gauges and fixtures
  • Leak check fixtures

14
Supplier Certification
  • How do we control the parts that we buy from
    outside sources?
  • Part Number Certification
  • Supplier Certification

15
Tracking Downtime
  • Important tool for determining the best process
    for producing the product
  • Areas to consider when analyzing downtime
  • Process equipment
  • Production Associates
  • Material
  • Methods
  • Work Area

16
Process Equipment
  • Downtime here may indicate that the equipment may
    need to be refurbished, updated or even replaced
    to be capable of producing an acceptable product

17
Production Associates
  • Downtime in this area may indicate
  • Training needs
  • Lack of knowledge of acceptable product
  • Incorrect line staffing

18
Material
  • If downtime is related to material the following
    may be true
  • The material may not be the best suited for the
    process
  • The material quality needs to be improved

19
Methods
  • Downtime in this area indicates excessive travel
    and or wasted motion as well as
  • Equipment layout concerns
  • Process bottlenecks

20
Work Area
  • Downtime may also be due to environmental
    problems
  • Is it too hot or cold?
  • Is there sufficient lighting?
  • Is the work area safe?

21
Downtime
  • Other methods of tracking downtime are used, they
    are
  • Live production counts
  • Andon alarms
  • Downtime Clocks
  • These are all excellent tools for at a glance
    management

22
Scrap Tracking
  • Used in conjunction with other tools to determine
    the process problems
  • Red Box Method of scrap tracking
  • Identifies suspect product
  • Records all defects
  • Corrective action implemented and logged for
    future reference

23
DEFECTIVE PART
CAN IT
BE REPAIRED
SET-UP
IN LESS THAN 1
/OR SUPERVISOR
CYCLE
DETERMINE CORRECTIVE
INTERIM ACTION IN ORDER TO
RESUME PRODUCTION
DOCUMENT ACTIONS
REPAIR PART
CONTINUE
NORMAL
PRODUCTION
SET-UP INFORMS
SET-UP /OR
INSPECTOR OF
SUPERVISOR
REASON FOR
DECIDE IF PART
SCRAP
REPAIRABLE
REPAIR PARTS
REFER TO WORK
INSTRUCTION
13.1.8, "SCRAP
SALVAGE"
CONTINUE NORMAL
PRODUCTION
24
LETS REVIEW WHAT WHY
  • B O S
  • BUSINESS OPERATING SYSTEM
  • B O S is a practical and simple approach to
    coordinating key business and operating
    objectives with real projects and activities

25
B O S IMPROVES COMMUNICATION
  • Fosters management at a glance
  • Insures communication of key goals to workers,
    management, visitors, everyone
  • Allows operators to communicate activities and
    progress to management
  • Facilitates visual control

26
BOS REQUIRES ACTION
  • Proper use requires specific action to address
    key objectives
  • Includes tracking progress of activities
  • Demonstrates organizations commitment to
    improvement activities

27
CONCLUSION
  • These tools are simple to use
  • They can be implemented in any area at Arvin
  • B.O.S. charting visibly closes the loop from the
    measure and its cause to the actions being taken
    to improve

28
Report Out Deliverables
  • Present a B.O.S. Chart for Report Out Exercise 7.
    Use the standard 4 quadrant format.

29
BOS Chart
Write a Comment
User Comments (0)
About PowerShow.com