Information Technology - PowerPoint PPT Presentation

About This Presentation
Title:

Information Technology

Description:

LHCb GRID. Meeting. 11/12 Sept 2000. Sept 11 2000. LHCb-GRID T. Bowcock. 2. AGENDA ... 2M events in mini DST2 format (600kB/evt) after L0/L1 cuts (Liverpool) ... – PowerPoint PPT presentation

Number of Views:14
Avg rating:3.0/5.0
Slides: 7
Provided by: them84
Category:

less

Transcript and Presenter's Notes

Title: Information Technology


1
11/12 Sept 2000
LHCb GRID Meeting

2
AGENDA
  • 930 LHCb MC Production
  • Points
  • SICB
  • Processing Req.
  • Data Storage
  • Data Transfer
  • Quality Checking
  • Bookeeping
  • ??
  • Discussion
  • Points of Action
  • 1100 Tea
  • 1200 Departure for

3
Action Items Responsibilities
  • SICb Eric, Martin (L), David S. (RAL)
  • Production
  • Bbar inclusive 500k events in DST2 fomat without
    trigger requirements (RAL)
  • 2M events in mini DST2 format (600kB/evt) after
    L0/L1 cuts (Liverpool)
  • Need to generate about 20M events at 210 secs
  • Reconstruct 2M at 130 secs /event
  • DST2 min bias 2M at 100 secs/evt
  • Min bias reconstruction 2M at 50 secs /evt
  • Pileup 2M at 50 secs/evt
  • Total 20M at 250 secs / event (6 mths on MAP)
  • Target 500 events/file merge files if necessary
  • Total data sample (2M evts) is 1.2 TB

4
Action Items
  • Data storage/Transfer
  • Data rate generated 60kB/sec
  • Network bandwidth Liverpool CERN 500 kB/s
    overnight (50 duty cycle)
  • Bandwidth Liverpool RAL to be measured
  • Data at MAP (disk), copy to RAL , copy RAL to
    CERN where central bookkeeping is updated
  • Data sample corresponds to 50 x 20 GB tapes
    (5kSFr)
  • Try direct transfer from Liverpool to CERN
  • Eric (CERN), Martin (liverpool), Dave S (RAL)

5
Data Quality Checking
  • SICbCHK now exists (summer student)
  • Histos available viewable from web
  • AJ data quality manager responsible
  • No formal responsibility for data quality
    checking at Liverpool
  • RNDM numbers seeds? Chris to email Eric with
    DELPHI scheme.

6
Bookkeeping
  • For production use same mechanism for
    generating scripts for submitting batch jobs.
  • Event type, size of dataset etc
  • Send back log files (at least in short term),
    incl. new log file with bookkeeping information
  • Update database at CERN on receipt of the data
  • Database has entry with name of dataset at place
    where it was generated
  • Joint development needed (Eric and new postdoc at
    Liverpool)
Write a Comment
User Comments (0)
About PowerShow.com