Project Update - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Project Update

Description:

Tasks Funded on Existing R&D Money. MIT-PSFC's Solenoid Conceptual Design ... a revised two year proposal remain in limbo at NSF as MPS seeks additional funds ... – PowerPoint PPT presentation

Number of Views:156
Avg rating:3.0/5.0
Slides: 9
Provided by: michael587
Category:
Tags: limbo | project | update

less

Transcript and Presenter's Notes

Title: Project Update


1
Project Update
  • M. Hebert

2
Tasks Funded on Existing RD Money
  • MIT-PSFCs Solenoid Conceptual Design Report
    Done
  • Magnet Industrialization Studies Done
  • Part-time Solenoid Subsystem Manager support
    Ongoing
  • Tracker RD at Houston and UCI Ongoing
  • Calorimeter RD at NYU Ongoing
  • Cosmic Ray Shield RD at William Mary Ongoing
  • Interim base support for Houston and William
    Mary Ongoing
  • Water-cooled target studies at UCI Ongoing
  • Antiproton window and vacuum design studies at
    BNL - Ongoing
  • Full-time Project Manager support Ongoing
  • Internal Reviews None since the last meeting

3
Money Status
  • We have received spending authority for the final
    year of three year 1.5M original grant
  • We will commence the second and final year of
    600k grant in June
  • Our original one year proposal and a revised two
    year proposal remain in limbo at NSF as MPS seeks
    additional funds to direct to RSVP this year
  • Possible help from Congress, requested budgets
  • Minimal life support and two steadily better
    cases for FY06 start
  • Ditto for FY05 start
  • Single RSVP request from PI to Deena Baron by
    second week in June
  • Meeting with KOPIO tomorrow to finalize numbers

4
Scenarios for FY05 Start
5
Scenarios for FY06 Start
6
Reference Design
  • The original document has been split into
    separate pieces along WBS lines.
  • Several are available publicly on the MECO site
    now
  • MECO Standard Coordinate System
  • WBS 1.3.2 - Heat and Radiation Shield Reference
    Design
  • MIT's MECO Solenoid System Conceptual Design
    Report
  • WBS 1.5.1 - Muon Beamline Vacuum System Reference
    Design
  • WBS 1.5.2 - Collimator Reference Design
  • WBS 1.5.6 - Muon Beam Stop Reference Design
  • WBS 1.5.5 1.5.8 - Detector Shields and Absorber
    Reference Design
  • WBS 1.5.7 - Anti-Proton Stopping Window Design
    Report
  • More will follow in June as they form the basis
    of the interface control documents for the RFP

7
First Solenoid Safety Brief Tomorrow
830 Introduction D. Phillips
840 MECO Overview M. Hebert
910 Magnet Systems Introduction B. Smith
940 Solenoid Protection from the Primary Beam K. Brown
955 Quench Protection and Detection System B. Smith
1025 Break
1035 Magnet Structure Structural Analyses P. Titus
1130 Cryogenics, Relief Valves, Code Compliance B. Smith
1200 Lunch
100 Explosion Risks for Irradiated Cryogenic Liquids W. Meng / B. Smith
130 Anti-proton Stopping Window Design D. Weiss
145 Power Supply and Electrical Safety Plan W. Meng
200 ODH, Maintenance and Confined Spaces D. Phillips
215 Magnet Installation, Lifting Fixtures, Critical Lifts P. Titus
230 Discussion, Action Items
300 Adjourn
8
Upcoming MECO Talks
  • MECO overview from Peter Yamin at NuFact03 and
    CIPANP03
  • TJ Liu (?) on the magnets at NuFact03
  • Jim Popp on the production target studies at
    NuFact03
  • I will give the MECO talk at Klapdors Beyond
    the Desert 03 conference
Write a Comment
User Comments (0)
About PowerShow.com