Title: Test-bed 1 Integration Status
1Test-bed 1 Integration Status
- Frascati, 5 October 2001
- Flavia Donno, Bob Jones, Charles Loomis
- on behalf of the WP6 integration team
2Globus 2 alpha4 Testing Status (4 Oct 2001)
- Basic Globus distribution
- Distribution from CVS builds successfully on
reference platform (RH 6.2, gcc 2.91.66) - gatekeeper, job mgr (fork), GridFTP configured
work - Basic cmd line features (grid search, client
side etc.) work - MDS
- Includes GRIS GIIS but not GRAM (Globus team
are working on this) - hello world works
- Small bugs found but no show-stoppers
- more testing required next week but
- EVERY REASON TO BELIEVE GLOBUS 2 WORKS
3Globus 2 Configuration
- Base Configuration
- automating configuration
- making compatible with LCFG objects (WP4)
- Security
- RPMs for all EDG Certificate Authorities
- Automatic fetching of CRL
- Information Systems
- Tested MDS configuration.
- Have WP3 configuration packaged will test
shortly.
4WP Status
- WP1
- Waiting for delivery of JSS, RB, UI, II, LB.
- Uses Globus1.1.5b14MDS2.1JobManager...
- WP2
- GDMP/RC API/BI API
- delivered on time Globus 1
- compiled and pinged on Globus 2
- SpitFire
- delivered no real dependencies on Globus
- testing about to start
- WP3
- MDS configuration delivered packaged.
- Testing to start next week.
5WP Status
- WP4
- Image installation/System Installation/Configurati
on Mgt./ - PBS, LSF Info. Providers
- Server up and running.
- Installed two testbed machines with it some
problems. - WP5
- limited participation
- WP7
- Network monitoring scripts.
- Delivered and packaged.
- Put in CVS and testing begun.
6Authorization Issues
- GridMapFile
- needs to be published in MDS to satisfy WP1
- not related to Globus
- site mgrs should be aware of this need before
participating in TB1 - temporary measure which needs to be revisited for
TB2 (by WP1) - Alternatives for authentication
- use Authorization WG sw tools
- received by not yet tested by ITeam
- site mgrs create set of accounts for each
application WP/experiment - in preparation, application WP mgs should send
set of required accounts to WP6 before 22 Oct.
7VO layout
Authorized Use Contract (AUC)
WP 6
Experiments
1. Get certificate 2. Sign AUC 3. Register with VO
GridMap file
8How will users/sites know how to use TB1?
- WP6 currently assembling
- software suite for TB1
- available via webserver for installation on
reference platform - Globus 2 packaged as RPMs available 15 Oct.
- documentation describing
- software suite
- steps for a user to gain access to TB1 resources
- steps for a site mgr to participate in TB1
- Ready for TB1 usage on partner sites (Nov.15)
- announced via email
9Revised Schedule (as of 3 Oct)
October 1 Intensive integration starts October
22 First beta release of DataGrid (CERN
Lyon) (depends on changes needed Globus
1-gt2) Presentation of TB1 at CERN Tuesday 30th
October November 15 Initial limited application
testing finished DataGrid ready for deployment
on partner sites November 30 Widespread
deployment Code machines split for
development Testbed 1 open to all
applications December 25 WE ARE DONE!