08:00 Meeting - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

08:00 Meeting

Description:

GLAST LAT Project EM2 Test Series Friday June 18, 2004. L. Wai 1. 08:00 Meeting. 4p-8p ... Fasten TEM to Mini-CAL. TEM flex cable mates. Setup for Single Bay LPT. Gary ... – PowerPoint PPT presentation

Number of Views:17
Avg rating:3.0/5.0
Slides: 2
Provided by: larr7
Category:
Tags: fasten | meeting

less

Transcript and Presenter's Notes

Title: 08:00 Meeting


1
0800 Meeting
Tues. June 15 Wed. June 16 Thurs. June 17 Fri. June 18 Sun. June 20 Mon. June 21 Tue. June 22
8a-4p Hiro, Elec.Team Full suite TKR tests Mech. Team Prep single bay frame work Prep Mini-Tower lift fixture Design single bay protective cage w/ wheels 8a-4p Gary Repair Van Der Graaff Mech. Team Light tight Mini-Tower Mech. Team Integrate Mini-Tower into framework Setup for Mini-Tower LPT Elec.Team, Online Mini-CAL LPT (IT) 8a-4p Gary Move Van Der Graaff back into position Mech. Team Integrate Mini-CAL into framework TEM flex cable mates Setup for Single Bay LPT 8a-4p Mech. Team Fasten TEM to Mini-CAL TEM flex cable mates Setup for Single Bay LPT Gary Setup for Van Der Graaff test Test runs Elec.Team, Online Single Bay LPT Elec. Team, Online, Offline Setup for Van Der Graaff test Test runs Data taking script must work at high rate Training for weekend operators (Tune, Gary, Larry) 8a-4p Gary, Larry, Online Van Der Graaff test 8a-4p Elec.Team EM2 TEM/TPS safe-to-mate test Mech. Team Swap-in EM2 TEM/TPS Elec.Team, Online Single Bay LPT (Must work with EM2 TEM/TPS) 8a-4p Mech. Team Build/install protective cage Elec.Team Single Bay LPT Mech. Team Ship Mini-Tower assembly to bld 84 ELX lab
4p-8p 4p-8p Hiro, Elec.Team Mini-Tower tests 4p-8p Elec.Team Mini-CAL LPT Mini-Tower LPT 4p-8p Offline Van Der Graaff test analysis (test runs) 4p-8p 4p-8p Elec.Team, Online Single Bay LPT (Must work with EM2 TEM/TPS) 4p-8p Elec.Team Post-ship Single Bay LPT
Write a Comment
User Comments (0)
About PowerShow.com