Title: BROOKHAVEN NATIONAL LABORATORY
1BROOKHAVEN NATIONAL LABORATORY
- Institutional-Level
- OSH Management Review
- OHSAS 18001
- Safety and Health Management System
- December 19, 2006
2Purpose of Meeting
- Top management shall evaluate OSH Program for
- Suitability- Does it fit BNL operations
systems? - Adequacy-
- Does it meet requirements?
- Is it implemented appropriately?
- Effectiveness- Is it achieving the OSH Policy and
Objectives? - Identify possible need for changes to the Policy,
Objectives, and/or other program elements, based
on a review of key system components including - Audits and assessments
- Changing Circumstances
- Commitment to Continual Improvement
- Output Minutes of this meeting, record of
managements decisions
3 Program Inter-Relationships
DOE Mandated Voluntary improvement
initiatives
41. Discuss Suitability of the current OHS policy
- Feedback from line organizations Management
Reviews in 2005 indicated a change was needed - Team revised the Policy
- Line Organizations reviewed the changes
- BNL adopted the Policy
- Distributed to line organizations
See Policy and Handout pages 6 - 7
- Issues
- 1a. Communication of the new Policy may be less
than adequate across the site - Phase 3 workers did very well in their knowledge
on their registration audit. - 1b. Replacement of postings of the old Policy
with the new revision has not been verified
51. Discuss Suitability of the current OHS policy
1c. Does the new revised POLICY meet or improve
on these OHSAS 18001 requirements ?
- OHSAS 18001 Element 4.2 requires that the Policy
- Be appropriate to the nature and scale of the
organizations OSH risks - Include a commitment to continual improvement
- Include a commitment to at least comply with
current applicable OSH legislation and with other
requirements to which the organization
subscribes - Be documented, implemented, and maintained
- Be communicated to all employees with the intent
that employees are made aware of their individual
OSH obligations - Be available to interested parties and
- Be reviewed periodically to ensure that it
remains relevant and appropriate to the
organization.
62. Discuss The adequacy of current hazard
identification, risk assessment, and risk control
processes
- Risk Assessment
- Job Risk Assessments
- Facility Risk Assessments
- ISM Initiatives
See Handout pages 8 - 13
- ISSUE (from line organization Management Reviews)
- 2a. Some organizations want the site level JRAs
to be maintained only at the site level (i.e.
consolidate line organization versions) - 2b. Create a sitewide Natural Hazards FRA
- 2c. Fire System Inspection Test and Maintenance
Life safety (egress) features of older facilities
legacy
73. Discuss Recorded instances of procedures not
being effective
- Requirements Management
- NSF Registration Audit SHSD Industrial Hygiene
procedure was not tracking Noise Hearing
Conservation legal requirements. - Internal audit- Safety Engineering- legal
requirement management process not being
conducted or documented. - Arc Flash incident
See Handout pages 14 - 15
Issues 3a. Record of Decisions are not uniformly
documented for all OSH disciplines. (Legacy,
resource limited) 3b. Safety Engineering and
Industrial Hygiene requirements management
procedures in-place but lack resources for timely
review of regulations consensus standards (160
) for impact on OSH program.
84. Discuss Adequacy of resources (financial,
personnel, material)
- Issues that require continued focus/emphasis
- Industrial Hygiene Personnel Exposure Monitoring
- Safety Engineering and Industrial Hygiene Program
Administrators - ESH support in small organizations, CFN, NSLS II
- Nationally Recognized Testing Lab Authority
Having Jurisdiction - Fire Protection
- Emergency Management
- Emergency Response
See Handout pages 16 - 23
- Issue
- 4a. Support for Safety Engineering and Industrial
Hygiene areas is under weighted compared to other
ESHQ programs - 75 Programs covered by 11.5 SME (6/1 ratio)
94. Discuss Adequacy of resources (financial,
personnel, material)
- Nationally Recognized Test Laboratory Approval
(NRTL) of Electrical Equipment - Applies to equipment built, acquired, or brought
onto the BNL site and connected to a source of
electrical power. - Electrical equipment is inspected to ensure it is
free from reasonably foreseeable risks due to
electrical hazards. - Electrical Equipment Inspections (EEI) determines
that equipment has/is - Enclosed energized parts,
- Bonded and grounded,
- Afforded adequate over-current protection.
- Can not cause a shock, burn or fire if used
properly.
See Handout pages 22- 23
Issue 4b. 40,000 pieces of equipment need
Authority Having Jurisdiction (AHJ) approval
105. Discuss The effectiveness of the hazard
reporting process
- BNL mechanisms for hazard reporting
- Tier I Process
- Events/Issues Management
- New process developed, implemented and assessed
in 2006 - Safety reporting hotline
- S2 program
- OMC Clinic
- DOE Hotline
- RAR
See Handout pages 24 - 30
No Issues
116. Discuss The effectiveness of the OHS
inspection process (i.e. Tier 1, Safety
Observations, etc.)
See Handout pages 31- 32
- Issues
- 6a. BNL needs more OSH SME field deployed
(Feedback from ESH Coordinators). - 6b. ESH Coordinators need additional OSH training
(Feedback from ESH Coordinators). - 6c. Fire Hazard Assessments 56 facilities 3
complete 15 in-progress need Funding commitment
to complete. - 6d. Long periods of Open items submitted to the
Traffic Safety Committee.
127. Discuss Data relating to accidents and
incidents that have occurred and the output of
investigations
- Radiological Awareness Reports
- IH monitoring for noise, silica, chemicals,
non-ionizing radiation, etc. - ORPS
- Accident/ Injury/ Incident Data
See Handout pages 33 - 50
Issue 7a. Industrial Hygiene employee exposure
surveys not completed for all operations.
Sampling in FY06 indicates BNL may still have
some un-discovered exposure operations. The
probable areas are not in laboratories, but in
maintenance, construction, and non-lab research
operations.
137. Discuss Data relating to accidents and
incidents that have occurred and the output of
investigations
See Handout page 47
- Issue
- 7b. FY07 DART and TRCR goals are very
challenging. -
- DART Goal equals 6 cases,
- TRCR goals equals 16 cases in a year.
- YTD performance is
- DART 1 case
- TRCR 5 cases
14Internal OSH Assessment
8. Discuss Results of internal and external OHS
management system audits
- OHSAS 18001 Internal Audits were conducted for
Phase 1, 2 and 3 organizations at the
organization level. - Issues were reported in organizations Management
Reviews, - No Lab-wide issues are currently open from
Internal Audits. - Improvement Phase 1 and 2 reports were combined
this year into a site report. Next year all
Phases will be combined into one Audit report.
See Handout pages 51 - 56
No issues. All site issues addressed in
Corrective Action Plans and FY07 OSH objectives.
158. Discuss Results of internal and external OHS
management system audits
- OSH External Audit
- June 2006 Combined ISO 14001-OHSAS 18001
Surveillance Audit - 0 Major nonconformances
- 0 Minor nonconformances
- 1 Opportunity for Improvement DOCUMENT CONTROL
- Nov 2006 Phase 3 ORR
- 0 Major nonconformances
- 0 Minor nonconformances
- 3 Opportunities for Improvement
- Nov 2006 Phase 3 Registration Audit
- 0 Major nonconformances
- 3 Minor nonconformances
- 3 Opportunities for Improvement Document
Controls, Risk Assessments procedures
Site Level Issues are addressed in Corrective
Action Plans
169. Discuss The state of preparedness for
emergency
Emergency Management/ Planning
See Handout pages 57 - 59
- Issues
- 9a. Office of Emergency Management (OEM) is
comparably understaffed to complete the
requirements and meet compliance - 9b. Organizational drills (not conducted by OEM)
are either not occurring or are not being
documented - 9c. CMS does not have all elements needed for
Emergency Management purposes
179. Discuss The state of preparedness for
emergency
Fire Department
See Handout pages 57 - 59
- Issues
- 9d. Fire Department staffing for fire response,
hazardous materials, technical rescue, confined
space rescue mutual aid does not meet NFPA 1710
requirements. - 9e. Emergency Medical Services DOE requires EMS
to be on par with community. - 9f. Fire Department equipment replacement.
- 9g. Site Fire Protection Needs Water supply
system Fire alarm panels Heat Detectors
Sprinkler head recall replacement Site Fire
Alarm System
18- CAD has expanded JRAs with more worker input-
Safety Observation Program- Safety Recognition
Program (S3)
10. Discuss Improvements to the OHS management
system (e.g. new initiatives to be introduced or
expansions of existing initiatives)
See Handout pages 60 - 64
19OSH program Issues brought up from line
organizations OSH management reviews
10. Discuss Improvements to the OHS management
system (e.g. new initiatives to be introduced or
expansions of existing initiatives)
See Handout pages 60 - 64
2011. Discuss Effects of foreseeable changes to
legislation or technology
- 10 CFR 851 brings in new enforcement action to
legal requirements in 2007 - Nanomaterials
- Employee Exposure Monitoring
- Engineering Controls
See Handout pages 65 - 71
Issues 11a. 10CFR851 Policy Council may need to
authorize funding for gaps in the Institutional
Corrective Action Plan 11b. 10CFR851 Dept.
Chair/Div. managers need to assure that a robust
line organizations Corrective Action Plan is
implemented to address gaps in their
department/division programs.
2112. Setting or updating of OHS objectives for
continual improvement in the forthcoming period
Status on FY06 Objectives, See Handout Pages 72-
79
- Continually improve the OSH management system.
Expand registration to Phase 2 3 organizations
and maintain OHSAS 18001 registration in Phase 1
organizations. - Close OSHA Inspection Findings and expand
corrective action to un-cited deficiencies on
OSHA Inspection Findings (Extent of Conditions) - Improve Accident/Injury rate performance
- Design Mechanisms to encourage Zero Traffic
violation - Expand participation in the BNL Safety Solutions
(S2) Program. Complete projects, Seek
alternative funding to support and implement the
program.
2212. Setting or updating of OHS objectives for
continual improvement in the forthcoming period
Status on FY06 Objectives, See Handout Pages 72-
79
- Improve the implementation of in the Mechanical
Material Handling site program - Compliance- 10CFR850 and 10CFR851
- Conduct Gap Analysis and Self Assessments
- Implement the Corrective Action Plan to eliminate
gaps identified in the BHSO Assessment of
Industrial Hygiene Monitoring - Schedule and conduct regulatory OSH compliance
assessments to evaluate compliance to applicable
regulations on a three-year cycle
2312. Setting or updating of OHS objectives for
continual improvement in the forthcoming period
Status on FY06 Objectives, See Handout Pages 72-
79
- Develop and implement an Authority Having
Jurisdiction (AHJ) program to approve equipment
that does not have Nationally Recognized Testing
Laboratory certification (NRTL) - Develop and implement a program to conduct Arc
Flash Calculations to conform to NFPA 70E - Open the Laboratory to the public for safety
related special emphasis programs such as Summer
Sunday exhibits - Develop a Safe Employee Recognition and Award
program (S3)
2412. Setting or updating of OHS objectives for
continual improvement in the forthcoming period
Setting FY07 Objectives, See Handout Pages 77- 79
- Issue
- 12a. Line organizations need to re-focus
attention on the content of FY07 objectives. - Better defined measurable targets
- (Assigning owner and date was not an issue)
- (Based on NSF Phase 3 Registration Audit)
2512. Setting or updating of OHS objectives for
continual improvement in the forthcoming period
- IMPROVE THE OCCUPATIONAL SAFETY HEALTH
MANAGEMENT SYSTEM (OSH) - Integrate multiple BNL Management Systems related
to OSH into more streamlined management systems)
that are based on the principles and core
functions of DOEs ISM and OHSAS. - Complete the site level OHSAS 18001 registration
and continually improve the OSH management system
in registered organizations. - CONDUCT OSHA EXTENT OF CONDITION REVIEWS
- Expand corrective action to un-cited deficiencies
similar (i.e. like-instances) to the cited OSHA
Inspection Findings (i.e. conduct an
extent-of-condition review). - Improve ladder and industrial stair safety by
communicating key requirements for fixed stairs
and ladders to Building Managers and key staff
involved in Tier 1 inspections. - IMPROVE ACCIDENT AND INJURY RATE PERFORMANCE
- Improve Accident/Injury injury rate performance
DART 0.25 TRCR 0.65 - Design mechanisms to encourage Zero Traffic
violations - Expand participation in the BNL Safety Solutions
(S2) Program. Institutionalize the Laboratory
funding of this accident/injury prevention
program. - IMPROVE THE IMPLEMENTATION OF THE MATERIAL
HANDLING TRAINING PROGRAM - Implement Corrective Actions on deficiencies in
the site mechanical material handling program - Develop/revise new training material as needed
for the mechanical material handling program,
exploring outside vendor with equipment specific
expertise. - Develop lab-wide manual-lifting guidelines to
reduce overexertion injuries. - Improve facility level training by systematically
evaluating the effectiveness of training through
Field Observation and ensuring that required
procedures and equipment are understood and
utilized on the job. Provide tools (observation
checklists) to facility experts to aid in field
observation.
2612. Setting or updating of OHS objectives for
continual improvement in the forthcoming period
- COMPLIANCE - Achieve full compliance with
applicable occupational safety health
requirements. - Actively participate in implementation of new
initiates to achieve compliance with 10CFR850 and
10CFR851 - Improve implementation of SBMS OSH Subject Area
requirements - Improve implement of BHSO IH Monitoring
Assessment Corrective Action Plan to eliminate
gaps in the Industrial Hygiene monitoring
requirements. - Conduct regulatory OSH compliance assessments
that are integrated into a comprehensive audit
schedule covering OSH, Fire Protection,
Radiological Protection, Emergency Planning, etc.
- Implement the Authority Having Jurisdiction
(AHJ) program (to approve electrical equipment
that does not have Nationally Recognized Testing
Laboratory (NRTL) certification) and 5-year Plan
developed in FY05. - Develop and implement a program to conduct Arc
Flash Calculations to conform to NFPA 70E. - Increase OSH awareness and requirement
implementation by line organizations with OSH
Subject Area training. - COMMUNICATIONS - Improve communications, trust,
and relationship with stakeholders on
occupational safety health programs. - Open the Laboratory to the public for safety
related special emphasis programs such as Summer
Sunday exhibits and Safety Week events. - Seek a research oriented motivational speaker on
safety awareness. - Improve consultation and communication with
employees on OSH issues. - Enhance participation in the Safe Employee
Recognition Award (S3) program.
2712. Setting or updating of OHS objectives for
continual improvement in the forthcoming period
- 7. STUDENT SAFETY Improve awareness and
training of short term researchers and students
in occupational safety health hazard control
programs. - Incorporate health and safety hazards with an
emphasis on short term researchers and students
(who have minimal work experience and familiarity
with BNL OSH programs) into existing general
employee training. - Develop organization level training for short
term researchers and students who are exposed to
unique equipment and operations with health and
safety hazards. - 8. EMERGENCY PREPAREDNESS Improve awareness and
training of staff in emergency preparedness and
response actions. - Develop and deliver Laboratory level incident
drills to measure the effectiveness of response
organizations and line organizations to emergency
events. - Enhance organization level staff knowledge and
skills in emergency preparedness. - 9. TRAVEL Improve awareness and staff in
occupational safety health hazards of domestic
and foreign travel. - Develop Laboratory level training on health and
safety hazards associated with domestic and
foreign travel. - Develop organization level awareness of health
and safety hazards if line organization personnel
encounter unique situations during domestic and
foreign travel
2812. Setting or updating of OHS objectives for
continual improvement in the forthcoming period
- Senior Management feedback and direction
- Senior Management commitment to Continual
Improvement - Suitability- Adequacy- Effectiveness-
- Do the Objectives target Continual Improvement ?
- Do the Objectives address the current level of
risk ? - Is there adequate resources (financial,
personnel, material) to meet the objectives ? - Do the Objectives address foreseeable changes to
legislation or technology ? - Are the Objectives achieving the desired results
? - Is there a need for changes?
Setting FY07 Objectives, See Handout Pages 77- 79
29- Feedback on the format of this presentation