Overview%20of%20the%20Frascati%20Production%20Facilities - PowerPoint PPT Presentation

About This Presentation
Title:

Overview%20of%20the%20Frascati%20Production%20Facilities

Description:

At the end of '98 started a program of design and development ... 2 layers - one on each side glued. praxial alignment platforms glued. Produced 200 tubes ... – PowerPoint PPT presentation

Number of Views:82
Avg rating:3.0/5.0
Slides: 7
Provided by: cura1
Category:

less

Transcript and Presenter's Notes

Title: Overview%20of%20the%20Frascati%20Production%20Facilities


1
Overview of the Frascati Production Facilities
  • Chamber assembly
  • Developed and implemented in Frascati since many
    years (BML98, BML96)
  • Now finalized to the final decisions made on the
    chamber
  • Wiring Machine
  • At the end of 98 started a program of design and
    development of a fully automated machine.

2
  • Wire tension measurement
  • A system, based on electrostatic method, capable
    of measuring up to 16 tubes at a time has been
    developed and built.
  • Gas leak and HV test station
  • A system capable of measuring 64 tubes has been
    developed and built
  • Wire-tube position measurement
  • The EMMI, developed and built by Rome and
    Pavia, has been adopted

3
  • Clean Room
  • The above listed facilities are housed in
    separate areas inside a single large clean room.
  • Hall Space
  • A large hall in which the clean room is located
    is available
  • Storage
  • Storage (and transport) structures have been
    designed and 2 prototypes have been built

4
  • Cosmic Ray Test Station
  • It is under construction
  • Chamber gas leak test stand
  • It has to be designed and realized
  • Data Base
  • The Data Base system is being implemented

5
Module 0
  • Module 0 is being built
  • 2 layers - one on each side glued
  • praxial alignment platforms glued
  • Produced gt 200 tubes
  • The construction is going on with continuity.
    Interventions for the optimization of the
    performances are postponed

6
Module 0
  • After full experience with module 0 ?effort for
    the optimization before moving to full speed
    production