... removing magazine, using insertor to inset and remove a manually loaded slitmask ... Needs slitmask magazine, more automated acquisition procedure to be ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 19
Provided by: KennethN6
Learn more at: http://www.sal.wisc.edu
Category:

less

Transcript and Presenter's Notes

Title: Robert Stobie Prime Focus Imaging Spectrograph Status


1
Robert StobiePrime Focus Imaging
SpectrographStatus
  • On-telescope throughput analysis
  • Ghost analysis
  • Repair plan
  • Status of other current control and mechanical
    issues
  • Commissioning progress
  • Budget

2
RSS Optics Throughput Shortfall
  • Telescope system testing found RSS optics
    throughput 60 of expected in visible, lt 25
    below 375 nm
  • Either blank absorption or coatings at fault

3
Blank Absorption Investigation
  • Polished and measured spare NaCl blank - good
  • Remaining possibility of effect found for UVES
    coating process causing development of "color
    centers" in CaF2. Curable by UV Flooding

4
Throughput Test Apparatus
  • To isolate optical subsystems with problem and
    narrow range of causes, develop apparatus to
    measure throughput of integrated optics at 375
    and 635 nm
  • Tests performed 23 - 30 Sept, 2006

5
Throughput Experiments
6
Subsystem Throughput
  • Throughput of 7 subsystems derived
  • MgF2 coatings, LLNL fold flat exonerated
  • Visible loss in collimator main group and camera
  • UV loss also in collimator doublet
  • Multiplying losses consistent with on-sky system
    results

7
Conclusions
  • no common coatings gt at least 2 separate
    problems.
  • doublet shows transmission lt 1 - reflectivity gt
    CaF2 color center possible. Definitely
    multilayer coating problem.
  • problem in collimator main group means instrument
    must come off.

8
Ghost
  • Flatfield ghost with interference filter imaging
    and Fabry-Perot
  • in interference filter sky images and flat fields
    see 10 doughnut which appears to be an image
    of the pupil
  • does not show up with clear or color filters gt
    one ghost surface is the filter (reflection 10
    100 depending on wavelength)
  • a severe problem for FP mode
  • determined to be internal to RSS
  • Ghost investigation
  • take flats with various pupil masks inserted in
    grating holder, field mask at slit
  • raytrace analysis to find surface that forms
    pupil image
  • circular polaroid between ghost surfaces should
    eliminate it

9
Ghost Geometry
  • Mask experiments -gt 2nd surface in camera
  • Polaroid experiment -gt after filter
  • Raytrace -gt dewar front surface

10
The trouble with the dewar window
  • Predict surface reflectivity from observed ghost
    intensity vs wavelength up to 20 peaking at 540
    nm
  • remove detector, measure and inspect window
    yellow-green
  • Another (different) multilayer problem
  • Fix during throughput repair

11
Repair plan
12
Control Issues
  • Grating insertion interlock problem
  • not interlocked against inserting grating when
    etalon or articulation is in wrong status.
  • this works on built-up spare at UW. Suggests
    wiring or board problem in RSS electronics box.
  • Found error and fixed.
  • Waveplate homing problem
  • found that we need to turn off the waveplate
    rotator encoder when not moving it (stray light).
    Rotator homing then does not work.
  • again, this works on built-up spare at UW.
    Suspect a software or firmware incompatibility.
  • hardware verified with encoder diagnostic
    software.
  • software not waiting long enough after turning
    encoder on. Software problem identified

13
Mechanical Issues
  • Slitmask mechanism
  • severe reliability problems due to difficulty of
    aligning magazine, carrier, and focal plane chute
  • temporarily removing magazine, using insertor to
    inset and remove a manually loaded slitmask
  • SAAO redesigning slitmask assembly to make it
    monolithic, aligned on bench
  • install during down time
  • Articulation fall arrestor
  • safety restraint to prevent catastrophic damage
    in case articulation motor fails during
    articulation
  • installation and testing within a few days
  • Polarizing Beamsplitter
  • SAAO task to redesign and manufacture
    beamsplitter insertor to allow for beamsplitter
    removal/ rotation/ insertion in situ
  • clearance issues resolved. Now installed

14
Commissioning - Longslit Spectroscopy
  • Mostly done. Many PV proposals used.
  • Autoguide setup procedure mature
  • Calibration procedures developed

15
Commissioning - MOS
  • Slitmask cutting process tested
  • Manual acquisition with MOS painful (10 - 20 m),
    but surprisingly possible
  • Orientation control issue identified with
    slitmask cutting/ TCS software
  • Needs slitmask magazine, more automated
    acquisition procedure to be practical

16
Commissioning - Fabry-Perot
  • On 20060922, first light RSS on-sky Fabry Perot
    observations two spiral galaxies, NGC 1535 and
    NGC 1365, at Ha through the LR etalon.
  • roughly 20-step etalon scans through the line.
  • An initial reduction of the data cubes shows a
    velocity map for NGC 1365 which compares well
    with data obtained on other telescopes
  • throughput is within 2x of expected

17
Commissioning - Continued
  • Polarimetric. Next two weeks
  • linear polarization lamp calibration
  • spectropolarimetry on-sky first light
  • linear standards, high and low-res PV
  • circular mCV
  • High speed awaiting detector software issue
  • All UV commissioning after repair (starting May?)

18
Cost to Completion
  • Does not include 50 - 100 K for optics repair
    costs (mostly optomechanical)
  • Predicting CTC 20 over CDR budget
Write a Comment