Robert Stobie Prime Focus Imaging Spectrograph Status

Description:

Grey loss in camera triplet. UV loss in contaminated lens fluid of four multiplets ... support team: Alan Shier (Pilot Group), Marsha Wolf (NIR project) ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 12
Provided by: KennethN6
Learn more at: http://www.sal.wisc.edu
Category:

less

Transcript and Presenter's Notes

Title: Robert Stobie Prime Focus Imaging Spectrograph Status


1
Robert StobiePrime Focus Imaging
SpectrographStatus
  • Optics repair positive progress
  • UV efficiency
  • Some (repair-caused) problems beamsplitter,
    detector
  • Status of other fix and improvement projects
  • Schedule

2
Optics Reprise Throughput/ Ghosts
  • Instrument removed (Nov 2006), optics shipped
    to Pilot Group in Calif (Dec)
  • Disassembled into multiplets, throughput
    measured by monochromator (Feb - Apr 2007)
  • Three problems
  • Yellow ghost due to coating problem on dewar
    window
  • Grey loss in camera triplet
  • UV loss in contaminated lens fluid of four
    multiplets

3
1,2 fixed
  • Field flattener (ghost). Bad coating polished
    off by Janos, new coating applied by Spectrum
    Thin Films (with new moisture repellant
    overcoat). Satisfactory.
  • Camera triplet contact. Backed off pressure,
    contact and grey loss vanished, has not
    reappeared.

4
3 Repair (still) "in work"
  • Found absorption in lens fluid (Cargille LL5610)
    due to polyurethane expansion bladders, and
    (lesser extent) viton O-Rings. After several
    false starts
  • Disassemble multiplets, clean, replace expansion
    polyurethane bladders and viton O-rings
  • Use LL5610 fluid except for Collimator Field
    Lens and Triplet LL3421 a better choice for
    common NIR beam
  • (Aug - Sept) Four of five multiplets repaired.
    During reassembly of the last, two surfaces of
    first CaF2 element in collimator triplet ("OL5")
    damaged by technician error!

5
OL5 Replacement almost done
  • Recovery
  • use existing spare blank
  • Pilot to cover blank, figuring, coating costs
  • figuring by TORC done (promised 2 months
    actual 4 1/2 months)
  • solgel coating by Cleveland Crystals almost
    done. (promised 4 weeks actual 7 weeks).
    (Considered Lick Obs hardened solgel coating too
    risky they do not have experience with large
    CaF2 pieces)
  • resume with triplet assembly at Pilot next week
    (where we were last Sept)

6
Polarizing Beamsplitter
  • Was shipped to Pilot with main optics to solve
    fluid leak problem
  • With resolution of UV optics problem, realized
    beamsplitter would have same problem, verified
    severe UV loss
  • (Nov) Flushed fluid, fixed leak, replaced
    bladder. Verified UV transmission recovered.
  • (Nov) seal on front side lost. disassembled top
    layer, cleaned, realigned.

7
Beamsplitter - 2
  • (Feb) Repotting attempt leaves voids. 4 of 9 top
    prism wedges removed, cleaned, realigned
  • (Mar) Repotting attempt succeeds, except 3 corner
    top prism wedges cracked when removing mold.
  • Recovery plan
  • Pilot Group covering costs
  • possible repair with index-matching glue
    (Lambrecht)
  • possible replacement using spare blank, or new
    blanks
  • 3-6 months? does not affect main RSS
    reinstallation, only polarimetry commissioning

8
Detector
  • Problem with poor temperature stability being
    remedied with new bucking heater
  • (Jan) Due to poorly mated connector, heater came
    on without control loop working heater
    evaporated, leaving contamination film on CCDs
    and (temporary) dewar window
  • Recovery
  • redesigned heater control Done
  • send CCD mosaic to E2V for cleaning Done
  • build up a QE measuring system at SAAO visible,
    points at 320 and 355nm, plus flat field In work
  • will not hold up RSS reassembly

9
RSS Fixes/ Improvements
  • Slitmask mechanism
  • severe reliability problems due to difficulty of
    aligning magazine, carrier, and focal plane chute
  • redesigned, rebuilt, integrated with instrument
    under test
  • Grating stage flexure
  • out-of spec flexure perpendicular to dispersion
  • repaired current grating stage purchased new,
    improved one flexure being tested
  • Etalon flexure
  • ring centers do not flex the same dual etalon
    difficulty
  • improve etalon "seat". Done
  • Fix guider interference (limits field) Parts
    manufactured needs assembly and calibration

10
RSS Fixes/ Improvements - 2
  • Electronics brackets redesign for easier
    maintainance. Done
  • Improve baffling
  • moving baffle damage, maintainability. Material
    received
  • payload/ instrument interface. Done
  • High level software.
  • PCON/ PDET Coding nearing completion. TCS I/F
    next
  • Should be ready to test during reassembly
  • Detector fast readout modification (last SSWG).
    Done, Tested
  • Instrument air humidity improvement
  • found air dewpoint 12 C ! risked dewar window
    fogging.
  • maintained dryer, lines. Dewpoint at payload now
    -10 - -30

11
Repair Schedule
  • UW optics reintegration support team Alan Shier
    (Pilot Group), Marsha Wolf (NIR project)
  • Reintegration schedule
  • No earlier than 28 July 17 Sept
  • Return for lift when telescope is ready

Schedule