Title: Cosmic ray induced 100
1Status WBS of Cosmic Ray Shield
DETECTOR REQUIREMENT Record Potential CR Bkg
Hits for All Trigger Evts
- Cosmic ray induced 100 110 MeV e- events in
detector region, (delta rays or mu decay e-),
require active and passive shielding to suppress. - CR Sim Study has shown that 10- 4 Inefficiency
in a scintillator shield design lt-gt 0.004 bkg
evts / 107s. run.
- Achieving Max Hermeticity in Detector
Deployment - Achieving Max Detector Efficiency For Cosmic
Rays with 2-Fold ORs in a 3 Scintillator Layer
Design - Achieving Max Reduction of Mu Capture Neutrons
in CRS - Developing CR Simulation Studies for Latest CRS
DS Tracker and Calorimeter
J Kane - W M MECO
Collaboration Mtg - UCIrvine
Feb. 06/07, 2005
2Conservative Footprint of CRS Detector
TOP VIEW - Shows Scintillator Modules Concrete
Blocks
High CR Shield Hermeticity
3End View of Active Passive CR Shield
Hermeticity of Shield Planes - L, R, T, B, E
4Half Modules between Floor Beams - 96 Coverage
Shield-B 96 eff
5Full Module Design - 10cm Overlap by Neighbors
6A Close-up View of Hermeticity
Overlap of Full Modules (2.2 x 4.5m)
Al Plate
Scintillator Layer-1 (22 bars / 3 WSF ea)
Bottom Modules (1 x 4.4m) - beneath Return Yoke
7CR Detector Efficiency
- Cosmic Ray Response vs. No. of WSF
in 0.5m MINOS Scintillator
Within the next 3 months 100 extruded full length
scintillator bars should be available for
attenuation studies testing of module
assembly methods.
8Optical Fibers-to-16 Pixels of H8711 PMT Assembly
9Investigation of 64 Pixel PMTs
10BURLE PLANACON MCP - PMT
11H8500 MultiAnode PMT Assembly - 64 Pixels
Discussion with Stan Majewski (head of Jlab
Detector Group)
Burle Planatron vs Hama H8500
He questioned using the first - low in gain
too untested
His group has much experience with the H8500.
Hama has given Jlab 60 for testing in medical
scanner apps. The group has developed a fast
preamp that mates directly to back of base
. Price per channel? /
Stan expressed real interest in helping us in
any way. Having Hamas ear, he plans to push them
to offer a green-enhanced cathode for WLS
fiber users in HEP.
12Further Properties
13First Visit to ITASCA on Feb 16, 2005
Attending ITASCA Staff / Anna Pla-Dalmau / J
Kane / Uwe Greif
Anna Pla MINOS Manager of Production /
Director of FNAL Scintillator Development Lab
Uwe Greif Colorado School of Mines /
nu-e Expt _at_ Spallation Source requiring CR
Shield
Agenda Review Tolerances asked for in Drawing
/ Tour Factory Floor / Press the Flesh
Visit to Development Lab Offer from Anna
14(No Transcript)
15(No Transcript)