Title: ARTICLE 6 (JOINT IMPLEMENTATION)
1- ARTICLE 6 (JOINT IMPLEMENTATION)
- SUPPLY-SIDE PERSPECTIVES
- Ivona Grozeva
Montreal, Side event 30 Nov.
2005 COP/MOP1
2Content
- The role of JI in the national CC strategy
- JI framework in Bulgaria
- Overview of JI projects
- Plans concerning JI in Bulgaria
- Planned activities to meet the eligibility
requirements for JI Track I - Host Country view on JI Track I
- The impact of the Linking directive
3The role of JI in the national strategy
- Meeting the Kyoto Target - surplus
- Second National Action Plan on Climate Change
- EU ETS
- Joint Implementation
- Management of AAUs Green Investment Scheme
4JI framework in Bulgaria
- Designated focal point for approving of JI
projects MoEW - National guidelines and procedures in place
- 5 MoU signed, 12 projects approved
5Approved JI Projects
PROJECT ERUs AAUs
1. Vacha Cascade JI Project 1 140 000 -
2. Industrial energy efficiency and co-generation, Nikopol 553 091 203 208
3. Reduction of greenhouse gas by gasification of the towns Veliko Turnovo, Gorna Oryahovitsa and Lyaskovets 319 294 -
4. Reduction of greenhouse gas by gasification of the municipality of Sofia 732 133 -
5. Biomass and Energy Efficiency Project, Paper Factory Stambolijski 530 688 126 705
6. Co-generation power station Biovet 339 000 200 000
7. Plovdiv South co-generation project 698 941 242 615
6Approved JI Projects, cont.
PROJECT ERUs AAUs
8. Biomass Utilization in Svilosa AD 586 000 311 293
9. Rehabilitation of district heating system in Toplofikatsia Sofia EAD and Toplofikatsia Pernik ?AD 911 469 628 247
10. Agroplychim N2O reduction 2 015 000 1 369 000
11. Reduction of greenhouse gas by gasification in Varna municipality 300 000 49 046
12. Co-generation gas power stations AKB Fores PLC Financial Industrial Group 811 000 193 000
Total 10 629 707 3 323 114
7Plans concerning JI in Bulgaria
EU ETS is limiting the scope for JI to a great
extend Still! 13 new project ideas are
endorsed What is left? Mainly projects outside
of the Scheme and non-CO2 projects Besides
indirect double counting limits the renewables
8Plans concerning JI in Bulgaria, cont.
A6SC decisions are important Additionality is
crucial Track 2 high transaction cost
9Planned activities to meet the eligibility
requirements for JI Track I
Submitted annually a greenhouse gas inventory
report (currently for 2004, missing for 1989
next year)
Assigned Amount Units will be calculated and
submitted in 2006
National system for the evaluation of GHG
emissions 2006 (responsible body ExEA)
National registry project initiated
(DEPA) Deadline end of 2006
Supplementary information on the assigned amount
- 2006
10Host Country view on JI Track I
JI Track I GIS hard greening Standardised
baselines - lack of financing Local validators
accredited by the Bulgarian accreditation agency,
possibly EUETS validators Additionality
simplified, environmental additionality National
guidelines to be developed on the basis of the
existing guidelines for Track II
11Draft Plan of action for moving the existing
Bulgarian JI projects to Track 1
- Declaration by the Bulgarian government
- the project will generate the amount of ERUs and
possible AAUs as stated in the PDD - the project is additional
- agrees with the methodology used
- Contacting the Suppliers workshop
- Control on whether the actions undertaken for
Track 1 are consistent with the (possible)
requirements of the JI Supervisory Committee - Transfer of ERUs upon receipt of verification
reports
12Linking the JI projects to EU ETS
- Direct double counting cancel allowances from
concrete installations - Indirect double counting deduct allowances from
electricity sector (for heating from concrete
installations)
13Making JI projects possible
- Set aside
- 1. Renewables - from electricity sector
- 2. Others - from electricity sector
- 3. Early credits from National registry
14Ivona Grozeva Head of JI Sector Phone (359 2)
940 6101 Fax (359 2) 981 6610 E-mail
ji_grozeva_at_moew.government.bg Web site
www.moew.government.bg