AutoProme Automating Projects With Metrics - PowerPoint PPT Presentation

1 / 47
About This Presentation
Title:

AutoProme Automating Projects With Metrics

Description:

Ticket history tracking. Complete HR automation (w.r.t. project) Balanced Score Card automation ... Hong Kong), NCR (Thailand), DHL, Bosch (Malaysia), PCCW, IBM, ... – PowerPoint PPT presentation

Number of Views:214
Avg rating:3.0/5.0
Slides: 48
Provided by: concept4
Category:

less

Transcript and Presenter's Notes

Title: AutoProme Automating Projects With Metrics


1
AutoPromeAutomating Projects With Metrics
  • Presentation

2
Agenda
  • Salient Features of Tool
  • Savings Benefits
  • Road Map and Support
  • Tool Demo

3
Features of tool
  • Automate
  • Management of projects with metrics
  • Customizable Timesheet
  • Facilitate implementation of Quality models ISO,
    CMM, CMMI, Six Sigma
  • Powerful communication to all levels

4
Management of projects
  • Manage Process parameters
  • Manage Quality parameters
  • Manage Risks, Issues, Changes, Resources
    Utilization
  • Automatic QPM with control limits / thresholds /
    goals

5
Process Parameters
  • Development projects Size, Cost, Effort,
    Schedule, Review / Testing, Bugs, Changes
  • Maintenance projects Bug trends, MC, Average
    TAT, SLA adherence
  • With Built in automatic QPM

6
Process Parameters
  • Development

7
Schedule - Estimation
8
Schedule - Gantt Chart
9
Schedule Status report
10
Effort Status report
11
Schedule Control Chart
12
Effort Control Chart
13
Size Functional Point model
14
Peer Review Inspection
15
Peer Review Actual
16
Defects Status report
17
Defects Pareto Analysis
18
Change Management Impact analysis
19
Process Parameters
  • Maintenance

20
Ticket trends
21
FTR Maintenance Capability
22
Avg. TAT SLA
23
Quality Parameters
  • Development projects Product Quality, In-process
    Defects, COQ, COPQ, PRD, defects from review /
    testing
  • Maintenance projects First Time Pass, rework
  • With Built in automatic QPM

24
On-line Dashboards
  • Development projects
  • Cumulative milestones
  • Earned Value Chart
  • Quality status
  • Overall health
  • Effort variance, Schedule Variance
  • PCE (defect leakage)
  • Resource Utilization
  • Bulls Eye

25
Development Dashboard snapshot
26
On-line Dashboards
  • Maintenance projects
  • AET / SLA Breaches report
  • Tickets Trends
  • Quality status FTP / FTR
  • Overall health
  • SLA Adherence
  • Resources Utilization
  • Average FTR

27
Maintenance Dashboard snapshot
28
Process management
  • Organization level
  • Base-line data management
  • Development
  • Maintenance projects
  • Baseline trend analysis
  • Project Level
  • Goal setting
  • Automatic measurement repository
  • Automatic Level 4 compliant QPM

29
Baseline Trend Analysis chart
30
Timesheet Metrics
  • Timesheets Planned and Unplanned
  • Resource Effort utilization
  • Auditing reports
  • RTM
  • Module Status Reports

31
Planned Timesheet
32
Unplanned Timesheet
33
Timesheet Report
34
Resource Loading
35
Effort Utilization
36
Cycle-wise NCs Chart
37
Process Area wise NCs chart
38
Requirements Traceability Matrix
39
On-line communication and dedicated dashboards
  • CEO
  • Division Head
  • Project Managers
  • Module Leaders
  • Team members
  • With built in Security Controls

40
What is different?
  • Development and maintenance projects
  • Bug management metrics with QPM
  • Pareto analysis
  • Peer review and test automation
  • Stringent process compliance requirements
  • Web based and Usage from any where

41
Savings to Project Organization
  • One time data entry
  • No need to maintain records
  • Risk management
  • Issue management
  • Decision analysis
  • Peer review / testing
  • Estimation
  • Status reports
  • Metrics sheets
  • SQA
  • Causal Analysis
  • Expected savings about 20 project time

42
The results from AutoProme customers indicate the
following benefits
  • 20-30 savings on project managers time in 2-3
    months
  • 35-55 savings on senior management time for
    review of projects
  • 60-85 savings on Quality and Process group
    members time for performing audits, internal  
    assessments, metrics collection, and metrics
    analysis
  • Overall savings of 20-30 of Cost of quality

43
Future Upgrades (next 3 months)
  • Incorporation of estimation models
  • Workflow automation
  • Automation of skill matrix, resources assignment
    across
  • Ticket history tracking
  • Complete HR automation (w.r.t. project)
  • Balanced Score Card automation
  • Top 20 Six sigma analysis
  • Process Assets Library through a mouse click

44
Maintenance and support
  • Full dedicated team for this project
  • 6 Months warranty on application
  • Dedicated user training and manual for ease of
    operation
  • Customization to suit customer environment

45
Our Clients
  • Capgemini (India)
  • INTEL (India Bangalore)
  • Nihilent Technologies
  • LANCO Global Systems
  • Medha Drives
  • Prodapt
  • ECC International (Singapore)
  • To name a few

46
Product Architect Satish Tumu
  • Mr. Tumu Satish Kumar - an SEI Authorized
    CBA-IPI Lead Assessor and SEI Authorized SCAMPI
    Lead Appraiser with experience of working with
    more than 80 major corporates across the globe
    including many Fortune 500 companies.
  • Some of his clients include
  • Deloitte Consulting (India, USA, Canada, Spain),
    Accenture (India, Philippines), ADP group of
    companies, NCS, SCS, Statech, Crimson (all in
    Singapore), ZTE, Toone, Alcatel (all in China),
    PCCW, HK Telecom, Ageus (all in Hong Kong), NCR
    (Thailand), DHL, Bosch (Malaysia), PCCW, IBM,
    Infotech, GAVS, CAP GEMINI (India).

47
Thank you!
Write a Comment
User Comments (0)
About PowerShow.com