POPs - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

POPs

Description:

Regionally-based Assessment of Persistent Toxic Substances ... exposure to DDT and strengthening of malaria control - Executed by WHO/AFRO and ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 12
Provided by: Jim4202
Category:
Tags: afro | pops

less

Transcript and Presenter's Notes

Title: POPs


1
POPs UNEP and the GEF
  • Jim Willis, Director
  • UNEP Chemicals

2
Over 140 countries participate in UNEP GEF
Project Activities
Project Jurisdiction of Activities Single
country 103 Regional 78 Multi-country
20 Global 31 Total 232
3
UNEP/GEF POPs and PTS Projects (1)
  • Regionally-based Assessment of Persistent Toxic
    Substances
  • Development of NIPs for POPs 12-country pilot
    project
  • Support for Implementation of the Stockholm
    Convention (Medium size project)
  • Persistent toxic substances, food security, and
    Indigenous Peoples in Arctic Russia (Medium size
    project)
  • Demonstration of alternatives to DDT in Mexico
    and Central America (PDF-B)
  • Reducing pesticides runoff to the Caribbean Sea
    (Colombia, Costa Rica, Nicaragua) (PDF-B)

4
UNEP/GEF POPs and PTS Projects (2)
  • Reduction of exposure to DDT and strengthening of
    malaria control - Executed by WHO/AFRO and
    Ministries of Health in Eritrea, Ethiopia,
    Madagascar, Namibia, South Africa, and Swaziland
    (PDF-B)
  • Support to local communities for the reduction of
    pesticides use in the Niger and Senegal River
    basins through Integrated Pest and Production
    Management - Executed by FAO/Global IPM Facility
    in Benin, Guinea, Mali, Mauritania, Niger and
    Senegal (PDF-B)

5
Some Considerations
  • The NIP is your plan for implementing the
    convention make sure that the plan is designed
    to meet your needs.
  • Different approaches in developing the plan
  • Large external consultant component
  • Country-driven
  • EAs get a flat fee of 50,000 not included in
    the project budget.
  • Budgets are country-specific 500,000 is not
    automatic.
  • Different EAs have different strengths and
    weaknesses. Compare offers of assistance
    carefully.
  • Partnerships are possible, but should be
    specified in your proposal.

6
Why Consider UNEP? (1)
  • UNEP is the secretariat of the Stockholm
    Convention and is designated by the Convention to
    assist parties.  
  • With UNEP supporting its NIP, the entire amount
    of GEF funding goes to that country.
  • UNEP has more than 6 million USD, in addition to
    what is available through the GEF, for projects
    and workshops in countries that develop their
    implementation plans with UNEPs support.

7
Why Consider UNEP? (2)
  • UNEP has extensive experience in all of the
    twelve POPs listed in the Stockholm Convention
    an active POPs programme since 1995.
  • Governments selected UNEP to convene and support
    the negotiations of the Convention on the basis
    of its policy and technical competence on POPs.
  • UNEP seconded a staff member to write the
    Initial guidelines for enabling activities for
    the POPs Convention and is the agency most
    familiar with its requirements.

8
Why Consider UNEP? (3)
  • UNEP is preparing the detailed guidelines for
    developing NIPs.
  • UNEP is preparing a CD with all POPs relevant
    documentation to support NIPs preparation
  • UNEP has developed all of the currently available
    UN guidelines and guidance materials specific to
    POPs.
  • UNEP has 40 staff members ready to provide
    immediate assistance to countries on NIPs.
  • UNEP has financed and provided technical support
    for over 60 national projects in developing
    countries and countries with economies in
    transition on the major issues addressed by the
    Stockholm Convention.

9
Why Consider UNEP? (4)
  • Since 1995, UNEP has held over 100 regional,
    sub-regional and national workshops addressing
    POPs and the priority issues that are reflected
    in the Stockholm Convention.
  • UNEP implements 20-30 regional and sub-regional
    workshops each year on the Stockholm Convention.
    These address the key issues of implementation,
    including PCB and dioxin/furan inventories and
    action plans, and selecting alternatives to POPs
    pesticides. Where possible, these will be held
    in countries selecting UNEP to support their NIP
    in order to strengthen the plan development
    process and to build synergies.

10
Why Consider UNEP? (5)
  • UNEP has extensive experience in implementing GEF
    projects. UNEP is a founding member of the GEF,
    and has been an Implementing Agency since the
    GEFs inception in 1991.
  • UNEP was the first agency with POPs projects
    approved by the GEF.
  • UNEPs underlying interest is to ensure that each
    country has the ability to fulfil its obligations
    under the Stockholm Convention and thereby to
    protect health and the environment from POPs.
    UNEPs approach is designed to ensure that
    projects are country-driven, country-led and
    country-implemented.

11
Follow-up
  • UNEP would be pleased to arrange follow-up
    consultations with countries to
  • Provide in depth briefings on the Convention and
    its requirements
  • Develop proposals for NIPs for GEF funding
  • Design other needed actions (e.g., workshops or
    projects) for chemical safety
  • Can take place at UNEP or in your country
Write a Comment
User Comments (0)
About PowerShow.com