Urban ITS Applications in NW Region - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Urban ITS Applications in NW Region

Description:

Urban ITS Applications in NW Region – PowerPoint PPT presentation

Number of Views:16
Avg rating:3.0/5.0
Slides: 17
Provided by: cove
Category:

less

Transcript and Presenter's Notes

Title: Urban ITS Applications in NW Region


1
Urban ITS Applications in NW Region
  • Dean Gustafson, PE, PTOE, Regional Operations
    Director
  • Northwestern Region

2
Agenda
  • Enhance Operations in Charlottesville
  • Vision of the future
  • City of Charlottesville ITS Center
  • Add Traffic Cameras and CMS
  • Focus on traffic signals
  • Improve condition, operate and way we build
  • Partnerships with Charlottesville, Winchester
  • Integrate Arterial/Freeway Mgt Systems

3
Enhance Operations in CVille
4
Future Vision
5
City of Charlottesville ITS Center
  • Signal System
  • Transcore
  • 70 signals
  • Traffic Cameras
  • Resource Shared Fiber Optics
  • Shared with media
  • AVL on Public Works vehicles
  • Snow Removal
  • Asset Management
  • Part-time Operation

6
Traffic Cameras and CMS
  • 14 Traffic Cameras
  • I-64
  • Exit 107, Exit 114,
  • Exit 118, Exit 120,
  • Exit 121, Exit 124,
  • Exit 136
  • US 29
  • Fontaine, Ivy,
  • Barracks Rd, Hydraulic,
  • Rio, Airport/Profit
  • US 33
  • US 250
  • Rte 20/Rivanna R.
  • 12 CMS
  • Similar to above
  • Use PCMS now

7
Year of the Signal (was)
  • Improve way we build
  • Consultant Design
  • Hired Lead Inspector
  • Handle on land development
  • Improve Condition
  • Reorganized Signal Maintenance
  • Prev. Maintenance every year
  • Upgrade controllers in CVille area
  • Begin Life Cycle Replacement Program
  • Improve (or begin) Signal Operations
  • Hired Signal Optimization Engineer
  • Develop long-range plan (2-3 year retiming cycle)
  • Use consultant support
  • Partner with localities

8
56
11
10
Number of Signals
14
Winch. 93
2
33
CVille 76
4
38
Staunton 86
0
0
9
8
0
64
6
Current Structure
9
Traffic Signal Maintenance
10
State Forces
  • - Inside Cabinet Preventive Maintenance (PMs)
  • Contract Monitoring of Signal Maint. Contract
  • Emergency Response
  • Primary function
  • On-call at night/weekends
  • Mobile based response
  • Reduced response times

11
Maintenance Contract
  • - Outside Cabinet Preventive Maintenance
  • - Mast arm, signal heads, cameras, loops
  • - Planned Corrective Work
  • Small corrective items (cameras, wiring, heads,
    pre-emption, conduit, junction boxes,
    cabinet/flasher foundations)
  • Unit pricing and Task Order based
  • - Performance Based contract

12
Average Calls by Hour of Day(Jan-Jun 2007)
13
Why are we doing this?
  • Improve emergency response to signal problems
  • Response time impacts traffic flow and motorist
    safety
  • Reduce time law enforcement needed for traffic
    control
  • Improve condition of signals
  • Reduce number of signal problems, improve
    reliability
  • Extend asset life
  • Begin planning for life cycle replacement
  • Maintain core competency
  • Troubleshooting and emergency response
  • Inside cabinet equipment

14
Partnerships with Cities
  • City of Winchester
  • Used signal consultant (SWA/WRA) for timing
    improvements on border corridors
  • Route 7 5 minute reduction, 75 less stops
  • Route 50 East 40 sec reduction, 28 less stops
  • Route 50 West 1 min reduction, 70 less stops
  • Route 11 South 45 sec reduction, 50 less stops
  • Multi-year plan to replace signals/controllers
  • City of Charlottesville
  • Coordination on Rte 250 signal improvements
  • Future Vision

15
Integration Arterial/Freeway Systems
  • GOAL
  • Develop a signal control system within Region
  • Integrate Arterial Management into Freeway Mgt
    System
  • RESULT Improved reliability, improve traffic
    flow, fewer intersection crashes
  • Phased Approach
  • Re-design TMC Network to house existing signal
    software (Marc NX)
  • Upgrade remote communications to/between signals
  • Traffic Signal software acquisition
  • Integrate Arterial/Freeway Mgt Systems

16
SYSTEM OPERATIONS
  • Monitor System/Detect Problem
  • VSP CAD, Albemarle CAD, Cameras,
  • Safety Service Patrol, RWIS, Afton Mtn Fog
  • Travel Time System
  • Verify Incident/Conditions
  • Trooper/officer on-scene, VDOT on-scene,
  • Cameras, SSP, Residency personnel
  • Respond to Incident/Problem
  • Dispatch Residency, SSP, VOIS
  • Change Signal Timing remotely
  • Inform Motorists
  • Pre-Trip internet (511-Web and VDOT)
  • En-route CMS, HAR and 511-Phone
Write a Comment
User Comments (0)
About PowerShow.com