Title: CPDLC in Air Europa
1CPDLC in Air Europa
- Link 2000 Workshop
- Brussels
- 15-16 February 2005
2Agenda
- Brief overview of our company.
- Reasons to become a Link2000 Pioneer Airline.
- Our commitment with Link2000.
- Initial steps. Activities carried out. Equipment
Planning. - Certification First CPDLC trials.
- Next steps.
- Data link messages.
3Brief overview of our Company...
- Founded in 1986
- Headquarters in Palma de Mallorca
- Current fleet 32 aircraft
- Type of Operation 80 scheduled 20 charter
(approx.) - Routes Domestic, European and Transoceanic
destinations - Code-share agreements with Aeropostal, Air
France, Air Luxor, Alitalia, Continental, KLM,
Malev, Southern Winds, Tunisair and Cubana. - Direct Staff 2.580 employees
- Flight Hours 124.363
- Total Pax 7.654.238
- Nº Flights 58.253 (Year 2004)
4Current Fleet of Air Europa
B737-400 2 units B737-800 25 units
B767-300 5 units
Total 32 aircraft
5Reasons to become a Pioneer Airline
Cost Benefit Analysis
Jan04 Air Europa becomes Link2000 Pioneer
Airline
6Our commitment with Link2000 Programme
- Equipment for 19 aircraft
- At least 10 A/C by the end of 2005 and
- Another 9 A/C by the end of 2006.
- Certification and start of operations at
Maastricht UAC on or before Mar05.
7Initial Steps
- Internal working group to handle all data link
activities. - Preparation of a potential calendar for aircraft
equipment. - Contacts with Communications Service Providers.
- Contacts with Avionics Manufacturers.
- Informative meetings with the Spanish DGAC and
AENA. - Change of Common Display System for all
B737-800s.
8Common Display System PFD/ND configuration
9HMI requirement dot ATC
10Activities carried out
- Deliveries of 4 new B737-800 from Boeing
(Oct-Nov04). - Certification of the first aircraft (22-Sep-04)
- Decisions taken
- Communications Service Provider SITA
- Avionics Provider Rockwell Collins to forward
fit new B737-800 and retrofit of existing
aircraft. - Preparation of ground systems to accommodate new
Data Link system. Interfaces with existing
systems. - Training Course for flight crews due to the new
PFD/ND configuration, including flight simulator
and familiarisation flights.
11VDL2/ATN equipment planning
- 2004 4 new B737-800 (forward fit). In service ?
- 2005 4 new B737-800 (forward fit)
- 6 existing B737-800 (retrofit)
- 2006 5 new B737-800 (forward fit)
- 2007-2009 4 new B737-800 (forward fit)
- 2010 delivery of 10 new Airbus 350 (with
FANS-B)
12Certification EC-JAP first Boeing aircraft VDL
M2 forward fitted Date of Certification 21
September 2004
13First CPDLC Trials
- Delivery Flights
- EC-JAP 5 October
- EC-JBJ 4 November
- Route Seattle Boeing Field - Gander/Goose Bay -
Palma
- EC-JBK 18 November
- EC-JBL 24 November
14Next steps
- Carry out more CPDLC trials with Eurocontrol.
- Achieve the operational approval from the Spanish
DGAC - Revision of Ops Manual introducing CPDLC
procedures - Training programme for flight crews about CPDLC.
- Start CPDLC operations with Maastricht (March05).
15AOC messages
- AOC messages add new capabilities.
- Change of company procedures.
- Operational improvements with the use of AOC
messages.
16CPDLC messages examples (I)
Video 1
17CPDLC messages examples (II)
Video 2
18Comments from Flight Crews ... ... after CPDLC
experiences
- Very good response after the CPDLC trials.
- Increased use of the data link system for AOC
applications. - In general, good attitude towards the system.
- Wishing to fly over MUAC as soon as possible to
carry out CPDLC.
19Thank you Air Europa Centro Empresarial
Gobalia. Llucmajor 07620. Balearic Islands.
Spain T 34 971 178133 F 34 971 178097 E
jrossello_at_air-europa.com