Title: ICESat Ground System Element: NSIDC DAAC
1ICESat Ground System ElementNSIDC DAAC
Melinda Marquis Mission Operations Working Group
Meeting January 30, 2002
2Overview
- System Architecture Distribution of Data by ECS
- Current Status and Plans to meet Launch Readiness
(Jan. 17, 03) - Milestones completed
- Future Milestones
- Testing
- Ingest of data
- Metadata
- EDG (EOS Data Gateway)
- Documentation
- DIFs
- Guide Documents
- Web Pages
- Documentation Operations Procedures
- Staffing and Training
- ECS
- Ops
- IT Security
- rSCF at NSIDC
- Schedules
3System Architecture Distribution of Data by ECS
Data Management Subsystem
Data Server Subsystem
Science Data Server Database
EOS Data Gateway (EDG)
Search and Order
Data Archive (Powderhorn)
Granules Distributed
User
4Milestones
5Testing
- Mission Operations Science System (MOSS) Test 5
Data Types Ingested from ISIPS Yet to be
tested GLA03, 16 ANCILLARY FILES GLA ANC08
GLA ANC09 GLA ANC24 GLA ANC25 GLA ANC20
GLA01, 02, 04-15
GLA ANC22 GLA ANC 33 GLA ANC 34 GLA ANC 37
GLA ANC 39
6MOSS 5 Test Results L0 Data Ingested from EDOS
Data Types Ingested Ingested PDS PDR
GLA0CHT5 (50) 10 13
10 GLA0SST1 (24) 8
13 8 GLA0LST1 (25) 11
13 11 GLA0LST2 (55)
21 23 21 GLA0DATA
(32) 9 13 10
GLA0CTDP (33) GLA0MDP1 (27)
GLA0MDP2 (28) GLA0EVNT (34)
GLA0MEM (35) GLA0TBLE (36)
GLA0ETAL (37) GLA0DTYP (28)
GLA0BORE (29) GLA0PRAP (1984)
10 12 10 GLA0GPS
(1088) 11 12 11
Data Types Ingested Ingested PDS PDR
GLA0ADDL (12) 11 13 11
GLA0ADDS (13) 11 13 11
GLA0ADEM (14) 9 13 9
GLA0PCSP (15) 11 13
11 GLA0PCEP (16) 12 13
12 GLA0CDSP (17) 12 13
12 GLA0CDEP (18) 13 13
13 GLA0ASP (19) 7 13
7 GLA0LPDP (26) 11 13
11 GLA0CHP (49) 11
13 11 GLA0CHT1 (20)
12 13 12 GLA0CHT2 (21)
11 13 11 GLAOCHT3 (22)
8 13 8 GLA0CHT4 (23)
10 13 10 GLA0CODE (31)
7Testing Metadata
Status of Earth Science Descriptor Files
(ESDTs) Have Received and Tested Metadata
for GLA00-15 ANC08, 09, 20, 22, 24, 25, 33, 34,
37
Have Not Received Metadata for GLA ANC39
8Testing EDG
- New 3.4 beta version of EDG will be tested during
MOSS 6. - Test NOSE granule map display.
9Future Tests (All with firewall installed)
MOSS 6 Week of Jan. 28, 02 MOSS 7 Week of
Feb. 25, 02 IGST 6.4 March, 02 IGST 4 April,
02 IGST 6.5 July, 02 IGST 7s Mid May
late Oct., 02
10Documentation
- DIFs (metadata documents submitted to GCMD)
- One for each of the 17 products (L0-L3)
- Completed and reviewed by D. Hancock and A.
Brenner - Keywords yet to be finalized for ESDTs, DIFs, and
Guide Doc keywords (valids)
11Documentation
- Guide Documents
- One guide document for all altimetry products
GLA01, GLA05, GLA06, GLA12-15 - First draft completed and reviewed by D. Hancock
and A. Brenner - One guide document for all atmospheric products
GLA02, GLA07-11 - First draft completed
- Will transfer both to new template that
emphasizes procedures for working with data - Next draft available by end of Feb. for review
12Documentation
Guide Documents
- One guide document for GLA16 (the composite
product in HDF-EOS format) - Product not yet fully defined
- Once GLA16 is defined, well draft guide document
and have it reviewed by GLAS scientists.
13Documentation Schedule
- Second drafts of altimetry and atmospheric guide
documents - completed by end of Feb., and will be provided to
GLAS - scientists for review
- Need details of parameters from D. Hancock NLT
Aug. 15, - for final versions
- In-house review of altimetry and atmospheric
guide documents - and final review of 17 DIFs will begin Aug. 1 and
end Sept. 30 - GLAS scientists final review Oct. 1-15.
14Documentation
- Web Site
- GLAS Data Products at NSIDC
- http//nsidc.org/daac/glas/
- Mission overview
- Description of Products
- Description of Instrument
- FAQs
- Links to Related Sites
15Documentation Operations Procedures
We are using 611 procedures as basis, with
NSIDC-specific modifications in some but not all
cases All procedures will be documented on the
internal NSIDC ECS website by 6/02
16Staffing GLAS Product Team at NSIDC
17Staffing and Training
- ECS
- ECS version 6A.05
- Training (Week of Jan. 21, 02)
- Installed (Feb., 02)
18Staffing and Training
19IT Security Audit Results
- ESDIS Security Audit (Oct., 02)
- NSIDC received excellent score
- Vulnerability rating of 0.06
- 0.25 is acceptable the lower the score, the
better - Only 1 DAAC received score better than NSIDCs
- Vulnerability ratio high vulnerability
- Total of
systems - NSIDC 4
- 70
20IT Security Improvements After Audit
- Audit performed in Oct. 2001
- By Jan. 8, 2 of 4 vulnerabilities eradicated
- Now, vulnerability rating is 2/70 0.03
- Working to address remaining 2 vulnerabilities
21It Security Audit Results
8
Unacceptable
0.25, acceptable
-- At time of Audit, Oct. 01
0.06, Excellent NSIDC
22IT Security
- Excerpts from audit, by Titan Systems Corp.
- I also want to compliment you on your scanning
procedure that you have implemented, such efforts
makes sic our job easier and allows us to focus
our time on sites that need it. - You are setting a great example for other DAACs
to follow and proves sic that a DAAC can
operate in a secure fashion. - Ronald W. McClellan, Principal INFOSEC Engineer
23IT Security Firewall
UCB Campus Public Internet
ECS Router
MO Network
24IT Security
- Documents baselined
- NSIDC DAAC Information Technology (IT) Major
Application System Security Plan (Dec., 00) - NSIDC DAAC Information Technology (IT) Risk
Management Plan (Dec., 00) - NSIDC DAAC Information Technology (IT)
Contingency Plan (Dec., 00)
25IT Security Other Security Measures taken at
NSIDC
- Daily Monitoring of network security logs
- All relevant systems have TCPwrappers installed
- Tripwire installed
- SSH Secure Shell in use in lieu of telnet
- Install patches to OS and other COTS packages, as
needed - Support ESDIS audits every 6 months
26rSCF at NSIDC
- Procurement completed
- Delivery and installation of system H/W S/W in
early Feb., 02 - Install SCF interface S/W for rSCF mid to late
Feb., 02 - (Will be contacting John DiMarzio.)
- Install SCF visualization S/W
- Begin test and operator training March, 02
27Schedules
28Risk Areas and Mitigating Factors
29Any other issues that may impact mission readiness
No known issues
30Technical Issues and Concerns
- No known technical issues or concerns
31BACKUP SLIDES FOLLOW
32GLAS Data Products
33Comprehensive Documenation Status
- NSIDC ECS I-SIPS ICD Baselined in Dec. 01
- NSIDC ECS I-SIPS Volume 0 Baselined Dec. 23,
98 (Revision E released Nov. 14, 01.) -
- NSIDC Operations Agreement NSIDC-ISIPS
Completed. Hancock et al. will sign when Marquis
is at GSFC for MOWG Jan. 30, 02 -
- NSIDC Operations Agreement NSIDC-EDOS I've
asked Bob Lutz to confirm that a separate OA
between NSIDC and EDOS for ICESat/GLAS data is
not needed. He has agreed, but wants to confirm
this with someone else. Such an additional OA
seems unnecessary, in light of the appendix in
the EGS-EDOS ICD. Also, there is an OA between
EDOS and the ECS SDPS (510-OA-EDOS/SDPS). - NSIDC Operations Procedures Document Most of
the components are complete now. Others will be
complete by Feb. 15. All procedures will be
documented on an internal NSIDC ECS web site by
June. A PowerPoint Slide that we used for the
Aqua Interim ORR Jan. 9 gives more details. - NSIDC Data Set Guide Documents The altimetry
guide document was drafted and reviewed by
Hancock and Brenner in May, 01 and July 01,
respectively. The atmospheric products guide
document has been drafted by not yet reviewed by
GLAS scientists. Both of these guide documents
will be further edited and sent to GLAS
scientists for another review by Feb. 28, 02.
David Hancock is still changing some of the
product parameters, and we will need these nailed
down no later than Aug. 15. In-house (NSIDC)
review of altimetry and atmospheric guide
documents will begin Aug. 1 and end Sept. 30.
GLAS scientists final review will be Oct. 1-15.
The GLA16 product (the composite product in
HDF-EOS format) is not yet defined. Once defined,
well draft guide document and have it reviewed
by GLAS scientists. -
- NSIDC Data Interchange Format Documents These
were drafted and reviewed by Hancock Feb. 01.
Final in-house review of these 17 DIFs (after
Hancock nails down final parameters) will be Aug.
1-Sept. 30, and final review by GLAS scientists
Oct. 1-15.
34GLAS Data Flow
35(No Transcript)
36(No Transcript)
37(No Transcript)