Title: Case Study International Exhibition and Convention Centre
1PROJECT SUCCESS STORY
BKC, Mumbai, India
This is the single largest building project in
India currently, the approximate area of this
building is 8.2 million sq. ft. Cost saving
Increasing time efficiency
2PROJECT
COMPLETED
STATUS
YEAR-2019
About the project
A mixed-use building with a convention center,
retail, theatre, offices, and service apartments
in the prime location of Mumbai
Input
2D AutoCAD Drawings for DD Level
Scope of work
Excelize has developed models for architectural,
structural, and service components starting with
the design model through construction and
as-built model
BIM model and actual site photo
LOD 300
Clashes Detection Resolution
Modeling for Architecture, Structure Services
www.excelize.com
3Challenges
Benefit to the client
Managing the sheer volume of data from drawing
files, revisions, RFIs, and builders
instructions was a herculean task We had to
update the model again and again due to the
design changes, which led to rework
Building Information Modelling (BIM) has been
instrumental in enhancing coordination among
various disciplines involved in construction
projects BIM enabled architects, engineers,
contractors, and other stakeholders to
collaborate more effectively throughout the
entire lifecycle of a building Clash detection
helped identify potential issues early in the
design phase, preventing costly rework during
construction
1
2
3
Output
Coordinated model
fig 2 - Coordinated model theatre side view
fig 1- Coordinated model retail side view
Our Services
BIM Consulting Scan to BIM Shop Drawings
Architectural BIM MEP coordination Landscape BIM
BIM training Model auditing BIM studio
www.excelize.com
420 years of BIM leadership
2500 projects
ISO 19650 Certified
100 companies prefer Excelize as BIM partner
3 global offices and capability centers
marketing_at_excelize.com www.excelize.com