Title: Commissioning Management and Validation Services
1 Why Commissioning Authority Should
Complete Commissioning C
Checklists
2- Instead of contactors, the completion of
commissioning documents should be done by the
commissioning authority (CxA) and for good
reason!Typically the commissioning management
services company is in direct contract with the
owner of the building and it acts as an
independent, 3rd-party representative who ensures
that the entire commissioning phase is completely
unbiased and follows best practices while working
towards achieving the project requirements of the
owner. - The commissioning authority bears the
responsibility to assist the project team during
construction, acceptance and design phases, which
ensures that the project achieves success, but
without being dependent on the construction and
design teams, so as to maintain objectivity.
- The commissioning process needs the commissioning
authority to develop testing procedures, data
forms and checklists, and record performance
criteria. - In general, these materials are handed over by
the commissioning authority to members of the
project team. The materials are further passed on
to sub-contractors and then their installation
contractors complete and return the documentation
for review.
www.global-cxm.com
3Surely, Not an Unbiased Approach to
Commissioning!
- This make things complicated for the
commissioning authority who may then have to
approach various members of the project team for
different kinds of documents that need to be
reviewed and confirmed by the commissioning
authority. - It is important to ensure that contractors should
not complete the commissioning documentation,
such as pre-functional checklists (PFC)
obviously, because theyre not the independent
commissioning authority. - If contractors take the responsibility to
complete commissioning documentation, the
building owner will not reap any benefits from
the true value of commissioning. - When the commissioning authority are responsible
for completing commissioning documentation, they
are required to completely understand equipment
specifications and choice, design details,
installation requirements from the manufacturers,
identify any access limitations in future, and
describe their findings in a crisp and clear
fashion. - Also, during commissioning coordination meetings,
this documentation needs to be provided to the
project team for review.
www.global-cxm.com
4Appropriate Role of Contractors in the
Commissioning Process
- Contactors should give the required equipment and
initial documents to the commissioning management
services agency. - They should also ensure their availability during
PFC site visits and make the required repairs, if
the installation of equipment is not in line with
the design requirements, while meeting their
general contract obligations. - When the commissioning authority works on PFC
documentation, issues can be identified and fixed
quickly, documentation offers more detail and the
project team can go into the acceptance phase
confidently with unbiased quality control offered
by a good global commissioning authority.
www.global-cxm.com
5Completing Commissioning Documentation Is No Mean
Feat
- Completing commissioning documentation needs an
exhaustive database of mechanical equipment,
including air handlers, boilers, expansion tanks,
cooling towers, and every imaginable piece of MEP
equipment within a commercial setting. - For every equipment piece, the commissioning
authority requires to place the nameplate(s) to
verify manufacturers data accurately. This piece
of information shows that the equipment conforms
to the authorised equipment submission and could
be used in the equipment inventory database of
the owner. - Once the equipment is installed completely, the
commission management services firm requires to
return and check if the installation is in line
with the design requirements. - Reputed global commissioning firms make use of
design details from contract drawings and follow
best installation practices for every piece of
equipment. - These may include verifying if the equipment has
isolation valves for servicing, disconnects are
accessible and labelled, all pipe fittings are
supported properly, piping supports coil changes
and protective shrouds are installed. The list is
exhaustive for every kind of equipment and such
levels of details are also needed in functional
testing documentation.
www.global-cxm.com
6Completing Commissioning Documentation Is a
Time-Intensive, All-Inclusive Process Even for
the Commissioning Team!
Imagine how difficult it would be for the
contractor to get time to document precisely
every piece of equipment when they too have their
own responsibilities with respect to the project
they are involved in. Accuracy, efficiency,
comprehensive verification and unbiased view are
to name a few of the reasons why reputable
commissioning management services stress on
completing commissioning documentation.
Contractors are made fully aware of their tasks
and responsibilities. Installers know that they
have the time to concentrate on their work and
building owners have the reassurance that their
project is being commissioned by a dedicated team
of experienced professionals.