3E’s Approach to Business Process Management Solutions - PowerPoint PPT Presentation

About This Presentation
Title:

3E’s Approach to Business Process Management Solutions

Description:

Our Business Process Management allows you to easily create workflows to improve the software development process. – PowerPoint PPT presentation

Number of Views:80

less

Transcript and Presenter's Notes

Title: 3E’s Approach to Business Process Management Solutions


1
3Es Approach toBusiness Process Management
Solutions
3E SOFTWARE SOLUTIONS 24, CMH Road, Indira Nagar
II Stage Bangalore, Karnataka 560038, India
91 9916 832 878 hello_at_3esofttech.com
2
1 Requirements Gathering
3
1.1 High-Level Business Requirements
  • 1.1.1 Current process/IT Environment
  • 1.1.2 Planned Process/IT Environment
  • 1.1.3 Metrics and Objectives
  • 1.1.4 Functional Gap Analysis
  • 1.1.5 Compliance Requirements

4
1.2 Elaborated Technical Requirements
  • 1.2.1 Integration Requirements
  • 1.2.2 Legacy Systems
  • 1.2.3 Human and System interfaces
  • 1.2.4 Existing Errors
  • 1.2.5 Data Compatibility and Data Conversion
  • 1.2.6 Deployment Requirements
  • 1.2.7 Interoperability
  • 1.2.8 Internal and External consumers
  • 1.2.9 Consumerization and BYOD requirements
  • 1.2.10 Social Media Integration
  • 1.2.11 Business Activity Monitoring
  • 1.2.12 Business Rules Management
  • 1.2.13Technical Gap Analysis
  • 1.2.14 Tools Evaluation

5
2 Design and Proof of Concept
6
2.1 Process Diagram for the new WORKFLOW/PROCESS
MANAGEMENT System
  • The step is about coming up with
  • - High-level business process diagram that
    outlines the business process flow with the
    Planned WORKFLOW/PROCESS MANAGEMENT System.
  • - High-level technical design for the Planned
    WORKFLOW/PROCESS MANAGEMENT System.

7
2.2 Prototype Development
  • If the Business Process is complex enough,
    development of a quick Prototype, with necessary
    Simulations, is carried out that helps in
    fine-grained analysis of the requirements and
    help identify any technical gaps that were not
    identified during requirements gathering.
  • If multiple tools (WORKFLOW/PROCESS
    MANAGEMENT/SOA) are used for the implementation,
    the integration of these tools is also tested
    during this Prototyping and Proof of Concept
    phase to analyze the end-to-end process.

8
3 Implementation
9
3.1 Prioritization
  • Prioritize the implementation tasks as per the
    Business and Technical significance and
    challenges.
  • For example, integrating a legacy database System
    could be technically challenging and implementing
    this first in the WORKFLOW/PROCESS MANAGEMENT
    System could benefit a lot compared to keeping
    this to the end.
  • Replacing the tasks that are currently done by
    Spreadsheets may fetch in a lot of value and
    fills a lot of gap with the SMART objectives that
    are desired to be achieved.

10
3.2 Functional Implementation
  • Implement the Functionality and develop a new
    WORKFLOW/PROCESS MANAGEMENT System that works
    end-to-end, with all Human and System actions
    supported.
  • This is done as per the priorities defined as
    above, and elaborating the requirements
    to-the-details for each outcome.

11
3.3 Implementing SMART Objectives
  • Once the Functional Implementation is in place,
    it is now about looking at the SMART objectives
    to see where we are and what else needs to be
    done.
  • Is the Database access speed enough to meet the
    desired level of Business Process efficiency? Is
    any fine-tuning needs to be done? Do we need to
    increase the size of the Database pool?
  • Are the service components on the Application
    Server scalable to the Business Requirements?
    What are the typical Load scenarios and how do we
    fine-tune?
  • If the Automatic notifications are now being sent
    to the Business user, is the notification
    frequency good enough? Do we need to increase
    this notification frequency to fit exactly into
    business objectives? Whats the optimal
    frequency?

12
4 Testing and Deployment
13
4.1 Development Testing
  • End-to-End testing is carried out in the Test
    environment.
  • GOAL Verifying and Validating the
    Functionality.
  • This is followed by a typical feedback and
    bug-fix cycle.

14
4.2 System Integration Testing (SIT)
  • Ensure End-to-End testing is done with all the
    business systems integrated.
  • GOAL Identify any integration and
    interoperability gaps.
  • Issues, if any, will be fixed and will be
    validated after a quick Development Testing.
  • Works with Business IT on any organization
    procedures to be followed for SIT.

15
4.3 Deployment User Acceptance Testing (UAT)
  • Production components will be replaced in steps
    to reduce the risk. It again goes with the level
    of change being implemented.
  • GOAL Identify any production deployment issues.
  • Works with Business IT on any organization
    procedures to be followed for SIT.
  • Identified Business Users/Analysts will perform
    the UAT.

16
5 Transition Documentation, Training, Support
17
5.1 Documentation
  • 5.1.1 Technical Documentation
  • Modelling and Architectural Diagrams
  • Technical Implementation Details
  • Information on handling modifications and
    extensions
  • 5.1.2 User Documentation
  • End-User material.
  • 5.1.3 Installation
  • Information on Deployment
  • Information on Configuration

18
5.2 Training
  • 5.2.1 General User Power User Training
  • To enable the Business team of the organization
    handle the business operations using the
    WORKFLOW/PROCESS MANAGEMENT solution deployed.
  • 5.2.2 Developer Training
  • To enable the IT team of the organization handle
    the WORKFLOW/PROCESS MANAGEMENT modifications and
    enhancements post Support phase.
  • 5.2.3 Trainer Training
  • Typically required for the big or multi-site
    organizations.
  • May take care of only User Training or Developer
    Training or both.

19
5.3 Support
  • Enables smooth transition of the WORKFLOW/PROCESS
    MANAGEMENT solution post deployment.
  • 3E team handles Technical Administration
    Operational modifications/enhancements.
  • On-Site and Off-Shore support is identified as
    needed and SLAs are defined wherever applicable.

20
Thank You
3E SOFTWARE SOLUTIONS 24, CMH Road, Indira Nagar
II Stage Bangalore, Karnataka 560038, India
91 9916 832 878 hello_at_3esofttech.com
Write a Comment
User Comments (0)
About PowerShow.com