Title: 3E’s Approach to Business Process Management Solutions
13Es Approach toBusiness Process Management
Solutions
3E SOFTWARE SOLUTIONS 24, CMH Road, Indira Nagar
II Stage Bangalore, Karnataka 560038, India
91 9916 832 878 hello_at_3esofttech.com
21 Requirements Gathering
31.1 High-Level Business Requirements
- 1.1.1 Current process/IT Environment
- 1.1.2 Planned Process/IT Environment
- 1.1.3 Metrics and Objectives
- 1.1.4 Functional Gap Analysis
- 1.1.5 Compliance Requirements
41.2 Elaborated Technical Requirements
- 1.2.1 Integration Requirements
- 1.2.2 Legacy Systems
- 1.2.3 Human and System interfaces
- 1.2.4 Existing Errors
- 1.2.5 Data Compatibility and Data Conversion
- 1.2.6 Deployment Requirements
- 1.2.7 Interoperability
- 1.2.8 Internal and External consumers
- 1.2.9 Consumerization and BYOD requirements
- 1.2.10 Social Media Integration
- 1.2.11 Business Activity Monitoring
- 1.2.12 Business Rules Management
- 1.2.13Technical Gap Analysis
- 1.2.14 Tools Evaluation
52 Design and Proof of Concept
62.1 Process Diagram for the new WORKFLOW/PROCESS
MANAGEMENT System
- The step is about coming up with
- - High-level business process diagram that
outlines the business process flow with the
Planned WORKFLOW/PROCESS MANAGEMENT System. - - High-level technical design for the Planned
WORKFLOW/PROCESS MANAGEMENT System.
72.2 Prototype Development
- If the Business Process is complex enough,
development of a quick Prototype, with necessary
Simulations, is carried out that helps in
fine-grained analysis of the requirements and
help identify any technical gaps that were not
identified during requirements gathering. - If multiple tools (WORKFLOW/PROCESS
MANAGEMENT/SOA) are used for the implementation,
the integration of these tools is also tested
during this Prototyping and Proof of Concept
phase to analyze the end-to-end process.
83 Implementation
93.1 Prioritization
- Prioritize the implementation tasks as per the
Business and Technical significance and
challenges. - For example, integrating a legacy database System
could be technically challenging and implementing
this first in the WORKFLOW/PROCESS MANAGEMENT
System could benefit a lot compared to keeping
this to the end. - Replacing the tasks that are currently done by
Spreadsheets may fetch in a lot of value and
fills a lot of gap with the SMART objectives that
are desired to be achieved.
103.2 Functional Implementation
- Implement the Functionality and develop a new
WORKFLOW/PROCESS MANAGEMENT System that works
end-to-end, with all Human and System actions
supported. - This is done as per the priorities defined as
above, and elaborating the requirements
to-the-details for each outcome.
113.3 Implementing SMART Objectives
- Once the Functional Implementation is in place,
it is now about looking at the SMART objectives
to see where we are and what else needs to be
done. - Is the Database access speed enough to meet the
desired level of Business Process efficiency? Is
any fine-tuning needs to be done? Do we need to
increase the size of the Database pool? - Are the service components on the Application
Server scalable to the Business Requirements?
What are the typical Load scenarios and how do we
fine-tune? - If the Automatic notifications are now being sent
to the Business user, is the notification
frequency good enough? Do we need to increase
this notification frequency to fit exactly into
business objectives? Whats the optimal
frequency?
124 Testing and Deployment
134.1 Development Testing
- End-to-End testing is carried out in the Test
environment. - GOAL Verifying and Validating the
Functionality. - This is followed by a typical feedback and
bug-fix cycle.
144.2 System Integration Testing (SIT)
- Ensure End-to-End testing is done with all the
business systems integrated. - GOAL Identify any integration and
interoperability gaps. - Issues, if any, will be fixed and will be
validated after a quick Development Testing. - Works with Business IT on any organization
procedures to be followed for SIT.
154.3 Deployment User Acceptance Testing (UAT)
- Production components will be replaced in steps
to reduce the risk. It again goes with the level
of change being implemented. - GOAL Identify any production deployment issues.
- Works with Business IT on any organization
procedures to be followed for SIT. - Identified Business Users/Analysts will perform
the UAT.
165 Transition Documentation, Training, Support
175.1 Documentation
- 5.1.1 Technical Documentation
- Modelling and Architectural Diagrams
- Technical Implementation Details
- Information on handling modifications and
extensions - 5.1.2 User Documentation
- End-User material.
- 5.1.3 Installation
- Information on Deployment
- Information on Configuration
185.2 Training
- 5.2.1 General User Power User Training
- To enable the Business team of the organization
handle the business operations using the
WORKFLOW/PROCESS MANAGEMENT solution deployed. - 5.2.2 Developer Training
- To enable the IT team of the organization handle
the WORKFLOW/PROCESS MANAGEMENT modifications and
enhancements post Support phase. - 5.2.3 Trainer Training
- Typically required for the big or multi-site
organizations. - May take care of only User Training or Developer
Training or both.
195.3 Support
- Enables smooth transition of the WORKFLOW/PROCESS
MANAGEMENT solution post deployment. - 3E team handles Technical Administration
Operational modifications/enhancements. - On-Site and Off-Shore support is identified as
needed and SLAs are defined wherever applicable.
20Thank You