Click here: A Vehicle Management System helps to register and keep information about all vehicles. A summary can also be generated from this system. Reports can be generated from the database records so that the vehicles can be tracked and budget can be seen. Accidental records can be summarized and response also can be given in this system. In addition, this system also provides additional information for each vehicle. This application is developed in CoreJava and MySQL. – PowerPoint PPT presentation

Number of Views:5528
Slides: 22
Provided by: wethecoders
Category:
Tags:

less

Transcript and Presenter's Notes

Title: Vehicle Management System


1
  • Welcome To Our Presentation

Topic VEHICLE MANAGEMENT SYSTEM
Contact us 91 9873725832
2
Overview
  • Project Requirements
  • Use case diagram
  • Project Objective
  • Project Scope
  • Task identify
  • PERT chart-Critical path analysis-Gantt chart
  • Project Budget

3
Requirements
  • Introduction
  • A Software requirements specification (SRS) is a
    comprehensive description of the intended
    purpose and environment for software under
    development.
  • SRS defines how an application will interact with
    system hardware, other programs human user in
    a wide variety of real world situations.
  • Functional Requirement
  • Non-Functional requirement

4
Functional Non-Functional Requirements
Functional Requirement

Programming Languages Java (jdk1.5).
Web Technologies Database Server
Html, JavaScript. My_sql Tomcat Apache 5.0
Non-functional Requirement

Processor duel core
Hard Disk 512 MB Ram 256 MB
5
Using Tools
The software used in this project is
? OS ? Data Base ?IDE ?Browser
Windows MS-SQL Server NetBeans Google Chrome
6
Features
  • ADMIN
  • View/Edit/Delete Vehicle Details
  • View/Edit/Delete Driver Details
  • Booking Status Detail
  • USER MODULE
  • Login/Registration of User
  • Take a Car trip (Google Map Integration)
  • View Car Details
  • Car Booking

7
Use case Table (Vehicle System)
Level 0 Level 1 Level 2 Actor
Account Sign in Sign out User Admin
Vehicle System Search Vehicle name Route name Bus stop User Admin
Report About System, route Request for Add vehicle User
Update Add vehicle Add route Add Bus stop Change Location Admin
8
Scope Objective For Project
  • To register and keep the information about all
    vehicles.
  • To build up a system that provides and generates
    the summary
  • Report from the database records in order to get
    the whole view about the vehicles amounts.
  • Summarize the accidental records and responds for
    the further improvements.
  • A web based tool where user can search for
    additional information of the vehicle.

9
Task Identity procedure
  • Requirement analysis

As we are doing this by ourselves not for a
organization or for a company. So we collect
requirement by ourselves by brainstorming and
questioning other people. Later we discus among
us and fixed our requirement.
10
Task Identity procedure
  • Database Design

11
Task Identity procedure
  • User Interface

12
Task Identity procedure
User Interface
13
Task Identity procedure
  • Quality Assurance
  • Unit Testing
  • Unit testing focuses verification effort on the
    smallest unit of software design that is the
    module.
  • Using procedural design description as a guide,
    important control paths are tested to uncover
    errors within the boundaries of the module. The
    unit test is normally white box testing oriented
    and the step can be conducted in parallel for
    multiple modules.
  • Integration Testing
  • Integration testing is a systematic technique for
    constructing the program structure, while
    conducting test to uncover errors associated with
    the interface. The objective is to take unit
    tested methods and build a program structure that
    has been dictated by design.

14
Task Identity procedure
  • System Testing
  • System testing is actually a series of different
    tests whose primary purpose is to fully exercise
    the computer-based system. Although each test has
    a different purpose, all work to verify that all
    system elements have been properly integrated to
    perform allocated functions.
  • Security Testing
  • Attempts to verify the protection mechanisms
    built into the system.
  • Performance Testing
  • This method is designed to test runtime
    performance of software within the context of an
    integrated system.

15
FPA
  • Matrix Used for EI
  • Matrix Used for EI

16
FPA
  • Matrix Used for EO and EQ

17
Pert chart
Activity Dependen cy Time Human
Requirme nt gather A _ 5 3
Desgin B A 3 2
Database C _ 8 4
Coding D A,C 6 3
Testing E B,C 4 3
Recovery F D 7 4
Release G E,F 5 2
B5,8
4
2
314,17
G21,26
1
6
7
521,26
D8,14
5
3
68,14
19
18
Critical path analysis
TASK Time ES EF LS LF SLACK
A 5 0 5 9 14 9
B 3 5 8 14 17 9
C 8 0 8 0 8 0
D 6 8 14 8 14 0
E 4 8 12 17 21 9
F 7 14 21 14 21 0
G 5 21 26 21 26 0
19
Gantt chart
20
Budget
Task Cost Total
Buy new equipment 25000 25000
Developer cost 325000 75000
Testing cost 215000 30000
Hired skilled designer 210000 20000
Other cost 10000 10000
Total cost 160000 TK
21
Thank you everybody