BSOP 303 Innovative Education--snaptutorial.com - PowerPoint PPT Presentation

About This Presentation
Title:

BSOP 303 Innovative Education--snaptutorial.com

Description:

1. (TCO 4) The Dulac Box plant produces 400 cypress packing boxes in on two-person assembly line during a 10-hour shift. What is the labor productivity of this assembly line? – PowerPoint PPT presentation

Number of Views:3
Slides: 6
Provided by: Richardson40

less

Transcript and Presenter's Notes

Title: BSOP 303 Innovative Education--snaptutorial.com


1
BSOP 303 Innovative Education--snaptutorial.com
2
BSOP 303 Innovative Education--snaptutorial.com
BSOP 303 Quiz 1 For more classes
visit www.snaptutorial.com   1. (TCO 4) The Dulac
Box plant produces 400 cypress packing boxes in
on two-person assembly line during a 10-hour
shift. What is the labor productivity of this
assembly line?
3
BSOP 303 Innovative Education--snaptutorial.com
BSOP 303 Quiz 5 For more classes
visit www.snaptutorial.com   1. (TCO 8) A good
layout requires determining 2. (TCO 8) A
process-oriented layout is best suited
for 3. (TCO 8) Which of the following is not an
advantage of drop shipping? 4. (TCO 8) One of the
major advantages of process-oriented layouts is
4
BSOP 303 Innovative Education--snaptutorial.com
BSOP 303 Quiz 6 For more classes
visit www.snaptutorial.com   1. (TCO 3) Which one
of the following is a benefit of the
implementation of JIT? 2. (TCO 3) In JIT
partnerships, suppliers have several concerns.
Which of the following are concerns? 3. (TCO 3)
Which one of the following is a concern expressed
by suppliers? 4. (TCO 3) Just-in-time systems
make demands on layouts, except 5. (TCO 3) Level
schedules 6. (TCO 12) __________ scheduling
begins as soon as the requirements are
known. 7. (TCO 12) The short-term scheduling
activity called loading
5
BSOP 303 Innovative Education--snaptutorial.com
Write a Comment
User Comments (0)
About PowerShow.com