ASH ENV 333 Week 5 Final Paper - PowerPoint PPT Presentation

About This Presentation
Title:

ASH ENV 333 Week 5 Final Paper

Description:

ASH ENV 333 Week 5 Final Paper Check this A+ tutorial guideline at – PowerPoint PPT presentation

Number of Views:7

less

Transcript and Presenter's Notes

Title: ASH ENV 333 Week 5 Final Paper


1
ASH ENV 333 Week 5 Final Paper
  • Check this A tutorial guideline at
  •  
  • http//www.assignmentcloud.com/env-333-ash/env-333
    -week-5-final-paper
  • For more classes visit
  •  
  • http//www.assignmentcloud.com
  •  
  • The creation of an Environmental Impact Statement
    can take two to three years to complete,
    depending on the complexity of the proposed
    project. There are numerous individuals and
    technical experts involved. For the Final Paper,
    you will develop an abbreviated form of a Draft
    Environmental Impact Statement by selecting one
    of the scenarios below.

2
  • Scenario 1
  • You are attempting to build a wastewater
    treatment plant in a newly developed urban area.
    The site is located in an attainment area. There
    is a local waterway that runs through the site.
    The area is heavily populated.
  • Scenario 2
  • You are proposing to build a power plant in an
    industrialized area. The site is located in an
    attainment area but local regulations require
    offsets be incorporated into the plan. The
    closest waterway is 1.5 miles away. The gradient
    of the land slopes towards the water. There is a
    small population of people that surrounds the
    industrial area.
  • Scenario 3
  • You are proposing to build a recycling center in
    a rural area. The area consists of numerous
    waterways. There are many farms in the area. The
    population is medium in size and spread
    throughout the area. The area is in a
    nonattainment area.
  • Scenario 4
  • You are proposing to build a shopping mall in a
    heavily populated rural area. The area adjacent
    to the site consists of a nature preserve.

3
  • The main road into and out of the site is a
    single lane road in each direction. The area of
    the site is in an attainment area.
  • Develop a scoping plan for the scenario of your
    choice. Include a minimum of three (3)
    alternatives as well as the no build alternative.
  • Discuss a minimum of three (3) important criteria
    from each chapter regarding your proposed site
    (i.e. discuss land-use and development, social
    and neighborhood effects, economic factors,
    relocations, traffic and transportation, energy,
    historic and archaeological resources, visual
    resources, air quality, noise, geology and soils,
    water resources, floodplains and coastal areas,
    wetlands, and vegetation and wildlife). It is
    understandable that every category may not be
    affected by your proposed project. However, you
    must indicate the category and include a brief
    statement as to why certain criteria do not
    apply. Since the scenarios provided may not
    address every situation that could arise, you may
    extrapolate and be creative regarding the
    surrounding area. Make sure that you support any
    decision that you make by explaining its
    importance in regards to the site and the
    community. Provide evidence throughout your paper
    to support your statements
Write a Comment
User Comments (0)
About PowerShow.com