Water And Waste Water Reuse By Vishvaraj Infra - PowerPoint PPT Presentation

About This Presentation
Title:

Water And Waste Water Reuse By Vishvaraj Infra

Description:

Water: The rapidly urbanizing Indian population is expected to reach a figure close to 600 million urban people by 2031. This massive transition is creating serious challenges for urban planners and ULBs, especially which of ensuring quality water supply to these citizens. Indian cities have for long lived with intermittent water supply systems riddled with a variety of problems ranging from high levels of NRW to contamination issues. As a solution to this situation several reforms have been initiated by the government which include introduction of performance linked PPP contracts, up gradation of existing ageing assets, 100% metering and efficient operation and maintenance of the supply system. – PowerPoint PPT presentation

Number of Views:159

less

Transcript and Presenter's Notes

Title: Water And Waste Water Reuse By Vishvaraj Infra


1
Water And Waste Water Reuse By Vishvaraj Infra
2
Water The rapidly urbanizing Indian population
is expected to reach a figure close to 600
million urban people by 2031. This massive
transition is creating serious challenges for
urban planners and ULBs, especially which of
ensuring quality water supply to these citizens.
Indian cities have for long lived with
intermittent water supply systems riddled with a
variety of problems ranging from high levels of
NRW to contamination issues. As a solution to
this situation several reforms have been
initiated by the government which include
introduction of performance linked PPP contracts,
up gradation of existing ageing assets, 100
metering and efficient operation and maintenance
of the supply system. 
http//vilnagpur24x7project.blogspot.in
3
Water companies globally are developing
technologies and management systems to deal with
these challenges. Vishvaraj Infra however
understands that the Indian context is different
and it needs solutions which are local,
competitive and socially acceptable. We develop
implementation strategies keeping local situation
in perspective as water is a very sensitive
subject in our country. For us, driving
innovations, creating sustainability,
technological advancements, environmental
friendliness and peoples involvement are the key
drivers for the company in this sector. Some of
our projects are Nagpur 24x7, PCMC Project,
Magadi 24x7, Bidar Basavakalyan and Shahabad
Yadgir Project.
https//vishvarajinfrastructure.wordpress.com
4
Waste Water Reuse A Civic Necessity and a
Business Opportunity. In contrast the demand for
fresh water is growing rapidly, estimated to go
from 813 BCM today to 1,447 BCM by 2050, whereas
the resource base remains constrained at 1,122
BCM. The industrial sector, which is one of the
major users of fresh water, mostly puts fresh
water to non-potable. Wastewater treated up to
secondary level can easily be utilized for this
purpose freeing up massive amounts of freshwater
for domestic consumers.
http//vilnagpur24x7project.blogspot.in
5
This can easily be achieved by improving the
municipal wastewater collection, treatment and
reuse thus not only recycling wastewater which is
otherwise lost but also save the downstream water
bodies from pollution. This is the win-win
proposition of Vishvaraj Infra model for the all
the stakeholders, a unique example of creating
value from waste whilst contributing positively
to environmental sustainability.
https//vishvarajinfrastructure.wordpress.com
6
Amongst the challenges thrown up by increased
urbanization in India one of the bigger ones is
massive increase in wastewater generation. The
Central Pollution Control Board (CPCB) estimates
that about 80 percent of the water supplied for
domestic use is discharged as wastewater. This
pollutes the downstream areas as it enters
untreated into these water bodies. Around 38,250
MLD of wastewater is generated by class I and
class II cities in India, which is estimated to
grow 3.5 times to 132,250 MLD by 2050. The
current wastewater treatment capacity can handle
only 30 percent of the total generation, out of
which too only 55 percent is operational. This
translates to an investment gap of over USD 7
Billion for class I and class II cities by
2016-17. 200 MLD Waste Water Treatment Project in
Nagpur is one of our major projects in Waste
Water Reuse.
http//vilnagpur24x7project.blogspot.in
7
Vishvaraj Infrastructure Blogs
http//vilnagpur24x7project.blogspot.in
https//vishvarajinfrastructure.wordpress.com
8
Social Media
https//twitter.com/vishvarajinfra4
https//plus.google.com/117536226104607847185
https//www.facebook.com/vishvarajinfra
9
Vishvaraj Infrastructure Website
http//vilindia.com
10
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com