Title: Your Deliver Method''' Pick it Early


1
Your Deliver Method... Pick it
Early
  • Doug Evans
  • Vice President
  • Vanir Construction Management

2
Introduction
  • Fredric Sherman, AIA
  • Principal
  • HGA Architects
  • Lou Shikany
  • Construction Program Manager
  • Technical Services Division
  • County of Alameda
  • Tim Murchison
  • Project Director
  • Vanir Construction Management

3
Overview
  • Project Delivery Methods
  • DesignBidBuild
  • CM At-Risk
  • Multi-Prime (Trade Contracting)
  • Design-Build
  • Contractual Relationships
  • Scope, Cost Time Impacts
  • Risk
  • Pros Cons

4
Project Elements
SCOPE
Project Success
TIME
COST
5
Project Delivery Methods
  • Design-Bid-Build
  • CM At-Risk (CM/GC)
  • Trade Contracting/Multiple Prime
  • Design-Build

6
Traditional Design-Bid-Build
Contracts
Communication
7
Traditional Design-Bid-Build
8
Traditional Design-Bid-Build
  • Three sequential phases
  • Four prime players
  • Owner
  • Construction Manager
  • Architect
  • Contractor
  • Three separate prime contracts

9
Traditional Design-Bid-Build
  • Process
  • Owner selects CM Architect
  • Architect designs project
  • CM provides management support
  • Owner, CM Architect publicly bid a single prime
    contract
  • Contract awarded to low bidder
  • General Contractor constructs project
  • General Contractor manages sub-contractors
  • CM Architect provide oversight

10
CM at Risk (CM/GC)
11
CM at Risk (CM/GC)
  • Three sequential phases
  • Three prime players
  • Owner
  • Architect
  • At-Risk CM (General Contractor)
  • Two separate prime contracts
  • Price Guarantee Point Varies

12
CM at Risk (CM/GC)
  • Process
  • Owner selects Architect CM_at_R
  • Architect designs project
  • CM_at_R provides support
  • At some point GMP defined
  • (At-Risk relationship established)
  • Owner CM_at_R publicly bid multiple trade
    contracts (sub-contractors)
  • Contracts awarded to lowest bidders
  • Owner assigns contracts to CM_at_R
  • CM_at_R manages construction
  • Architect provides oversight

13
Multiple Prime (Trade Contracting)
14
Multiple Prime (Trade Contracting)
  • Three sequential phases
  • Three prime players
  • Owner
  • Architect
  • Construction Manager
  • Multiple Prime Contracts
  • Architect Construction Manager
  • Prime Trade Contracts (Sub-Contractors)
  • All contracts with Owner

15
Multiple Prime (Trade Contracting)
  • Process
  • Owner selects CM Architect
  • Architect designs project
  • CM provides management support
  • Owner CM publicly bid multiple trade contracts
    (sub-contractors)
  • Contracts awarded to lowest bidders
  • CM manages construction
  • CM Architect provide oversight

16
Design-Build
17
Design-Build
  • Three continuous phases
  • Four prime players
  • Owner
  • Construction Manager
  • Scoping Architect
  • Design- Build Contractor
  • Three separate prime contracts

18
Design-Build
  • Process
  • Owner selects CM Scoping Architect
  • Owner, CM Architect develop scoping documents
    (Bridging Documents)
  • Selection of Design-Build Entity
  • D/B completes design of project
  • Owner approves design and authorizes construction
  • D/B secures sub-contractors
  • D/B manages construction
  • CM provides oversight

19
Items for Consideration
  • Change Orders
  • Price Confirmation
  • Risk for
  • Cost
  • Time
  • Quality
  • Control of
  • Cost
  • Time
  • Quality

20
Questions?
21
Traditional Design-Bid-Build
  • Pros
  • Most common method
  • Best understood
  • Most well-established law
  • Considered best design quality
  • Considered lowest initial cost
  • Fairest to bidders, level playing field
  • Cons
  • Low Bid Contractor
  • Generally slowest method
  • High change order costs
  • High litigation

22
CM at Risk (CM/GC)
  • Pros
  • GC selected (as CM) on qualifications
  • Design assistance reduces EO
  • GMP approach reduces COs
  • Reduces claims
  • Owner knows costs up front
  • Cons
  • Not time tested in Public projects
  • Some jurisdictions not authorized
  • CM has normal GC conflict of interest
  • No CM advise during construction

23
Multiple Prime (Trade Contracting)
  • Pros
  • CM remains in fiduciary role
  • More project control
  • Fast track by major trades
  • Clearly identifies sub costs
  • Encourages small local contractors
  • Reduces bid claim potential
  • Cons
  • Multiple contracts are burdensome
  • Lacks a single point of responsibility
  • More control more liability

24
Design/Build
  • Pros
  • Single point responsibility
  • Tends to be fastest method
  • Avoids EO liability issues
  • Maximum transfer of risk
  • Cons
  • Requires increased owner sophistication
  • No normal architect advocacy
  • Design quality may be compromised
  • Reduces design input by Owner

25
Your Deliver Method... Pick it
Early
  • Doug Evans
  • Vice President
  • Vanir Construction Management