Title: NANC Report Numbering Oversight Working Group NOW
1NANC Report Numbering Oversight Working
Group(NOWG)
- May 17, 2005
- Co-Chairs
- Rosemary Emmer, Nextel
- Karen Riepenkroger, Sprint
2Contents
- NOWG Active Carrier Participant List
- PA Change Order Recommendation for 40, 41
- NANPA Change Order Recommendation for 5
- New PA Technical Requirements
- Status of NANPA and PA 2004 Performance Surveys
- NOWG May-June 2005 Meeting Schedule
3NOWG Active Participants
- Alltel
- ATT
- Bell South
- Cingular Wireless
- Cox Communications
- MCI
- Nextel
- Qwest
- SBC
- Sprint
- T-Mobile
- Verizon
- Verizon Wireless
4PA Change Order Recommendations
- Change Order 40 dated April 6, 2005
- Purpose To add an additional pooling
administrator to the current staff to help manage
the increase of applications received by the PA. - NOWGs assessment Section 2.3 of the PA
Technical Requirements dated November 30, 2000
reads Pooling administration staffing shall be
at appropriate levels to ensure that the
contractor can efficiently perform the functions
as identified. The NOWG believes that the
staffing requirements should be met within the
parameters of the current technical requirements
under which the current contract was awarded. - Recommendation - The NOWG recommended that this
change order not be approved.
5PA Change Order Recommendations Continued
- Change Order 41 dated May 4, 2005
- Overview In Change Order 24 the NOWG
recommended the PA conduct a one-time scrub of
the PAS database using NPAC data. This lead to
Change Order 26 in which the PA analyzed a
sampling of one NPA in each NPAC region to
determine the scope of the contamination issue
with donated block(s). Note the NOWG determined
that a one-time scrub of the PAS database was
warranted at the time due to the proposed costs
associated with Change Order 24. The outcome of
these two events has lead to Change Order 41. - Purpose of Change Order 41 To implement the
NOWGs recommendations made to Change Order 24
for a one-time scrub of the PAS database and
outlines other various items the PA will do in an
attempt to educate SPs on their responsibilities
when donating block(s) to the pool (such as,
adhering to the 10 contamination rule,
completing intra-service provider ports prior to
donation of block(s), and correctly indicating
whether or not the block(s) are contaminated). - The NOWG requests that the PA present the
results of the one time scrub to the NOWG via a
conference call using the same format as the
sample report generated from Change Order 26.
One year after the reconciliation, the NOWG and
the PA will seek input from the industry as to
any increase or decrease in the frequency in
which SPs are encountering erroneous block
contamination. - It is the understanding from Change Order
41, that the straight overtime cost is included
in the 6,209 anticipated cost to implement the
proposed change order. - Recommendation - The NOWG recommended that this
change order be approved. Due to the critical
nature of this issue, the NOWG also recommends
that the FCC stipulate upon approval that the PA
initiate work within 30 days and then complete
their tasks within 120 days or less.
6NANPA Change Order Recommendations Continued
- Change Order 5 dated April 22, 2005
- Purpose - To propose a change of scope to
existing NANPA operations and eliminate the
current manual process for retrieving NRUF
Form 502 EXCEL spreadsheets from the
cocus_at_neustar.com mailbox and parse the data.
This change order will automate the entire
process and change the location of the NRUF data
(emails and spreadsheets) from the current
location on NeuStar corporate resources to a new
server dedicated to NRUF. There is no cost
associated with this change order. - Background NRUF was not included when NANPA
rolled out the Number Administration System
(NAS) on February 9, 2004. It was later added to
NAS on May 24, 2004. Since then NANPA has been
using a Microsoft Access database (tool) to
retrieve the NRUF Form 502 EXCEL spreadsheet(s)
from the emails sent by service providers. - This tool ensured that the data extracted
from the EXCEL spreadsheet(s) included both the
data as submitted in the spreadsheet(s) by the
service provider as well as the data calculated
by a formula contained within the spreadsheet
(e.g., quantity of available numbers and
utilization). This change order will automate the
process thereby eliminating the need of the NANPA
staff to do this manually. It will also store
the email(s) and data on a new server that will
be dedicated to NRUF and remove the existing
information from NeuStar corporate resources. - Recommendation - The NOWG recommends approval of
this change order.
7New PA Technical Requirements
- Review current PA Technical Requirements for
necessary changes Completed - Identify sections to modify and upgrade as
appropriate Completed - Recommendation to the NANC/FCC for consideration
at the March 15, 2005 meeting Completed - Receive feedback and finalize changes to PA
Technical Document In Progress - NOWG to recommend new PA Technical Requirements
Document to the NANC July, 2005 NANC meeting
8Status of NANPA and PA 2004 Performance Surveys
- NANPA and PA surveys were distributed via bulk
e-mail by the NANPA and PA administrators as well
as posted to each of their web sites. The NARUC
and the INC sent notices via their distribution
channels. All parties sent reminder e-mails and
the response due date was extended to March 31st. - The NANPA operational review was held in
Sterling, VA in March and the PA operational
review was held in Concord, CA in April. - The NOWG met in Denver, CO the week of May 2nd to
compile the survey results and to begin both
draft evaluations. - Conference calls will continue to be held until
the preliminary report is completed. The
tentative date to share the preliminary report
with the FCC, NANPA and the PA is June 22, 2005.
- The NOWG will deliver both final performance
evaluations to the NANC at the July NANC meeting.
9NOWG May-June 2005 Meeting Schedule
Contact either of the Co-Chairs for complete
meeting or conference call details Rosemary.Emmer_at_
nextel.com or Karen.S.Riepenkroger_at_mail.sprint.com
(Other meetings for the NOWG may be scheduled as
needed beyond what has been identified in this
list) NOWG meeting notes and documents are posted
at nanc-chair.org