Title: Chamber Design Status


1
Chamber Design Status
  • ME 234/2 Chambers
  • Design Drawings Complete and Released -
    Production Parts being Ordered
  • Changes to Frame and Cable Drawings are Expected
    as Designs are not Finalized
  • ME 234/2 Tooling
  • Design Drawings Complete and Released except as
    noted
  • Panel Transport and Storage Box (Cleaning
    Machine _at_ Aurora to MP9) Currently being
    designed. Should complete design and order by
    mid January.
  • Chamber Shipping Containers Should complete
    design and order by mid February.
  • MP-9 Panel Vacuum Lifting and Handling Equipment
    No drawings required System is on order and due
    in early January.
  • No documentation currently exists for Soldering
    Machine An effort to document design and
    construction expected to be started in January,
    2000 (Anticipate duplicate machines may be
    required for IHEP and PNPI).
  • Purdue to provide Drawings and Operating
    Procedures for Tension and Wire Spacing Test
    Equipment by beginning of January, 2000
  • Major Manufacturing Tooling is in place and
    Operational.
  • At least one set of all other tooling is
    available and ready for use Additional Carts,
    Tables, Support Brackets, and Consumables needed
    for larger scale production are on order.

2
Chamber Design Status
  • ME 1/2 Chambers
  • Prototype design drawings complete released
    Some Chamber drawing changes are required to
    update designs to Production Ready
    configurations.
  • Changes to Frame, Cable and Assembly Drawings are
    expected as these designs are not finalized.
  • Parts have been procured for 2 prototype chambers
    plus 1 anode panel. Assembly of 1st. Prototype
    is in process A few parts are yet required are
    due soon.
  • Production Ready Drawings to be completed in
    January Orders for Chamber Specific Production
    Parts to be placed at that time.
  • ME 1/2 Tooling
  • Design drawings have been completed and orders
    have been placed for the following items
  • Winding Machine including Combs
  • Tape Glue Dispenser
  • Ionized Air Cleaner
  • One Panel Cart with one Set of Panel Supports
  • One Chamber Cart with one set of Chamber Supports
  • Three sets of Wire Fixation Bar Protective Strips
  • Tension Tester under development at Purdue.
  • Remainder of Tooling Needs under discussion.

3
Chamber Design Status
  • ME 2/1 Chambers
  • Final Design is Complete and All Chamber Drawings
    Released
  • Changes to Frame, Cable and Assembly Drawings are
    expected as these designs are not finalized.
  • A Kit consisting of one set of Prototype Chamber
    Parts and the Tooling listed below is being
    prepared for shipment to PNPI.
  • Requests for Quotations of all Non-Common
    Production Parts now being placed.
  • ME 2/1 Tooling
  • Design drawings have been completed and orders
    have been placed for the following items, most of
    which have been assembled at MP-9
  • Winding Machine including Combs
  • Tape Glue Dispenser
  • Ionized Air Cleaner
  • One Panel Cart with one Set of Panel Supports
  • One Chamber Cart with one set of Chamber Supports
  • Three sets of Wire Fixation Bar Protective Strips
  • Tension Tester under development at Purdue.
  • Remainder of Tooling Needs under discussion

4
Chamber Design Status
  • ME 3/1 Chambers
  • To Complete Design and Release for Ordering by
    2/1/00.
  • ME 3/1 Tooling
  • To Complete Design and Release for Ordering of
    the following Unique Required Tooling by 1/1/00
  • Winding Combs
  • Panel Support Brackets
  • Chamber Support Brackets
  • Wire Fixation Bar Protective Strips
  • ME 1/3 Chambers
  • To Complete Design and Release Chamber
    Components by 2/1/00 and Assemblies by 2/15/00.
  • ME 1/3 Tooling
  • To Complete Design and Release for Ordering of
    the following Unique Required Tooling by 2/1/00
  • Winding Combs
  • Panel Support Brackets
  • Chamber Support Brackets
  • Wire Fixation Bar Protective Strips

5
Chamber Design Status