Wire Procurement and Wire Joint Production - PowerPoint PPT Presentation

About This Presentation
Title:

Wire Procurement and Wire Joint Production

Description:

Toshiba was considered the highest quality from initial test ... Mass Spectrograph of 'Dark Area' 26 September 2000. Fowler Duke HEP. Diameter Analysis ... – PowerPoint PPT presentation

Number of Views:161
Avg rating:3.0/5.0
Slides: 11
Provided by: johncca2
Category:

less

Transcript and Presenter's Notes

Title: Wire Procurement and Wire Joint Production


1
Wire ProcurementandWire Joint Production

Jack Fowler
2
Sense Wire Procurement
  • Luma, Osram and Toshiba wires were evaluated
  • Toshiba was considered the highest quality from
    initial test
  • Two pre-series of wire have been procured from
    Toshiba
  • Both have been evaluated
  • One has been approved and is being used in
    production
  • Full production order being submitted
  • Audit of facility tentatively scheduled for Oct
    2000

3
Evaluate Cleaning Effects
  • Evaluate the affects of cleaning the wire in
    ultrasonic cleaner after wire joint process
  • First evaluate any damage to the wire due to the
    cleaning
  • Second evaluate the effectiveness of the cleaning
    process
  • Samples were evaluated uncleaned, after 30
    seconds, 1 minute, 5 minutes, and 10 minutes
  • 30 seconds was found to be as effective as longer
    cleanings

4
Cleaning Results
30 seconds
Uncleaned
5
Cleaning Results
1 minute
5 minutes
6
Cleaning Results
10 minutes
Analysis of dark area
7
Mass Spectrograph of Dark Area
8
Diameter Analysis
9
Evaluate Wire for Damage
  • Evaluate any damage of wire outside of the glass
    bead during the fusing process
  • No damage has been detected
  • Further testing will follow
  • Also evaluating the cleanliness of wire after the
    production process

10
Production and Wire Analysis Results
  • Actual Wire Joints produced - 4606 single, 270
    double
  • Planned Wire Joints - 6500 single, 600 double
  • Second wire joint station online in November 2000
  • Production goal 120 to 150 daily
  • Wire meets specification based on our testing
  • More studies on cleanliness after production
    planned
Write a Comment
User Comments (0)
About PowerShow.com