Title: Energy Efficient Technologies Screening Process
1Energy Efficient Technologies Screening Process
- Recent ECM Simulations for Annex 46 Archetypes
Dan Fisher, Oklahoma State University Jon Hand,
University of Stratheclyde
2Overview
- The archetypes
- Selected US Simulation Results
- Extending Simulation to Annex 46 Participant
Countries
3The Archetypes
- Industrial Building
- Office
- Barracks
4Industrial Model
5Industrial Model
6US Construction
- 6 inch concrete walls (pre-cast)
- 2 inch built-up roof
- Uninsulated slab floor
- 10 glazing in process area
- 25 glazing in office area
- Four 12 x 15 doors in shipping area
7US HVAC Controls
8US Internal Gains
9Office Model
10Office Model
11Office Specifications
12Barracks Zoning
13Barracks
14Barracks Specifications
15Internal Heat Gains
- Office
- 1 W/ft2
- Occupied from 800 am 500 pm
- Barracks
- 0.7 W/ft2
- Occupied from 500 pm 800 am
16Facade
- Office
- Double pane windows 32 of façade area
- Brick/block construction
- Barracks
- Double Pane windows 10 of façade area
- Stick-frame construction
17HVAC System
- Office
- VAV with CW cooling and HW reheat
- Cooling 75 heating 72
- Barracks
- CV with DX cooling and gas reheat
- Cooling 75 Heating 72
18Office HVAC System
19Barracks HVAC System
20Initial Parametric Study
- Industrial building model
- first 20 Energy conservation measures and
technologies. - 12 US climates
- 3 energy cost levels
- Office and barracks models
- first 40 energy conservation measures and
technologies - 12 climates
- 3 energy cost levels
21Simulation Results
- Diagnostic Results
- Energy Summary Reports
- Economic Reports
22Diagnostic Results
- Zone temperatures
- Zone loads
- Outside air flow rates
23Diagnostic Results Barracks
24Diagnostic ResultsBarracks
25Diagnostic Results Office
26Diagnostic Results Office
27Diagnostic Results Office
28Standard Results
- Total Estimated Annual Energy Use
- by building type
- by climate
- Estimated Annual Energy Cost
- by energy type
- Simple Payback Calculation
- based on estimated cost of technology
29Total Annual Estimated Energy Savings
- Solar wall industrial building
30Annual Estimated Energy Cost
- Gas energy solar wall industrial
31Simple Payback Calculation
- Attic Insulation Barracks
32Extending Results to Annex Countries
- Customize the building Envelope
- wall/roof/window constructions
- window area
- Customize the HVAC system
- concept/configuration
- controls
- Compile weather files
- one city for each climate zone
- Compile energy price data
- high/low/avg. for each climate zone
33Country/Building Specific Simulation Driver
- A low tech approach
- combination of batch files and fortran
executables - start with country/building specific base-line
model - Parametric run generator. For each ECM
- creates input file
- runs the simulation
- saves diagnostic data
- writes standard output to a file
34Country/Building Specific Spreadsheet
- Standard format output from simulation
- VBA data analysis Code
- Country/Climate Zone specific Energy Costs
35Project Status
- 12 US Climate Zones
- 20 Industrial ECMS complete
- 15 Office/Barracks ECMs complete
- 1 or 2 Climate Zones from Germany, Uk, Canada,
Denmark, Finland, Italy, France - 5 office/Barracks ECMsfirst draft
36Next Steps
- Tune-up Envelope Specifications
- Modify HVAC system configuration/controls
- Climate-zone specific energy cost data