XIV Conference - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

XIV Conference

Description:

In the enlargement process, for the implementation of the 'Acquis Communautaire' ... 2002 Issue Paper 'Enlargement and Agriculture: Successfully integrating ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 25
Provided by: simo62
Category:
Tags: xiv | conference

less

Transcript and Presenter's Notes

Title: XIV Conference


1
The Commissions approach for the implementation
of IACS in the Candidate CountriesCurrent state
of play
  • Olivier LEO
  • DG. JRC, IPSC
  • MARS Unit

2
Summary of the presentation
  • Historical background
  • Who does what ?
  • In the enlargement process, for the
    implementation of the Acquis Communautaire
  • DG ENLARGE, DG AGRI, DG SANCO, DG JRC
  • The 3 pre-accession instruments
  • PHARE, ISPA, SAPARD,
  • Support, monitoring and ongoing pre-Audit
  • The state of play in IACS, in LPIS

3
Historical background
  • An old story, with a recent acceleration
  • 1989 Fall of the Berlin Wall
  • 1990 CY and MT applies to EU
  • 1991 European Agreements with CZ, HU, POL
  • 1993 Copenhagen EU Council Political and
    economic criteria
  • 1994 Candidature of HU, POL
  • 1995 Enlargement of EU SW, FIN, OST
  • 1995 Candidature of BG, EST, LAT, LIT, RO, SK
  • 1996 Candidature of CZ, SLO
  • 1997 Luxembourg EU Council Open negotiations 6
    CC
  • March 98 Start of the negotiations
  • (Hu, P, Cz, Est, Slo, Cy)
  • Feb 99 Idem for (Sk, Lat, Lit, Mt, Bg, Ro)
  • 1999 Berlin EU Council Open negotiations
    with 10 CC. Allocate budget of 3, 1 Bio EUR /
    year for 2000- 2006 (Phare, Sapard, ISPA)

4
Historical background
  • An old story, with a recent acceleration
  • Dec 99 Proposal of CC on Chapter 7 Agriculture
    (Luxembourg Group)
  • June 2000 EU common position on Chapter 7
  • 2000 Adoption of SAPARD program for the 10 CC
  • 2000 Publication of the third progress report
  • 2000 Road maps (time table to conclude
    negotiations)
  • Dec 2000 Nice EU Council Distribution of seats,
    weighting of votes
  • 2001 Signature of SAPARD x-annual agreements
    (9CC)
  • January 2002 Issue Paper Enlargement and
    Agriculture Successfully integrating new MS
    into CAP
  • December 2002 Copenhagen Council
  • 1 May 2004 Date of accession, 10 CC
  • More details on accession process ?
    http//www.europa.eu.int/comm/enlargement/

5
The commission Approach
  • Specific case of Agriculture
  • Accession partnerships
  • National program for the adoption of the Acquis
    (NNPAs)
  • Double zero agreement (Agriculture trade
    exempted of duty x more than 2-3 EU imports 88
    , EU exports 75 (00)
  • Chapter 07 (Agriculture) one of the most
    important over 31
  • CAP Strategy (Agenda 2000)
  • Modulation of direct payments
  • 25 (04)- 35 (06) 100 (2013)
  • Intensified support for restructuring (RD)
    Co-funded 75
  • SAPARD funds (Special accession prog. For
    Agriculture and Rural Development)
  • IACS is a key element of the Acquis
    communautaire

6
The commission Approach
  • The Commission approach
  • IACS proposal of simplified Schemes for C.C
  • Single area payment Scheme proposed in 2001
  • Accession treaty will modify accordingly Counc.
    Reg 1259/99
  • Requirement to have a application Reg (DG AGRI
    C1)
  • Follow up of pre accession The various technical
    services of the Commission are involved
  • Screening and negotiations
  • Revision of national Phare, Sapard programs
  • Technical support (JRC, TAIEX)
  • Monitoring and pre-audit

Who does what?
7
Who does what ?
  • The main DG involved in Enlargement CAP

Candidate country
DG Trade
Candidate country
Candidate country
DG Trade
Candidate country
DG Transport
Candidate country
Candidate country
DG Transport
Candidate country
DG ENLARG
Candidate country
Candidate country
Candidate country
Candidate country
DG SANCO
Candidate country
Chapt 7
DG AGRI
DG JRC
8
Who does what ?
  • DG Enlargement
  • Coordination of the Negotiation process
  • Management of PHARE programs
  • pre adhesion program for MT and CY
  • Final responsibility of reporting on progress
  • Geographic structure (bilateral)
  • Relies on other DG for technical advise
    (validation of programs, monitoring, etc)
  • TAIEX office (Technical assistance information
    exchange office set up in 96)
  • Logistical support for invitation of experts,
    organisation of workshops etc

9
Who does what ?
  • DG Agriculture. Main units involved
  • Unit A II.2 International affairs enlargement
  • Head of Unit Richard MOEGELE General
    coordination of Enlargement and Agriculture
  • Unit F4 Sapard Management of SAPARD funds
  • Unit G 1 Conception of simplified Scheme
  • Direction J Audit of Agricultural expenses
  • Director Chantal HEBETTE
  • Unit J 1 (horizontal financial Audit) Michele
    OTTATI
  • Accreditation of SAPARD funds
  • Unit J 2 (Audit of Market measures) Hans BARTH
  • Unit J 3 (IACS Audit of direct aid) Richard
    ETIEVANT
  • Monitoring and pre audit of IACS / arable
  • Unit J 4 (Audit of Rural Development) Paul WEBB

10
Who does what ?
  • DG SANCO (Health consumer protection)
  • Mission statement Implement the responsibility
    entrusted to it by the Treaty and derived
    legislation so as to ensure that a high level of
    human health and consumer protection is attained
    throughout the EU.
  • Covers Public Health Food safety Veterinary
    and phyto-sanitary standards and controls inc.
    animal welfare Scientific advice consumer
    protection.
  • Direction E Food safety, plant health, animal
    health Welfare, International questions
  • Director Alejandro CHECCI LANG
  • Unit E 2 Animal Health and Welfare, Zootechnics
    Bernard Van GOETHEM
  • Animal registers and monitoring Veterinary
    Services

11
Who does what ?
  • DG JRC (Joint Research Centre)
  • The JRC mission is to provide scientific
    technical assistance to the other DGs for the
    implementation and the monitoring of the
    Policies.
  • MARS Unit (IPSC) Jacques DELINCE , Olivier LEO
  • Technical arm of DG AGRI for LPIS, CwRS, GPS
    field measurement
  • IDEA Project (IPSC) André POUCET , KORN
  • Electronic identification of Animals (for DG AGRI
    )
  • Specific PECO Budget Since 2001, JRC allocates
    20 Mio for specific PECO activities
  • Various projects,
  • reinforcement of partnerships with University and
    Research institutes from PECO Countries.
  • hosting Visiting Scientists, Detached national
    experts, Grant holders
  • MARS PECO 500 000 /year

12
The Pre-accession Instruments
  • The 3 Pre accession instruments for 2000 -2006
  • PHARE 1.5 Bio /an
  • ISPA (Instrument for Structural policies for
    Pre-Accession) is intended to finance
    environmental and transport infrastructure
    measures (Reg (EC) No 1267/1999)
  • 1.04 Bio /an
  • SAPARD (Special Accession Program for
    Agriculture and Rural Development) 520 Mio /
    an

13
The Pre- accession Instruments
  • PHARE
  • Program set up in 89 for 10 CC
  • 1.5 Bio /year (2000- 2006)
  • (Before 2000, covered also Albania, Bosnia,
    Macedonia of FYR)
  • with 2 focus
  • Institutional building (30 of budget)
  • Investment support (70)
  • In 99 (SAPARD, ISPA) Economic and social
    cohesion
  • Modalities
  • Contracts till 99
  • Twinning since 98 475 Twinning (98-01)
  • MT, CY, T separate pre accession fundings.

14
The Pre-accession Instruments
  • ISPA
  • Program set up in 99 for 10 CC
  • Co funding (up to 85) 1.04 Bio /year
    (2000- 2006)
  • Activities
  • Similar to Cohesion funds for Greece, Spain,
    Portugal, Ireland
  • Major infrastructure projects in field of
    environment infrastructure
  • Drinking water supply,
  • Treatment of waste water,
  • Solid waste management
  • Reduction of air pollution
  • Improvement of transport infrastructure
  • Indicative allocation
  • MT, CY, T separate pre-accession funding.

15
The Pre-accession Instruments
  • SAPARD
  • Special accession programme for Agriculture and
    Rural development
  • Council Reg 1268/99, 21 June 1999
  • Budget 530 Mio Euro / year , from 2000 2006
  • Covers 10 C.C (all except MLT, CY, T)
  • Allocation defined by Commission
  • Criteria Farms, Agricultural area, GDP per
    capita, environment constraints
  • Aims
  • Support the implementation of acquis
    communautaire
  • In the area of CAP and Rural Development

16
Pre-accession Instruments
  • SAPARD
  • Yearly Budget available
  • Support for the a wide range of measures 15 type
    of activities
  • Improvement of process marketing of agri /
    fish products
  • Improvement of infrastructures for quality, vet
    and plant disease, consumer protection
  • Investments in agricultural holdings

17
Pre-accession Instruments
  • 15 types of actions eligible for SAPARD funding
  • Specific measure for semi-subsistence farms /
    Diversification / multiple activities
  • Early retirement schemes / Setting up farm relief
    / farm management services
  • Setting up of producer groups
  • Land improvement and re-parcelling
  • Establishment and updating of land registers
  • Agricultural practices / protect environment
    maintain Landscape (Less favoured area or
    environmentally vulnerable zones)
  • Renovation and development of village / rural
    heritage
  • Development and improvement of rural
    infrastructure
  • Management of agricultural water resources
  • Afforestation of agricultural land/ investments
    in forest holdings
  • Improvement of vocational training
  • Technical assistance for measures covered by Reg
    1268/99

18
Pre-accession Instruments
  • Modalities of SAPARD financial management
  • Decentralisation of programme management
  • Build up the technical capacities of national
    Administrations
  • Programs prepared by CC submitted to Com. For
    approval (End 2000)
  • Differentiated appropriations
  • Separation between commitments and payments
  • Application of EAGGF clearance of Account
    procedures
  • Implement and monitor the program
  • Make payments to beneficiaries
  • SAPARD Ag. is supervised by competent Authority
    (National Fund)
  • Ensure that agency meets standards in
    Administration, payment, control, accounting
    procedures
  • Independent certifying Body to check annual
    accounts
  • Monitoring Committee to supervise the programme
    execution
  • Checks by EU Commission and Court of Auditors.
  • Accreditation process of SAPARD Agencies
  • Responsibility UNIT J 1 DG AGRI (May 01 - Nov
    02)

19
Pre-accession Instruments
  • SAPARD Agency
  • Core functionalities criteria of an EAGGF
    paying Agency
  • Future IACS Paying Agency ?
  • Paying agency following criteria of Reg
    1663/95
  • But subsidiarity principle
  • A new Paying Agency integrating all CAP schemes
    (and not only IACS)
  • SAPARD
  • National Schemes
  • Intervention funds
  • Intention of Czech Republic Poland, Slovak
    Republic
  • Keep the SAPARD Agency and extend its competences
    reinforce its resources

20
From support to audit ?
  • Since 3 years technical support moves
  • to get a flavour of pre audit
  • IACS workshops organised in Brussels (TAIEX,
    Agri, JRC)
  • TAIEX 25-26 June 2001 12 CC, Allocution of
    Franz Fischler
  • TAIEX 24-25 April 2002 13 CC, complete
    presentation
  • AGRI 13 February 2003 10 CC, organised by DG
    AGRI
  • PEER REVIEWS missions to monitor Candidate
    Countries
  • June- July 2002 Initiative of DG ENLARGE / TAIEX
  • Review of implementation of Acquis
  • Involve representatives of present MS
    administrations, DG AGRI and JRC
  • Reports and recommendations 7 CC Lit, Lat,
    Est, Pol, Hu, SK, CY
  • PRE- AUDIT Missions
  • Provide an Report to the Council on the capacity
    of CC to actually run IACS after adhesion
  • 6 months before Accession date (1 may 2004) i.e
    31 October 2002.
  • Identify in advance possible problems and provide
    recommendations

21
From support to audit ?
  • PRE- AUDIT Missions
  • A comprehensive work program organised by DG AGRI
    (Unit J3 / Audit of Agricultural expenditure
    IACS)
  • 13 missions for 10 CC (2 missions for SK, POL,
    HU)
  • Team of 3 persons per mission (3 days) , involve
    14 auditors
  • Support of the JRC for technical issues (LPIS,
    CwRS)

22
General State of play ?
  • Premature to indicate results of on going
    pre-audit
  • Rather general indication
  • Most advance Candidate Countries
  • IACS systems and databases in place
  • Already generalised and used for national schemes
  • Quite advanced Candidate countries
  • Candidate countries raising specific concerns
  • Still LPIS to develop
  • IACS software or Hardware to be contracted
  • Organisational issues
  • Paying Agency, regional deployment
  • Reinforcement and training of staff
  • Absence of national schemes
  • Involvement of farmer in declaration process

Slov, CZ ...
Lit, Est, CY, MT...
Pol, Hu, SK, Lat
23
General State of play ?
  • General State of play on LPIS and GIS
  • Parcel identification system was a main concern
  • Since early Phare funding Land registry projects
    are mostly funded by PHARE (sometimes in
    conjunction with World Bank SLOV, BUL)
  • Complex problems
  • Land re-privatisation and /or Redistribution
  • Updating and modernizing Cadastre
  • Unknown ownership (cf State Land Funds)
  • Since first contacts (2000, Taiex 01), JRC passed
    the messages
  • LPIS doesnt mean Cadastre / Experience of the 15
    MS
  • Develop LPIS within a global vision of GIS (reg
    1593/00)
  • 2 errors to avoid
  • Using cadastre without orthophotos
  • Creating a new system... without links to
    farmers.

24
General State of play ?
  • General State of play on LPIS and GIS
  • All 10 Candidate countries use an orthophoto
    coverage
  • only exception CY
  • ( Satellite ortho-image in project)
  • An important support
  • for eligibility checks
  • Reference varies between 2000 -2002,
  • according to CC
  • Not yet decided for BUL, RO, T.
  • 3 CC will use Cadastre
  • Slovenia
  • (from M Theresian) / x purpose cadastre funded
    by World bank
  • Poland
  • Rather recent Cadastre Very small farmers
    /Scanned centroid / orthos
  • Cyprus (Regular Kitchener) digitized by MoA,
    Comb. With Physical blocks /orthos
  • 7 CC will create specific systems based on
    orthophotos
  • Physical blocks systems (Baltic)
Write a Comment
User Comments (0)
About PowerShow.com